69-01 35TH AVENUE
QUEENS · Jackson Heights · BIN 4028794
💬 Discuss this project
1963Year Built
6Stories
D4Building Class
R7AZoning
59,756 sfGross Floor Area
75Units
LL97 CoveredRent Stabilized0 Active Violations 3 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: Nash Properties · 14,356 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
StructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew Cingular Wireless Pcs, LLC1p · 3 filings · 20 docs
Floor 14p · 1 filing · 3 docs
Site & exteriorInstallation of pipe scaffoldingUnder Construction5p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Olmstead Owners1303/21/2026
NYC Department of Housing Preservation and Development203/21/2026
Nash Properties103/22/2026
Acapulco Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ikra Consulting110/03/2026
Tectonic Engineering & Surveying Co109/28/2026
Arcnet Architects108/08/2019
Haider Engineering, P.E103/18/2019
Tectonic Engineering101/29/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group203/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BrenmacScaffold707/08/2026
Metro RF ServicesGeneral Contractor403/21/2026
Akala ConstructionScaffold110/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106109/28/2026
Papay Engineering & Construction4506108/08/2019
Building Lifecycle
All (110)Filed (5)Permit Issued (6)Signed Off (2)Facade (FISP) (15)Violation (54)Objection (17)Special Inspection (11)
10/16/2026
Objection raised — Other
10/05/2026
Permit issued — Supported Scaffold
Q01468232-I1-SF
10/03/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01468232-I1
09/28/2026
Filed — Alteration
AT&T - Removal of existing PTAC and installation of new split system HVAC with wall mount on shelter on roof. Repair of shelter wall and decommission of PTAC in place. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q01206173-I1
09/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Manojkumar Patel
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Manojkumar Patel
09/09/2026
Special inspection requirement — Maintenance information
Manojkumar Patel
09/09/2026
Special inspection requirement — Insulation placement and R values
Manojkumar Patel
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Manojkumar Patel
09/09/2026
Special inspection requirement — Post-installed Anchors
Manojkumar Patel
09/09/2026
Special inspection requirement — Air barrier - visual inspection
Manojkumar Patel
09/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Manojkumar Patel
04/04/2025
Special inspection requirement — Mechanical Systems
Manojkumar Patel
04/04/2025
Special inspection requirement — Final
Manojkumar Patel
04/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Manojkumar Patel
01/03/2023
Cycle 9 facade report signed — SAFE
11/21/2022
Cycle 9 facade report submitted
11/14/2022
Cycle 9 facade inspection completed
09/19/2022
Violation issued (ECB, closed)
Construction
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/14/2021
Violation issued (HPD, closed)
A
08/21/2020
Cycle 8 facade report signed — SAFE
06/02/2020
Violation issued (ECB, closed)
Construction
05/14/2020
Cycle 8 facade report submitted
04/24/2020
Permit issued — Sidewalk Shed
Q00137918-I1-SH
03/20/2020
Cycle 8 facade inspection completed
03/13/2020
Permit issued — Sidewalk Shed
Q00137918-I1-SH
02/04/2020
Signed off — Alteration
AT&T - Replacement of existing antennas with installation of RRH units on roof. Retrofit of existing cabinet in existing equipment shelter on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00196464-I1
11/01/2019
Violation issued (HPD, closed)
I
10/11/2019
Permit issued — Antenna
Q00196464-I1-AN
08/09/2019
Objection raised — 1998-AN BC 501.3-Building Code
08/09/2019
Objection resolved — Addressed
08/09/2019
Objection raised — 2014-AN AC 28-104.11-Building
08/09/2019
Objection resolved — Addressed
08/09/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
08/09/2019
Objection resolved — Addressed
08/09/2019
Objection raised — 1998-AN AC 28-103.14.1-Adminis
08/09/2019
Objection resolved — Addressed
08/08/2019
Filed — Alteration
AT&T - Replacement of existing antennas with installation of RRH units on roof. Retrofit of existing cabinet in existing equipment shelter on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00196464-I1
07/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2019
Permit issued — Sidewalk Shed
Q00137918-I1-SH
03/18/2019
Filed — Alteration
Q00137918-I1
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2019
Violation issued (ECB, closed)
Construction
02/22/2019
Violation issued (ECB, closed)
Construction
02/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/18/2019
Cycle 8 facade inspection completed
02/10/2019
Cycle 8 facade report signed — UNSAFE
01/09/2019
Signed off — Alteration
Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Retrofit of cabinets in the existing equipment shelter on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00004511-I1
12/01/2018
Violation issued (ECB, closed)
Construction
10/22/2018
Violation issued (HPD, closed)
I
09/28/2018
Cycle 8 facade report submitted
08/20/2018
Violation issued (ECB, closed)
Local Law
06/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/22/2018
Permit issued — Antenna
Q00004511-I1-AN
04/20/2018
Objection resolved — Addressed
04/20/2018
Objection resolved — Addressed
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedAkala Construction10/05/2026
DOB NOWSidewalk ShedPermit IssuedBrenmac04/24/2020
DOB NOWSidewalk ShedPermit IssuedBrenmac03/13/2020
DOB NOWAntennaSigned-offMetro RF Services10/11/2019
DOB NOWSidewalk ShedPermit IssuedBrenmac03/22/2019
DOB NOWAntennaSigned-offMetro RF Services05/22/2018
BISOTISSUEDContinental Restoration07/02/2019
BISMHISSUEDWireless Network Group12/18/2018
BISOTISSUEDMetro RF Services06/23/2016
BISFSISSUEDEast Coast Mechanical01/16/2009
BISEQISSUEDEmpire Scaffolding System12/16/2005
BISEQISSUEDEmpire Scaffolding System01/13/2005
BISOTISSUEDRow Associates04/08/2002
BISPLISSUEDA & C Heating Services12/27/2000
BISFSISSUEDA&C Combustion Services12/27/2000
BISMHISSUEDApplied Electric10/04/2000
1 project · most recent 09/28/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/28/2026——Air Conditioning Systems
Cooling
Lg KNSAP361A 36,000 BTU · Ahu ×1
KUSAP361A 36,000 BTU · Condensing Unit ×1
3 projects · most recent 03/27/2023
FiledStatusContractorScope
03/27/2023Permit IssuedStar Electrical Contractors—
05/23/2019Permit IssuedRJ Electrical Contractors—
03/08/2019CancelledBorowide Elect'l Contractors—
1 project · most recent 10/03/2026
Scaffold
FiledStatusContractorScope
10/03/2026Permit IssuedAkala ConstructionScaffold
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/09/2026HVAC-R and service water heating system controlsManojkumar Patelenergy_progress
09/09/2026HVAC-R and service water piping design and insulationManojkumar Patelenergy_progress
09/09/2026Maintenance informationManojkumar Patelenergy_progress
09/09/2026Insulation placement and R valuesManojkumar Patelenergy_progress
09/09/2026Fire-Resistant Penetrations and JointsManojkumar Patelspecial
09/09/2026Post-installed AnchorsManojkumar Patelspecial
09/09/2026Air barrier - visual inspectionManojkumar Patelenergy_progress
09/09/2026HVAC-R and service water heating equipmentManojkumar Patelenergy_progress
04/04/2025Mechanical SystemsManojkumar Patelspecial
04/04/2025FinalManojkumar Patelprogress
04/04/2025Tenant Protection Plan ComplianceManojkumar Patelspecial
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
10/04/2026Q01206173-I1Request digital key ↗
08/15/2026Q00004511-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00137918-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026Q00196464-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
08/22/2019421740539Open ↗
07/25/2019421740539Open ↗
01/02/2019421700083Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
05/14/2019421740539Open ↗
03/19/2019421740539Open ↗
11/26/2018421700083Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/31/2020421740539Open ↗
01/31/2020421740539Open ↗
06/19/2019421740539Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
10/04/2026Q01206173-I1Open ↗
10/04/2026Q01206173-I1Open ↗
10/04/2026Q01206173-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
10/07/2026Q01468232-I1Open ↗
10/04/2026Q01206173-I1Open ↗
08/29/2026Q00004511-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/04/2026Q01206173-I1Open ↗
10/04/2026Q01206173-I1Open ↗
10/04/2026Q01206173-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/10/2008410163380Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/10/2008410163380Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
03/19/2019421740539Open ↗
12/18/2018421700083Open ↗
03/22/2016421303093Open ↗
▸DOB NOWTenant Protection Plan1
08/14/2026Q00196464-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/19/2019421740539Open ↗
11/26/2018421700083Open ↗
03/22/2016421303093Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/04/2026Q01206173-I1Open ↗
08/15/2026Q00004511-I1Open ↗
08/14/2026Q00196464-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/10/2008410163380Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
01/31/2020421740539Open ↗
03/19/2019421740539Open ↗
03/07/2019421700083Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/31/2020421740539Open ↗
03/07/2019421700083Open ↗
11/17/2017421303093Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/21/2020421740539Open ↗
03/07/2019421700083Open ↗
11/17/2017421303093Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/22/2016421303093Open ↗
09/10/2008410163380Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/15/2016421303093Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/31/2020421740539Open ↗
03/19/2019421740539Open ↗
03/07/2019421700083Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
03/19/2019421740539Open ↗
11/26/2018421700083Open ↗
03/22/2016421303093Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
01/21/2020421740539Open ↗
11/17/2017421303093Open ↗
▸BISADDITIONAL INFORMATION1
05/14/2019421740539Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00137918-I1Open ↗