Two family brick
69-62 CALDWELL AVENUE
QUEENS · Maspeth · BIN 4624896
💬 Discuss this project
2023Year Built
3Stories
B1Building Class
R4-1Zoning
2,647 sfGross Floor Area
2Units
0 Active Violations
Two family brick · 2,817 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof28p · 2 filings · 20 docs
Floor 339p · 1 filing · 20 docs
Floor 236p · 2 filings · 20 docs
Floor 134p · 2 filings · 20 docs
Cellar35p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
Site & exteriorTemporary construction fence at open space2p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2025$1.7M—Ideate Caldwell → Private party$654/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering505/01/2025
Jimenez Building Consulting510/24/2024
Bayside Associates212/15/2023
Jian Engineering209/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD Design Studio2003/21/2026
JRK Creative403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wing Jay ConstructionGeneral Contractor707/08/2026
Wing Jay ConstructionScaffold207/08/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
S & L PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S70101305/01/2025
Building Lifecycle
05/20/2025
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
05/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
05/20/2025
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
05/20/2025
Special inspection requirement — Fenestration areas
XIUCHENG LI
05/20/2025
Special inspection requirement — Electric vehicle service equipment requirements
XIUCHENG LI
83 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L Plumbing12/02/2024
DOB NOWFull DemolitionSigned-offWing Jay Construction10/08/2024
DOB NOWConstruction FenceSigned-offWing Jay Construction03/25/2024
DOB NOWGeneral ConstructionPermit IssuedWing Jay Construction03/25/2024
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating01/29/2024
DOB NOWGeneral ConstructionPermit IssuedWing Jay Construction11/28/2023
DOB NOWGeneral ConstructionSigned-offWing Jay Construction09/21/2023
DOB NOWFull DemolitionSigned-offWing Jay Construction09/01/2023
DOB NOWConstruction FenceSigned-offWing Jay Construction06/13/2023
1 project · most recent 05/01/2025
Sprinkler System
FiledStatusContractorScope
05/01/2025——Sprinkler System
1 project · most recent 05/01/2025
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/01/2025Signed-offCase PlumbingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 01/09/2024
General Wiring
FiledStatusContractorScope
01/09/2024CompleteLume ElectricGeneral Wiring
1 project · most recent 05/01/2025
Steel Concrete Masonry
FiledStatusContractorScope
05/01/2025Signed-offCase PlumbingSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/04/2024Fail-Final PL - UndergroundFailView ↗
04/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
05/20/2025Maintenance informationXIUCHENG LIenergy_progress
05/20/2025MasonryXIUCHENG LIspecial
05/20/2025Concrete - Cast-In-PlaceXIUCHENG LIspecial
05/20/2025Excavations - Sheeting, Shoring, and BracingXIUCHENG LIspecial
05/20/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
05/20/2025Subgrade InspectionsXIUCHENG LIspecial
05/20/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/20/2025Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
05/20/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
05/20/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
05/20/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
05/20/2025Insulation placement and R valuesXIUCHENG LIenergy_progress
05/20/2025Electric vehicle service equipment requirementsXIUCHENG LIenergy_progress
05/20/2025MeteringXIUCHENG LIenergy_progress
05/20/2025Fenestration areasXIUCHENG LIenergy_progress
05/20/2025Interior lighting powerXIUCHENG LIenergy_progress
05/20/2025Protection of exposed foundation insulationXIUCHENG LIenergy_progress
05/20/2025Permanent certificateXIUCHENG LIenergy_progress
05/20/2025Fenestration air leakageXIUCHENG LIenergy_progress
05/20/2025Air barrier — testing XIUCHENG LIenergy_progress
05/01/2025Excavations - Sheeting, Shoring, and BracingXIUCHENG LIspecial
05/01/2025Interior lighting powerXIUCHENG LIenergy_progress
05/01/2025MeteringXIUCHENG LIenergy_progress
05/01/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
05/01/2025Protection of exposed foundation insulationXIUCHENG LIenergy_progress
Latest 25 of 123.