← Back
Two stories - detached, small or mid-size
69-61 180 STREET
QUEENS · BIN 4153538
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2AZoning
1,334 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
69-61 180TH STREET2207/08/2026
TRENDZ CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS1104/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LS EXPEDITOR503/21/2026
JLS DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor507/08/2026
FLINT MECHANICAL CORPPlumbing207/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
DIESEL CONTRACTING OF N.YGeneral Contractor107/08/2026
TRENDZ CONTRACTING CORPGeneral Contractor103/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JLS DESIGNS1377704/14/2026
Building Lifecycle
All (86)Filed (11)Permit Issued (10)Signed Off (4)Violation (1)Inspection (8)Objection (22)Special Inspection (30)
07/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/06/2026
Signed off — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-S2
05/14/2026
Special inspection requirement — Mechanical Systems
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — Final
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — Ventilation and air distribution system
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — Maintenance information
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOSEPH SULTANA, JR
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH SULTANA, JR
05/05/2026
Signed off — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-I1
04/22/2026
Special inspection requirement — Fenestration air leakage
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Fenestration areas
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Interior lighting power
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Insulation placement and R values
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Preliminary
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Final
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Footing and Foundation
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Masonry
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH SULTANA, JR
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH SULTANA, JR
04/14/2026
Filed — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-P7
04/14/2026
Filed — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-P6
04/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/09/2026
Special inspection requirement — Fenestration areas
04/09/2026
Special inspection requirement — Insulation placement and R values
04/09/2026
Special inspection requirement — Fenestration air leakage
04/09/2026
Special inspection requirement — Interior lighting power
04/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Special inspection requirement — Footing and Foundation
JOSEPH SULTANA, JR
04/01/2026
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH SULTANA, JR
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH SULTANA, JR
04/01/2026
Special inspection requirement — Masonry
JOSEPH SULTANA, JR
02/18/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/09/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/09/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
11/11/2025
Objection raised — Zoning
11/11/2025
Objection raised — Scope
11/11/2025
Objection raised — Zoning
11/11/2025
Objection raised — Scope
11/11/2025
Objection raised — Cost
11/11/2025
Objection raised — Scope
11/06/2025
Permit issued — Earth Work
Q08016329-I1-GC-CX
11/06/2025
Permit issued — Mechanical Systems
Q08016329-S2-MS
11/05/2025
Signed off — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-S1
11/04/2025
Signed off — Alteration
Temp wood construction fence
Q00928083-I1
10/10/2025
Filed — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-P5
04/17/2025
Filed — Alteration
Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling
Q08016329-P4
03/20/2025
Permit issued — Mechanical Systems
Q08016329-S2-MS
03/10/2025
Permit issued — Foundation
Q08016329-I1-GC-CX
02/04/2025
Permit issued — Plumbing
Q08016329-S1-PL
07/31/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offDFE CONTRACTOR LLC11/06/2025
DOB NOWMechanical SystemsSigned-offDFE CONTRACTOR LLC11/06/2025
DOB NOWMechanical SystemsSigned-offCENTRAL CONSTRUCTION MAN*03/20/2025
DOB NOWFoundationSigned-offDFE CONTRACTOR LLC03/10/2025
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP02/04/2025
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP01/29/2024
DOB NOWFoundationSigned-offDFE CONTRACTOR LLC01/29/2024
DOB NOWConstruction FenceSigned-offDFE CONTRACTOR LLC01/24/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC09/01/2023
DOB NOWFoundationSigned-offTRENDZ CONTRACTING CORP08/11/2023
1 project · most recent 04/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026Signed-offDFE CONTRACTOR LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMH-Z-U1 42,000 BTU · Vrf Outdoor ×4
1 project · most recent 04/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/14/2026Signed-offFLINT MECHANICAL CORPGas, Water/Sanitary
3 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
09/14/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
07/24/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
1 project · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026Signed-offDFE CONTRACTOR LLC7 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/18/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/09/2026Fail-Final General Construction Non-Directive 14FailView ↗
07/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
05/14/2026Mechanical SystemsJOSEPH SULTANA, JRspecial
05/14/2026FinalJOSEPH SULTANA, JRprogress
05/14/2026Ventilation and air distribution systemJOSEPH SULTANA, JRenergy_progress
05/14/2026HVAC-R and service water heating equipmentJOSEPH SULTANA, JRenergy_progress
05/14/2026Maintenance informationJOSEPH SULTANA, JRenergy_progress
05/14/2026HVAC-R and service water piping design and insulationJOSEPH SULTANA, JRenergy_progress
05/14/2026Duct leakage testing, insulation and designJOSEPH SULTANA, JRenergy_progress
05/14/2026HVAC-R and service water heating system controlsJOSEPH SULTANA, JRenergy_progress
04/22/2026Fenestration air leakageJOSEPH SULTANA, JRenergy_progress
04/22/2026Fenestration areasJOSEPH SULTANA, JRenergy_progress
04/22/2026Interior lighting powerJOSEPH SULTANA, JRenergy_progress
04/22/2026Insulation placement and R valuesJOSEPH SULTANA, JRenergy_progress
04/22/2026PreliminaryJOSEPH SULTANA, JRprogress
04/22/2026FinalJOSEPH SULTANA, JRprogress
04/22/2026Footing and FoundationJOSEPH SULTANA, JRprogress
04/22/2026Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
04/22/2026Concrete - Cast-In-PlaceJOSEPH SULTANA, JRspecial
04/22/2026MasonryJOSEPH SULTANA, JRspecial
04/22/2026Fenestration and door U-factor and product ratingsJOSEPH SULTANA, JRenergy_progress
04/22/2026Energy Code Compliance InspectionsJOSEPH SULTANA, JRprogress
04/22/2026Fire-Resistance Rated ConstructionJOSEPH SULTANA, JRprogress
04/09/2026Fenestration and door U-factor and product ratings—energy_progress
04/09/2026Fenestration areas—energy_progress
04/09/2026Insulation placement and R values—energy_progress
04/09/2026Fenestration air leakage—energy_progress
Latest 25 of 50.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026Q00928083-I1Request digital key ↗
08/17/2026Q08016329-P7Request digital key ↗
08/17/2026Q08016329-P6Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q08016329-P1Open ↗
08/13/2026Q08016329-P3Open ↗
08/13/2026Q08016329-P5Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026Q08016329-P6Open ↗
09/01/2026Q08016329-P6Open ↗
09/01/2026Q08016329-P6Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026Q08016329-P6Open ↗
09/01/2026Q08016329-P6Open ↗
09/01/2026Q08016329-P6Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026Q00928083-I1Open ↗
08/17/2026Q08016329-P2Open ↗
08/17/2026Q08016329-P7Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/17/2026Q08016329-P7Open ↗
08/17/2026Q08016329-P6Open ↗
08/17/2026Q08016329-P5Open ↗
Showing 3 of 10 on file for this type
▸Other Documents16
▸DOB NOWSite Survey: Initial5
08/13/2026Q08016329-P5Open ↗
08/13/2026Q08016329-I1Open ↗
08/13/2026Q08016329-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q08016329-I1Open ↗
08/13/2026Q08016329-P6Open ↗
08/13/2026Q08016329-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026Q08016329-P5Open ↗
08/13/2026Q08016329-P1Open ↗
08/13/2026Q08016329-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08016329-I1Open ↗