2 Open Violations 1 unresolved · 1 paperwork only▸
DOB05/11/1999VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB05/11/1999WORK W/O PERMITS. WORK NOTED; AT 2ND STORY FRONT, BEARING WALL ALONG W/ HEADER BEAM REMOVED CAUSING THE 3RD FL ABOVE TO PARTIALLY COLLAPSE & SAG APPROX 3-5". REMEDY: STOP ALL WORK EXCEPT TO MAKE SITE SAFE,Nothing owed — awaiting certificate of correction
Three families · 2,880 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.