← Back
Two stories - detached, small or mid-size
69-19 68 STREET
QUEENS · BIN 4088843
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4-1Zoning
1,324 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 1,924 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 1 filing · 9 docs
Floor 16p · 1 filing · 9 docs
Cellar10p · 3 filings · 19 docs
2 jobs · most recent 01/31/2023
General Wiring
FiledStatusContractorScope
01/31/2023CompletePETER J. CATANZARO, INC.1 meters
09/07/2022CompletePETER J. CATANZARO, INC.General Wiring
Building Lifecycle
All (30)Filed (4)Permit Issued (3)Signed Off (2)Inspection (5)Objection (10)Special Inspection (6)
06/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/30/2023
Filed — Alteration CO
Np physical work to be done under this application. Change in use of an existing 2 family to a 1 family dwelling. Also correcting the height of building from the incorrect 20 ft from old CO to proper height of - no physical work was done for this change
Q00513315-P1
04/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/23/2022
Signed off — Alteration
Cap & Remove (1) Shower at first floor and Cap & Remove (1) Sink at second floor.
Q00472155-I1
09/23/2022
Signed off — Alteration
Q00472181-I1
09/01/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/24/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/18/2022
Permit issued — Plumbing
Q00472155-I1-PL
07/08/2022
Permit issued — General Construction
Q00513315-I1-GC
07/06/2022
Permit issued — General Construction
Q00472181-I1-GC
09/28/2021
Objection resolved — Addressed
09/28/2021
Objection resolved — Addressed
09/28/2021
Objection resolved — Addressed
09/23/2021
Objection resolved — Addressed
09/15/2021
Objection resolved — Addressed
07/07/2021
Objection raised — Zoning
07/07/2021
Objection raised — Other
07/07/2021
Objection raised — Other
07/07/2021
Objection raised — Zoning
07/07/2021
Objection raised — Scope
06/17/2021
Filed — Alteration CO
Np physical work to be done under this application. Change in use of an existing 2 family to a 1 family dwelling. Also correcting the height of building from the incorrect 20 ft from old CO to proper height of - no physical work was done for this change
Q00513315-I1
02/25/2021
Filed — Alteration
Cap & Remove (1) Shower at first floor and Cap & Remove (1) Sink at second floor.
Q00472155-I1
02/25/2021
Filed — Alteration
Q00472181-I1
02/18/2021
Special inspection requirement — Energy Code Compliance
Ryan Hansen
02/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
02/18/2021
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
02/18/2021
Special inspection requirement — Interior lighting power
Ryan Hansen
02/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
02/17/2021
Special inspection requirement — Final
Ryan Hansen
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/24/2025$803K—OK PROPERTIES, LLC → Private party$606/sf building
09/06/2024$635K—Private party → OK PROPERTIES LLC$480/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M JUST ARCHITECTURE PC405/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MACALUSO GENERAL CONT CORGeneral Contractor603/21/2026
BIG APPLE SEWER & DRAIN IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174102/25/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBIG APPLE SEWER & DRAIN I08/18/2022
DOB NOWGeneral ConstructionPermit IssuedMACALUSO GENERAL CONT COR07/08/2022
DOB NOWGeneral ConstructionSigned-offMACALUSO GENERAL CONT COR07/06/2022
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/01/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/18/2021Energy Code ComplianceRyan Hansenprogress
02/18/2021Energy Code Compliance InspectionsRyan Hansenprogress
02/18/2021Fire-Resistance Rated ConstructionRyan Hansenprogress
02/18/2021Interior lighting powerRyan Hansenenergy_progress
02/17/2021Fire-Resistant Penetrations and JointsRyan Hansenspecial
02/17/2021FinalRyan Hansenprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/24/2026Q00513315-P1Request digital key ↗
08/14/2026Q00513315-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00472181-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00472155-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00472155-I1Open ↗
08/27/2026Q00472181-I1Open ↗
08/24/2026Q00513315-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00472181-I1Open ↗
08/28/2026Q00472181-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00472155-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/24/2026Q00513315-P1Open ↗
08/14/2026Q00513315-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00472155-I1Open ↗
08/27/2026Q00472181-I1Open ↗
08/24/2026Q00513315-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00472181-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00513315-I1Open ↗