← Back
QUEENS
69-47 ELIZABETH AVENUE
QUEENS · BIN 4824252
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Floor 23p · 1 filing · 7 docs
Floor 17p · 2 filings · 9 docs
Cellar3p · 1 filing · 7 docs
Site & exterior5p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS LLC1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.302/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor903/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781102/11/2021
IP CONCRETE TESTING AND I6252102/11/2021
Building Lifecycle
All (35)Filed (3)Permit Issued (4)Signed Off (3)Inspection (6)Objection (10)Special Inspection (9)
10/29/2021
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB, BIS # 440654686.
Q00467238-I1
10/19/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2021
Signed off — Alteration
Curb cut application filed in conjunction with NB application # 440654686. Propose 10'-0" curb cut with 1'-6" splay on ELIZABETH AVENUE. 100' From BEACH 72 STREET.
Q00467228-I1
10/15/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/14/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION # 440654686. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00467224-I1
07/23/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/23/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/23/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2021
Permit issued — Plumbing
Q00467238-I1-PL
06/03/2021
Permit issued — Curb Cut
Q00467228-I1-CC
04/30/2021
Permit issued — Construction Fence
Q00467224-I1-FN
04/26/2021
Permit issued — Construction Fence
Q00467224-I1-FN
03/10/2021
Objection raised — Admin
03/10/2021
Objection resolved — Addressed
03/10/2021
Objection raised — Other
03/10/2021
Objection resolved — Addressed
03/10/2021
Objection raised — Scope
03/10/2021
Objection resolved — Addressed
02/12/2021
Objection raised — Inspections
02/12/2021
Objection resolved — Addressed
02/12/2021
Objection raised — Structural
02/12/2021
Objection resolved — Addressed
02/11/2021
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB, BIS # 440654686.
Q00467238-I1
02/10/2021
Filed — Alteration
Curb cut application filed in conjunction with NB application # 440654686. Propose 10'-0" curb cut with 1'-6" splay on ELIZABETH AVENUE. 100' From BEACH 72 STREET.
Q00467228-I1
02/10/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION # 440654686. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00467224-I1
02/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/10/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
02/10/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
02/10/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/10/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/08/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/14/2021
DOB NOWCurb CutSigned-offYAFE MEOD CORP06/03/2021
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP04/30/2021
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP04/26/2021
1 project · most recent 05/21/2021
General Wiring
FiledStatusContractorScope
05/21/2021CompleteSKY ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/19/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
07/23/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/23/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/10/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/10/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
02/10/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
02/10/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/10/2021HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/10/2021HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/10/2021HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/10/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
02/08/2021FinalCHRISTIAN LOZADAprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00467224-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00467228-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026Q00467238-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026Q00467224-I1Open ↗
08/22/2026Q00467238-I1Open ↗
08/22/2026Q00467238-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00467238-I1Open ↗
08/13/2026Q00467228-I1Open ↗
08/13/2026Q00467224-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026Q00467238-I1Open ↗
08/22/2026Q00467238-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00467238-I1Open ↗