← Back
Large suburban residence
69-62 112 STREET
QUEENS · Forest Hills · BIN 4052517
💬 Discuss this project
1935Year Built
2Stories
A3Building Class
R1-2AZoning
2,632 sfGross Floor Area
1Units
Large suburban residence · 7,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/02/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/02/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/23/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 37 Panels, 15.17 kW
Q01074578-I1
07/08/2024
Permit issued — Solar
Q01074578-I1-SL
07/02/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 37 Panels, 15.17 kW
Q01074578-I1
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/01/2024
Special inspection requirement — Final
Mina Makar
07/01/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/08/2024
2 projects · most recent 07/02/2024
FiledStatusContractorScope
07/02/2024CompleteISLAND ELECTRIC CORP—
10/19/2019CompleteJK ELECTRICAL INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/01/2024Fire-Resistant Penetrations and JointsMina Makarspecial
07/01/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
07/01/2024Energy Code Compliance InspectionsMina Makarprogress
07/01/2024FinalMina Makarprogress
07/01/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01074578-I1Open ↗
08/28/2026Q01074578-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01074578-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q01074578-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01074578-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01074578-I1Open ↗