← Back
Stadium, race track, baseball field
69-02 BURNS STREET
QUEENS · BIN 4437648
💬 Discuss this project
1915Year Built
2Stories
Q6Building Class
R3-2Zoning
56,388 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Stadium, race track, baseball field · 509,215 sf lot · 0.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 16 docs
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIEBREAKER PRODUCTIONS LLC.409/15/2026
MADISON HOUSE PRESENTS2207/08/2026
OWNER OF 69-50 BURNS ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1203/21/2026
ROBERT PAPAZIAN ARCHITECT PC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARENA EVENT SERVICES INCGeneral Contractor807/08/2026
TIMOCON INTERIOR CONSTRUCGeneral Contractor504/09/2026
RICHARDS PLUM & HTG CO,INGeneral Contractor303/21/2026
T & J ELECT'L CONTR INCElectrical303/22/2026
DYNAMIC CONSTRUCTION SERVGeneral Contractor303/21/2026
WINICK PRODUCTIONS, LLCGeneral Contractor309/07/2026
RRP PLUMBING CORPPlumbing207/08/2026
RICHARDS P AND H CO, INCPlumbing207/08/2026
NYFF EVENTS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913211/06/2024
RYAN SPECIAL ENGINEERING2018107/09/2024
STRUCT. ENGINEERING INTEG4174409/07/2023
ROBERT PAPAZIAN ARCHITECT3491204/14/2023
URBAN ENGINEERING, PC2575206/15/2021
Building Lifecycle
All (156)Filed (46)Permit Issued (20)Signed Off (9)Violation (14)Inspection (9)Objection (28)Special Inspection (30)
09/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2026
Permit issued — General Construction
Q01454043-I1-GC
09/01/2026
Filed — Alteration
Temporary structures for the Forest Hills Stadium programming. No changes to existing structures, use or egress.
Q01454043-I1
09/01/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
08/10/2026
Filed — No Work
Q01443210-I1
06/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2026
Signed off — Alteration
Temporary Installations to be used on a temporary event "TOMA Nike Forest Hills". All Installations are to be removed upon completion of the event.
Q01405485-I1
06/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
05/30/2026
Objection raised — Other
05/30/2026
Objection raised — Other
05/27/2026
Permit issued — General Construction
Q00548983-I1-GC
05/26/2026
Filed — No Work
Q01407429-I1
05/26/2026
Permit issued — General Construction
Q01405485-I1-GC
05/21/2026
Filed — Alteration
Temporary Installations to be used on a temporary event "TOMA Nike Forest Hills". All Installations are to be removed upon completion of the event.
Q01405485-I1
05/21/2026
Special inspection requirement — Final
Christopher Carrano
12/09/2025
Signed off — Alteration
Sound attenuation partitions for Forest Hills Stadium. No changes to use or egress.
Q01037622-I1
10/24/2025
Special inspection requirement — Final
ANDY ENGLER ROTH
10/23/2025
Filed — Alteration
Temporary structures for Forest Hills Stadium Programming as per plans filed herewith. No changes to existing structures, use or egress.
Q00548983-P5
10/20/2025
Filed — No Work
Q01305210-I1
08/18/2025
Permit issued — General Construction
Q00548983-I1-GC
08/12/2025
Filed — No Work
Q01269768-I1
07/11/2025
Signed off — Alteration
Installation of new 19KW Generac generator OSP as per plans filed herewith.
Q01097725-I1
06/25/2025
Signed off — Alteration
Installation of new 19KW Generac generator OSP as per plans filed herewith.
Q01097725-S1
05/30/2025
Objection resolved — Addressed
05/29/2025
Permit issued — General Construction
Q00548983-I1-GC
05/29/2025
Objection raised — Other
05/28/2025
Filed — No Work
Q01213622-P1
04/21/2025
Filed — No Work
Q01213622-I1
04/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2025
Violation issued (FDNY_NOV, closed)
01/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/24/2024
Permit issued — Mechanical Systems
Q01097725-S1-MS
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
12/20/2024
Special inspection requirement — Maintenance information
Ronald Merhige
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
12/13/2024
Filed — Alteration
Installation of new 19KW Generac generator OSP as per plans filed herewith.
Q01097725-P1
12/12/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
12/06/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
12/06/2024
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
11/21/2024
Permit issued — Plumbing
Q01097725-I1-PL
11/06/2024
Filed — Alteration
Installation of new 19KW Generac generator OSP as per plans filed herewith.
Q01097725-I1
11/06/2024
Filed — Alteration
Installation of new 19KW Generac generator OSP as per plans filed herewith.
Q01097725-S1
11/04/2024
Special inspection requirement — Maintenance information
Ronald Merhige
10/31/2024
Permit issued — Plumbing
Q01086271-I1-PL
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
10/31/2024
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Ronald Merhige
10/21/2024
Special inspection requirement — Mechanical Systems
Ronald Merhige
10/21/2024
Special inspection requirement — Final
Ronald Merhige
10/09/2024
Filed — No Work
Q01124095-I1
09/27/2024
Filed — Alteration
Temporary structures for Forest Hills Stadium Programming as per plans filed herewith. No changes to existing structures, use or egress.
Q00548983-P4
09/27/2024
Special inspection requirement — Final
ANDY ENGLER ROTH
09/26/2024
Signed off — Alteration
Installation of open, exterior wood frame deck for accessory recreational occupancy.
Q00851331-I1
09/26/2024
Filed — No Work
Q01117371-I1
08/20/2024
Objection resolved — Addressed
08/19/2024
Filed — No Work
Q01097940-I1
08/19/2024
Objection raised — Other
08/15/2024
Permit issued — General Construction
Q01037622-I1-GC
08/14/2024
Permit issued — General Construction
Q00548983-I1-GC
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC09/03/2026
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC05/27/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC05/26/2026
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC08/18/2025
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC05/29/2025
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN12/24/2024
DOB NOWPlumbingSigned-offRICHARDS P AND H CO, INC11/21/2024
DOB NOWPlumbingSigned-offRICHARDS P AND H CO, INC10/31/2024
DOB NOWGeneral ConstructionSigned-offTIMOCON INTERIOR CONSTRUC08/15/2024
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC08/14/2024
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC05/02/2024
DOB NOWFoundationSigned-offTIMOCON INTERIOR CONSTRUC01/26/2024
DOB NOWFoundationSigned-offTIMOCON INTERIOR CONSTRUC12/06/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/02/2023
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC08/05/2022
DOB NOWPlumbingSigned-offRRP PLUMBING CORP02/14/2022
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC08/09/2021
DOB NOWGeneral ConstructionPermit IssuedARENA EVENT SERVICES INC07/21/2021
DOB NOWStructuralSigned-offDYNAMIC CONSTRUCTION SERV06/03/2021
DOB NOWPlumbingSigned-offRRP PLUMBING CORP03/26/2021
BISOTISSUEDDYNAMIC CONSTRUCTION SERV03/15/2021
BISOTISSUEDARENA EVENT SERVICES INC09/26/2019
BISOTISSUEDARENA EVENT SERVICES INC05/03/2019
BISOTISSUEDTIMOCON INTERIOR CONSTRUC02/11/2019
BISOTISSUEDARENA EVENT SERVICES INC10/03/2018
BISOTISSUEDARENA EVENT SERVICES INC05/25/2018
BISPLISSUEDINFINITI ESC PLUMBING COR04/25/2018
BISPLISSUEDINFINITI ESC PLUMBING COR04/19/2018
BISOTISSUEDTIMOCON INTERIOR CONSTRUC03/20/2018
BISOTISSUEDTIMOCON INTERIOR CONSTRUC03/19/2018
BISOTISSUEDTIMOCON INTERIOR CONSTRUC03/14/2018
BISOTISSUEDARENA EVENT SERVICES INC08/22/2017
BISOTISSUEDARENA EVENT SERVICES INC08/18/2017
BISOTISSUEDARENA EVENT SERVICES INC05/10/2017
BISOTISSUEDARENA EVENT SERVICES INC09/29/2016
BISOTISSUEDARENA EVENT SERVICES INC08/10/2016
BISOTISSUEDARENA EVENT SERVICES INC07/26/2016
BISOTISSUEDARENA EVENT SERVICES INC07/19/2016
BISOTISSUEDARENA EVENT SERVICES INC07/19/2016
BISOTISSUEDARENA EVENT SERVICES INC07/19/2016
+ 21 more permits on file
1 project · most recent 08/08/2024
FiledStatusContractorScope
08/08/2024——4 heads
1 project · most recent 08/08/2024
Plumbing-Sprinkler
FiledStatusContractorScope
08/08/2024Signed-offRICHARDS P AND H CO, INCPlumbing-Sprinkler
7 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedSCIENTIFIC ELEC. CO. INCGeneral Wiring
12/04/2025Permit IssuedETRICITY ELECTRICAL CO INGeneral Wiring
07/08/2025CompleteETRICITY ELECTRICAL CO INGeneral Wiring
06/06/2025Permit IssuedT & J ELECT'L CONTR INCGeneral Wiring
04/28/2021CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
05/15/2019Permit IssuedT & J ELECT'L CONTR INC1 meters, 1 new_meters
05/17/2018CompleteT & J ELECT'L CONTR INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/06/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/06/2024Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
12/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
09/01/2026FinalANDY ENGLER ROTHprogress
05/21/2026FinalChristopher Carranoprogress
10/24/2025FinalANDY ENGLER ROTHprogress
12/20/2024Energy Code Compliance InspectionsRonald Merhigeprogress
12/20/2024Maintenance informationRonald Merhigeenergy_progress
12/20/2024HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
11/04/2024Maintenance informationRonald Merhigeenergy_progress
10/31/2024Energy Code Compliance InspectionsRonald Merhigeprogress
10/31/2024Emergency and Standby Power Systems (Generator)Ronald Merhigespecial
10/21/2024Mechanical SystemsRonald Merhigespecial
10/21/2024FinalRonald Merhigeprogress
09/27/2024FinalANDY ENGLER ROTHprogress
07/25/2024Sprinkler SystemsRonald Merhigespecial
07/25/2024Fire-Resistant Penetrations and JointsRonald Merhigespecial
01/25/2024Subgrade InspectionsChris Yiuspecial
01/25/2024FinalRobert Papazianprogress
01/25/2024Structural Cold-Formed SteelRobert Papazianspecial
01/25/2024Footing and FoundationRobert Papazianprogress
01/25/2024Concrete - Cast-In-PlaceRobert Papazianspecial
01/25/2024Structural Steel - DetailsRobert Papazianspecial
11/22/2023Concrete - Cast-In-PlaceRobert Papazianspecial
11/22/2023Subgrade InspectionsChris Yiuspecial
11/22/2023Footing and FoundationRobert Papazianprogress
11/22/2023FinalRobert Papazianprogress
11/22/2023Structural Wood FrameRobert Papazianprogress
Latest 25 of 51.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Tiebreaker Productions LLCFitness / RecreationFloor 1
Project Q01269768 No Work · TA Certificate of Operation Issued · 08/12/2025
Project Q00911946 Alteration · LOC Issued · 08/01/2023
Project Q00555503 No Work · TA Certificate of Operation Issued · 07/12/2021
Forest Hillstennis CenterFitness / Recreation—
Project Q01097725 Alteration · LOC Issued · 11/06/2024
Tie Breaker ProductionsOther—
Project Q00235538 No Work · TA Certificate of Operation Issued · 09/30/2019
Project Q00200155 No Work · TA Certificate of Operation Issued · 07/26/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 584 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch - Temporary Place of Assembly24
08/28/2026Q00200155-I1Request digital key ↗
08/28/2026Q00235538-I1Request digital key ↗
08/27/2026Q00555503-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch16
09/15/2026Q01454043-I1Request digital key ↗
08/27/2026Q00548983-I1Request digital key ↗
08/27/2026Q00548983-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00273432-P1Request digital key ↗
08/28/2026Q00273432-I1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION60
02/12/2024400875567Open ↗
02/05/2024410114246Open ↗
01/31/2024410114246Open ↗
Showing 3 of 60 on file for this type
▸BISWORK PERMIT APPLICATION38
03/15/2021440605070Open ↗
09/27/2019421917126Open ↗
05/15/2019421859563Open ↗
Showing 3 of 38 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications221
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION78
04/27/2020421917126Open ↗
04/27/2020421917126Open ↗
05/10/2019421859563Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/15/2026Q01454043-I1Open ↗
08/28/2026Q00273432-P1Open ↗
08/28/2026Q00273432-I1Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
09/26/2019421917126Open ↗
05/10/2019421859563Open ↗
11/10/2018421695339Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT27
07/02/2020440605070Open ↗
09/26/2019421917126Open ↗
05/10/2019421859563Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/19/2026Q01454043-I1Open ↗
09/01/2026Q00548983-P1Open ↗
09/01/2026Q00911946-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026Q00851331-P1Open ↗
08/28/2026Q01086271-I1Open ↗
08/28/2026Q01086271-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/02/2020440605070Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/02/2020440605070Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/26/2018421606104Open ↗
02/26/2018421606122Open ↗
Showing 2 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
02/26/2018421606113Open ↗
02/26/2018421606097Open ↗
07/02/2020440605070Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
07/02/2020440605070Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026Q00273432-P1Open ↗
08/28/2026Q00273432-I1Open ↗
08/21/2026Q01086271-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/27/2023440605070Open ↗
▸BISLIGHTING CONTROLS1
10/27/2023440605070Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/27/2023440605070Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/02/2020440605070Open ↗
▸BISINTERIOR LIGHTING POWER1
10/27/2023440605070Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/02/2020440605070Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q01097725-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/17/2020421640031Open ↗
11/16/2020421640031Open ↗
10/01/2020421684617Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
03/22/2018421606113Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/26/2018421606113Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/17/2021421695339Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/22/2018421606113Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
03/17/2021421695339Open ↗
11/16/2020421640031Open ↗
06/11/2020410114246Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/06/2024400875567Open ↗
03/17/2021421695339Open ↗
06/11/2020410114246Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT57
07/02/2020440605070Open ↗
05/11/2020421917126Open ↗
09/26/2019421917126Open ↗
Showing 3 of 57 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/17/2021421695339Open ↗
10/01/2020421684617Open ↗
▸Filing & Intake Forms53
▸BISEFILING COVER SHEET34
09/25/2019421917126Open ↗
05/10/2019421859563Open ↗
11/10/2018421695339Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION17
02/13/2024400875567Open ↗
02/13/2024400875567Open ↗
02/06/2024400875567Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/02/2020440605070Open ↗
▸BISBOROUGH INTAKE FORM1
04/27/2020421917126Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type