← Back
Miscellaneous warehouse
69-43 76 STREET
QUEENS · BIN 4092120
💬 Discuss this project
1977Year Built
1Stories
E9Building Class
M1-1Zoning
2,000 sfGross Floor Area
0Units
8 Open Violations ▸
Miscellaneous warehouse · Owner of record: TKA INDUSTRIES, LLC · 2,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KORDUN CONSTRUCTION15407/08/2026
TKA INDUSTRIES, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYMS CONSULTING, LLC2102/10/2026
NEW YORK ENGINEERING ASSOC., P.C.510/09/2023
ROCON CORP.1406/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACE EXPEDITING & CONSULTING SERVICE2003/21/2026
NEW YORK ENGINEERING603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYMS CONSULTING, LLC84422002/10/2026
NEW YORK ENGINEERING ASSO851310/09/2023
ROCON CORP.71231406/28/2023
HRF SERVICES CORP5616103/20/2020
Building Lifecycle
All (218)Filed (40)Permit Issued (39)Signed Off (2)Violation (58)Inspection (23)Objection (26)Special Inspection (30)
03/16/2026
Signed off — Alteration
FILE NEW BOILER AND DUAL FUEL BURNER TO CREATE EMERGENCY MOBILE TRAILER # KCC-044.
Q00937919-I1
03/16/2026
Signed off — Alteration
Q00939184-I1
02/12/2026
Permit issued — Boiler Equipment
Q00995711-I1-BE
02/10/2026
Filed — Alteration
Q00995711-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/27/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/16/2025
Permit issued — Boiler Equipment
Q01185184-I1-BE
06/11/2025
Filed — Alteration
INSTALLATION OF A NEW BOILER AND A NEW BURNER TO CREATE A MOBILE BOILER TRAILER UNIT # 600-13-25. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01185184-I1
06/11/2025
Filed — Alteration
INSTALLATION OF A NEW BOILER AND A NEW BURNER TO CREATE A MOBILE BOILER TRAILER UNIT # 600-12-25. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01185183-I1
06/11/2025
Permit issued — Boiler Equipment
Q01185183-I1-BE
06/05/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/20/2025
Permit issued — Boiler Equipment
Q01070696-I1-BE
05/19/2025
Filed — Alteration
INSTALLATION OF A NEW BOILER AND A NEW BURNER TO CREATE A MOBILE BOILER TRAILER UNIT # 300-03-23. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01070696-I1
04/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/04/2025
Filed — Alteration
INSTALLATION OF A NEW BOILER AND A NEW BURNER TO CREATE A MOBILE BOILER TRAILER UNIT # 600-10-25. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01185181-I1
04/04/2025
Permit issued — Boiler Equipment
Q01185181-I1-BE
03/24/2025
Special inspection requirement — Maintenance information
SULIMAN AHMED
03/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
03/11/2025
Filed — Alteration
INSTALLATION OF A NEW BOILER AND A NEW BURNER TO CREATE A MOBILE BOILER TRAILER UNIT # 600-11-25. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01185182-I1
03/11/2025
Permit issued — Boiler Equipment
Q01185182-I1-BE
03/04/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/26/2025
Special inspection requirement — Maintenance information
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
02/26/2025
Special inspection requirement — Maintenance information
SULIMAN AHMED
02/26/2025
Special inspection requirement — Maintenance information
SULIMAN AHMED
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SULIMAN AHMED
02/24/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SULIMAN AHMED
02/24/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SULIMAN AHMED
02/24/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SULIMAN AHMED
02/19/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/31/2025
Permit issued — Boiler Equipment
Q01172442-I1-BE
01/29/2025
Filed — Alteration
Q01172442-I1
10/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2024
Permit issued — Boiler Equipment
Q01070697-I1-BE
09/12/2024
Permit issued — Boiler Equipment
Q01070699-I1-BE
09/11/2024
Filed — Alteration
Q01070697-I1
09/11/2024
Filed — Alteration
Q01070699-I1
09/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
SULIMAN AHMED
09/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
09/11/2024
Special inspection requirement — Maintenance information
SULIMAN AHMED
09/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
SULIMAN AHMED
09/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SULIMAN AHMED
09/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
06/24/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SULIMAN AHMED
06/22/2024
Special inspection requirement — Maintenance information
SULIMAN AHMED
06/22/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SULIMAN AHMED
06/22/2024
Special inspection requirement — Maintenance information
SULIMAN AHMED
06/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
SULIMAN AHMED
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAMERICAN BOILER & WELDING02/12/2026
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING06/16/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING06/11/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING05/20/2025
DOB NOWBoiler EquipmentSigned-offJACK PICCINI INC04/04/2025
DOB NOWBoiler EquipmentSigned-offJACK PICCINI INC03/11/2025
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC01/31/2025
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC09/12/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC09/12/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/20/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/20/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC08/08/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC08/08/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC07/18/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP06/20/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC03/15/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC02/09/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC01/23/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC01/23/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC08/31/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC08/30/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC08/30/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC03/22/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP08/17/2021
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP08/13/2021
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC07/28/2021
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC07/13/2021
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC05/25/2021
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC05/13/2021
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC02/25/2021
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP03/30/2020
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC03/24/2020
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP03/18/2020
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC01/16/2020
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC12/31/2019
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC12/31/2019
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC12/31/2019
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC12/31/2019
DOB NOWBoiler EquipmentPermit IssuedJACK PICCINI, INC12/31/2019
BISFBISSUEDCHAMPION COMBUSTION CORP01/30/2020
+ 45 more permits on file
1 project · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedM&T ELECTRICAL LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
09/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/04/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/18/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
08/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/26/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/04/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/25/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/28/2022Pass-Final Boiler Equipment InspectionPassView ↗
08/24/2021Pass-Final Boiler Equipment InspectionPassView ↗
07/19/2021Pass-Final Boiler Equipment InspectionPassView ↗
07/09/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
03/24/2025HVAC-R and service water heating system controlsSULIMAN AHMEDenergy_progress
03/24/2025Maintenance informationSULIMAN AHMEDenergy_progress
02/26/2025Maintenance informationSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water heating equipmentSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water piping design and insulationSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water heating equipmentSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water heating system controlsSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water heating system controlsSULIMAN AHMEDenergy_progress
02/26/2025Maintenance informationSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water heating equipmentSULIMAN AHMEDenergy_progress
02/26/2025Maintenance informationSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water piping design and insulationSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water piping design and insulationSULIMAN AHMEDenergy_progress
02/26/2025HVAC-R and service water heating system controlsSULIMAN AHMEDenergy_progress
02/24/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsSULIMAN AHMEDspecial
02/24/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsSULIMAN AHMEDspecial
02/24/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsSULIMAN AHMEDspecial
09/11/2024Maintenance informationSULIMAN AHMEDenergy_progress
09/11/2024HVAC-R and service water heating system controlsSULIMAN AHMEDenergy_progress
09/11/2024HVAC-R and service water heating equipmentSULIMAN AHMEDenergy_progress
09/11/2024HVAC-R and service water piping design and insulationSULIMAN AHMEDenergy_progress
09/11/2024HVAC-R and service water heating equipmentSULIMAN AHMEDenergy_progress
09/11/2024HVAC-R and service water heating system controlsSULIMAN AHMEDenergy_progress
06/24/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsSULIMAN AHMEDspecial
06/22/2024HVAC-R and service water heating equipmentSULIMAN AHMEDenergy_progress
Latest 25 of 97.
▾Documents — 897 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch27
08/27/2026Q00518997-I1Request digital key ↗
08/27/2026Q00519275-I1Request digital key ↗
08/27/2026Q00559156-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment13
08/28/2026Q00278042-I1Request digital key ↗
08/28/2026Q00278120-I1Request digital key ↗
08/28/2026Q00276202-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits137
▸BISWORK PERMIT APPLICATION89
01/30/2020440563338Open ↗
01/30/2020440563310Open ↗
01/30/2020440563196Open ↗
Showing 3 of 89 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION48
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 48 on file for this type
▸Seals & Professional Certifications319
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
09/12/2018420958360Open ↗
09/12/2018420958565Open ↗
09/12/2018420958342Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
09/29/2026Q00804221-P1Open ↗
09/23/2026Q00278042-I1Open ↗
09/23/2026Q00278042-I1Open ↗
Showing 3 of 58 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT42
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/28/2026Q00278042-I1Open ↗
08/28/2026Q00278120-I1Open ↗
08/28/2026Q00278158-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/29/2026Q00804221-P1Open ↗
09/23/2026Q00278042-I1Open ↗
09/23/2026Q00276202-I1Open ↗
Showing 3 of 29 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION17
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY17
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment49
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT49
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 49 on file for this type
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
07/31/2017440423506Open ↗
07/31/2017440423490Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance144
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS72
09/12/2018420958360Open ↗
09/12/2018420958565Open ↗
09/12/2018420958342Open ↗
Showing 3 of 72 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
09/12/2018420958360Open ↗
09/12/2018420958565Open ↗
09/12/2018420958583Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS17
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY17
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 17 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00449133-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00322354-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY17
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs51
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
08/30/2019420958360Open ↗
09/12/2018420958360Open ↗
09/12/2018420958565Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸Cost, Insurance & Ownership71
▸BISCOST AFFIDAVIT71
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 71 on file for this type
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
08/28/2019440563338Open ↗
08/28/2019440563310Open ↗
08/28/2019440563196Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION1
10/18/2016440275836Open ↗