← Back
Miscellaneous two family
689 STERLING PLACE
BROOKLYN · BIN 3031442
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6BZoning
2,891 sfGross Floor Area
2Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 2,555 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRO BUILDERS R CONSTRUCTION1107/08/2026
STERLING DEV CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2023$2.9M—— → —$994/sf building
07/13/2022$950K—STONEBLUE EQUITIES, INC. → STERLING DEV CORP.$329/sf building
06/23/2022$800K—Private party → STONEBLUE EQUITIES INC$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ST DESIGN & CONSULTING INC.303/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H DRUMMOND EXP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRO BUILDERS R CONSTRUCTIGeneral Contractor303/21/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LIGHTHOUSE5538203/02/2023
Building Lifecycle
All (40)Filed (3)Permit Issued (2)Signed Off (2)Violation (17)Inspection (4)Special Inspection (12)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
03/28/2023
Signed off — Alteration
B00780022-S1
03/24/2023
Signed off — Alteration
B00780022-I1
03/17/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
03/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMIR ABDALLA
03/15/2023
Special inspection requirement — Concrete - Cast-In-Place
SAMIR ABDALLA
03/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAMIR ABDALLA
03/15/2023
Special inspection requirement — Lighting in dwelling units
SAMIR ABDALLA
03/15/2023
Special inspection requirement — Air barrier - visual inspection
SAMIR ABDALLA
03/08/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/02/2023
Filed — Alteration
B00780022-P1
03/01/2023
Special inspection requirement — Concrete - Cast-In-Place
SAMIR ABDALLA
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
03/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMIR ABDALLA
03/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAMIR ABDALLA
03/01/2023
Special inspection requirement — Air barrier - visual inspection
SAMIR ABDALLA
03/01/2023
Special inspection requirement — Lighting in dwelling units
SAMIR ABDALLA
11/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2022
Violation issued (ECB, closed)
Construction
09/27/2022
Permit issued — Plumbing
B00780022-S1-PL
09/27/2022
Permit issued — General Construction
B00780022-I1-GC
09/11/2022
Filed — Alteration
B00780022-S1
08/08/2022
Filed — Alteration
B00780022-I1
07/22/2022
Violation issued (ECB, closed)
Construction
05/19/2022
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
10/12/2021
Violation issued (ECB, closed)
Construction
11/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2020
Violation issued (HPD, closed)
I
10/27/2020
Violation issued (HPD, open)
C
10/27/2020
Violation issued (HPD, open)
C
10/27/2020
Violation issued (HPD, open)
C
10/27/2020
Violation issued (HPD, open)
C
08/14/2020
Violation issued (ECB, closed)
Construction
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2017
Violation issued (ECB, closed)
Construction
07/20/2017
Violation issued (HPD, open)
B
07/20/2017
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN09/27/2022
DOB NOWGeneral ConstructionSigned-offPRO BUILDERS R CONSTRUCTI09/27/2022
1 project · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/15/2023Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
03/15/2023Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
03/15/2023Concrete - Cast-In-PlaceSAMIR ABDALLAspecial
03/15/2023HVAC-R and service water heating equipmentSAMIR ABDALLAenergy_progress
03/15/2023Lighting in dwelling unitsSAMIR ABDALLAenergy_progress
03/15/2023Air barrier - visual inspectionSAMIR ABDALLAenergy_progress
03/01/2023Concrete - Cast-In-PlaceSAMIR ABDALLAspecial
03/01/2023Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
03/01/2023Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
03/01/2023HVAC-R and service water heating equipmentSAMIR ABDALLAenergy_progress
03/01/2023Air barrier - visual inspectionSAMIR ABDALLAenergy_progress
03/01/2023Lighting in dwelling unitsSAMIR ABDALLAenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00780022-P1Request digital key ↗
08/28/2026B00780022-S1Request digital key ↗
08/28/2026B00780022-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026B00780022-P1Open ↗
08/27/2026B00780022-P1Open ↗
08/27/2026B00780022-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B00780022-P1Open ↗
08/27/2026B00780022-P1Open ↗
08/27/2026B00780022-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00780022-P1Open ↗
08/28/2026B00780022-S1Open ↗
08/28/2026B00780022-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B00780022-P1Open ↗
08/28/2026B00780022-S1Open ↗
08/28/2026B00780022-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00780022-I1Open ↗