ECB01/30/20194B,6A,48A,50A. B254-50A-FLUE PIPES NOT SEALED TO CHIMNEY BASE CORRECTALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION.$3K due
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
ECB05/10/20174A,16,19B,24B,32A,34A,38,48A-B,50. 50A-WRONG SUPPORT MATERIAL ON WATERPIPES B-NO SUPPORT ON FLUE PIPE; C-NO CLEAN OUT ON CHIMNEY BASE; D-NODISCHARGE PIPE ON WATER HEATER; CHECK VALVE MISSING FROM BOILER FILLNothing owed — awaiting certificate of correction
ECB10/24/2008FAILURE TO MAINTAIN. NOTED: 2 STORY BLDG, 1ST FLOOR LIQUOR STORE CEILING DAMAGED DUE TO WATER LEAK FROM ABOVE. CEILING DAMAGED APPROX 10' X 8'. REMEDY: REPAIR CEILING.Nothing owed — awaiting certificate of correction