← Back
Predominantly retail with other uses
69-07 GRAND AVENUE
QUEENS · Maspeth · BIN 4058511
💬 Discuss this project
1940Year Built
3Stories
K4Building Class
R6BZoning
3,770 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 6907 GRAND LLC · 1,330 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 1
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STONEBRIDGE CONTRACTING707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2023$1.7M—PIETRO CARUANA, INC. → 6907 GRAND LLC$451/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MORALI ARCHITECTURE1011/21/2024
ENGINEERING GROUP ASSOCIATES, PC107/25/2024
ASR ENGINEERING PC207/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANTHONY MORALI ARCHITECT PLLC803/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NUFORM CONSTRUCTION INCGeneral Contractor507/08/2026
STONEBRIDGE CONTRACTING CGeneral Contractor207/08/2026
DH EAGLE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANTHONY MORALI ARCHITECT48101111/21/2024
ENGINEERING GROUP ASSOCIA526207/25/2024
MACIA INSPECTION & TESTIN402107/25/2024
SYED ENGINEERING, P.C.7054107/17/2024
Building Lifecycle
All (91)Filed (13)Permit Issued (6)Signed Off (6)Violation (20)Inspection (4)Objection (14)Special Inspection (28)
02/27/2025
Signed off — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-I1
02/11/2025
Signed off — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-S2
02/11/2025
Signed off — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-S1
01/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
ANTHONY MORALI
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MORALI
11/21/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P5
11/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY MORALI
11/21/2024
Special inspection requirement — Final
ANTHONY MORALI
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY MORALI
11/21/2024
Special inspection requirement — Mechanical Systems
ANTHONY MORALI
11/21/2024
Special inspection requirement — Maintenance information
ANTHONY MORALI
11/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY MORALI
11/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
ANTHONY MORALI
11/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY MORALI
11/20/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P6
11/20/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P7
11/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2024
Signed off — Alteration
PROPOSED OF GRINDING AND POINTING TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01080025-I1
10/14/2024
Signed off — Alteration
Q01079972-I1
10/09/2024
Signed off — Alteration
Filing structural plans and details herewith for the repair/reinforcement of the existing brick/masonry parapet at Roof. No change to use, egress or occupancy under this structural application.
Q01080836-I1
08/28/2024
Permit issued — Structural
Q01080836-I1-ST
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Structural
08/01/2024
Objection raised — Admin
08/01/2024
Objection raised — Admin
08/01/2024
Objection raised — Admin
08/01/2024
Objection raised — Admin
08/01/2024
Objection raised — Structural
07/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2024
Filed — Alteration
Filing structural plans and details herewith for the repair/reinforcement of the existing brick/masonry parapet at Roof. No change to use, egress or occupancy under this structural application.
Q01080836-I1
07/22/2024
Permit issued — General Construction
Q01080025-I1-GC
07/22/2024
Special inspection requirement — Structural Steel - Details
JUNHUI JIA
07/22/2024
Special inspection requirement — Structural Steel - Welding
CHUNG CHING JEN
07/22/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JUNHUI JIA
07/17/2024
Filed — Alteration
PROPOSED OF GRINDING AND POINTING TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01080025-I1
07/16/2024
Filed — Alteration
Q01079972-I1
07/16/2024
Permit issued — Sidewalk Shed
Q01079972-I1-SH
07/15/2024
Special inspection requirement — Final
CHUNG CHING JEN
07/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
ANTHONY MORALI
07/15/2024
Special inspection requirement — Masonry
JUNHUI JIA
07/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUNHUI JIA
07/12/2024
Special inspection requirement — Masonry
RAFI HAMID
07/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
RAFI HAMID
07/12/2024
Special inspection requirement — Final
RAFI HAMID
07/11/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P4
06/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2024
Permit issued — Plumbing
Q00945798-S1-PL
05/08/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P1
05/08/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P2
05/08/2024
Filed — Alteration
Install new HVAC split system in existing dwelling units (4) at 2nd and 3rd floor. Condensing unit at roof. No change to use, egress or occupancy.
Q00945798-P3
05/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/07/2024
Special inspection requirement — Mechanical Systems
ANTHONY MORALI
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNUFORM CONSTRUCTION INC08/28/2024
DOB NOWGeneral ConstructionSigned-offSTONEBRIDGE CONTRACTING C07/22/2024
DOB NOWSidewalk ShedSigned-offSTONEBRIDGE CONTRACTING C07/16/2024
DOB NOWPlumbingSigned-offL.SPINA PLUMB & HTG INC05/09/2024
DOB NOWMechanical SystemsSigned-offNUFORM CONSTRUCTION INC02/06/2024
DOB NOWGeneral ConstructionSigned-offNUFORM CONSTRUCTION INC11/08/2023
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO INC09/28/2004
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO I08/18/1992
1 project · most recent 05/18/2024
General Wiring
FiledStatusContractorScope
05/18/2024CompleteR.J. ELEC AND MAINTENANCEGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
11/25/2024Tenant Protection Plan ComplianceANTHONY MORALIspecial
11/25/2024Fire-Resistant Penetrations and JointsANTHONY MORALIspecial
11/21/2024HVAC-R and service water heating system controlsANTHONY MORALIenergy_progress
11/21/2024FinalANTHONY MORALIprogress
11/21/2024Energy Code Compliance InspectionsANTHONY MORALIprogress
11/21/2024Mechanical SystemsANTHONY MORALIspecial
11/21/2024Maintenance informationANTHONY MORALIenergy_progress
11/21/2024HVAC-R and service water piping design and insulationANTHONY MORALIenergy_progress
11/21/2024Tenant Protection Plan ComplianceANTHONY MORALIspecial
11/21/2024HVAC-R and service water heating equipmentANTHONY MORALIenergy_progress
07/22/2024Structural Steel - DetailsJUNHUI JIAspecial
07/22/2024Structural Steel - WeldingCHUNG CHING JENspecial
07/22/2024Structural Steel - High Strength BoltingJUNHUI JIAspecial
07/15/2024FinalCHUNG CHING JENprogress
07/15/2024Tenant Protection Plan ComplianceANTHONY MORALIspecial
07/15/2024MasonryJUNHUI JIAspecial
07/15/2024Structural Stability – Alterations of existing buildingsJUNHUI JIAspecial
07/12/2024MasonryRAFI HAMIDspecial
07/12/2024Tenant Protection Plan ComplianceRAFI HAMIDspecial
07/12/2024FinalRAFI HAMIDprogress
05/07/2024Tenant Protection Plan Compliance—special
05/07/2024Mechanical SystemsANTHONY MORALIspecial
05/07/2024Maintenance informationANTHONY MORALIenergy_progress
05/07/2024HVAC-R and service water heating system controlsANTHONY MORALIenergy_progress
05/07/2024HVAC-R and service water heating equipmentANTHONY MORALIenergy_progress
Latest 25 of 28.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/22/2026Q00945798-P3Request digital key ↗
08/22/2026Q00945798-P2Request digital key ↗
08/22/2026Q00945798-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/22/2026Q00945798-P3Open ↗
08/22/2026Q00945798-P2Open ↗
08/22/2026Q00945798-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/26/2026Q01080836-I1Open ↗
09/26/2026Q01080836-I1Open ↗
09/26/2026Q01080836-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026Q01080836-I1Open ↗
08/28/2026Q00945798-S2Open ↗
08/28/2026Q00945798-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/22/2026Q00945798-P2Open ↗
08/22/2026Q00945798-P1Open ↗
08/22/2026Q00945798-S2Open ↗
Showing 3 of 11 on file for this type