← Back
Two family frame
69-09 BURCHELL AVENUE
QUEENS · BIN 4624749
💬 Discuss this project
2024Year Built
—Stories
B2Building Class
R4AZoning
2,464 sfGross Floor Area
2Units
Two family frame · 3,400 sf lot · 0.72 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 10 docs
Floor 35p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 17p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS2207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2024$983K—— → —$399/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.709/24/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor903/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177509/24/2024
IP CONCRETE TESTING AND I6252206/27/2024
Building Lifecycle
All (59)Filed (7)Permit Issued (4)Signed Off (3)Inspection (9)Objection (6)Special Inspection (30)
07/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2024
Filed — New Building
Q00904429-P2
09/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Structural Cold-Formed Steel
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Structural Steel - Details
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
09/23/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Final
JAN PEREZ
09/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Lowest Floor Elevation
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
09/23/2024
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
08/26/2024
Signed off — Alteration
Installation of Plumbing fixtures and related piping in conjunction with New Building JOB # Q00904429
Q00904556-I1
08/21/2024
Signed off — Alteration
Q00904382-I1
08/20/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION # Q00904429
Q00904395-I1
08/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/30/2024
Filed — New Building
Q00904429-P1
06/27/2024
Filed — Alteration
Installation of Plumbing fixtures and related piping in conjunction with New Building JOB # Q00904429
Q00904556-P1
06/12/2024
Permit issued — Curb Cut
Q00904382-I1-CC
03/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2024
Permit issued — Plumbing
Q00904556-I1-PL
01/26/2024
Permit issued — Structural
Q00904429-I1-GC-CX
01/25/2024
Permit issued — Construction Fence
Q00904395-I1-FN
11/08/2023
Objection resolved — Addressed
09/07/2023
Objection resolved — Addressed
09/07/2023
Objection resolved — Addressed
09/03/2023
Objection raised — Inspections
09/03/2023
Objection raised — Inspections
09/03/2023
Objection raised — Inspections
08/29/2023
Filed — Alteration
Installation of Plumbing fixtures and related piping in conjunction with New Building JOB # Q00904429
Q00904556-I1
08/26/2023
Filed — Alteration
Q00904382-I1
08/26/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION # Q00904429
Q00904395-I1
08/08/2023
Filed — New Building
Q00904429-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC06/12/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/22/2024
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC01/26/2024
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC01/25/2024
1 project · most recent 07/21/2024
General Wiring
FiledStatusContractorScope
07/21/2024CompleteSKY ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
09/23/2024Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
09/23/2024Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
09/23/2024Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
09/23/2024Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
09/23/2024Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
09/23/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
09/23/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)PIROOZ SOLTANIZADEHspecial
09/23/2024Heating SystemsPIROOZ SOLTANIZADEHspecial
09/23/2024MasonryPIROOZ SOLTANIZADEHspecial
09/23/2024Mechanical SystemsPIROOZ SOLTANIZADEHspecial
09/23/2024Structural Cold-Formed SteelPIROOZ SOLTANIZADEHspecial
09/23/2024Structural Steel - DetailsPIROOZ SOLTANIZADEHspecial
09/23/2024Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
09/23/2024Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
09/23/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
09/23/2024FinalJAN PEREZprogress
09/23/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
09/23/2024Footing and FoundationPIROOZ SOLTANIZADEHprogress
09/23/2024Lowest Floor ElevationPIROOZ SOLTANIZADEHprogress
09/23/2024PreliminaryPIROOZ SOLTANIZADEHprogress
09/23/2024Structural Wood FramePIROOZ SOLTANIZADEHprogress
09/23/2024Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
09/23/2024Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
09/23/2024Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
09/23/2024HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 76.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00904382-I1Request digital key ↗
08/24/2026Q00904395-I1Request digital key ↗
08/24/2026Q00904556-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00904429-P1Open ↗
08/13/2026Q00904429-I1Open ↗
08/13/2026Q00904429-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00904429-P1Open ↗
08/13/2026Q00904429-I1Open ↗
08/13/2026Q00904429-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00904429-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00904429-P2Open ↗
09/01/2026Q00904429-P2Open ↗
09/01/2026Q00904429-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00904429-P2Open ↗
09/01/2026Q00904429-P2Open ↗
09/01/2026Q00904429-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00904382-I1Open ↗
08/24/2026Q00904556-I1Open ↗
08/21/2026Q00904429-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00904429-P2Open ↗
08/13/2026Q00904429-I1Open ↗
08/13/2026Q00904429-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/21/2026Q00904429-P2Open ↗
08/21/2026Q00904429-P1Open ↗
08/21/2026Q00904429-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00904429-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00904429-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00904429-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00904429-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00904429-I1Open ↗
08/13/2026Q00904429-P1Open ↗
08/13/2026Q00904429-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00904429-I1Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/13/2026Q00904429-I1Open ↗
08/13/2026Q00904429-P1Open ↗
08/13/2026Q00904429-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00904429-P2Open ↗
08/13/2026Q00904429-P1Open ↗
08/13/2026Q00904429-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00904429-P2Open ↗
08/21/2026Q00904429-P1Open ↗
08/21/2026Q00904429-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00904429-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00904429-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00904429-I1Open ↗