← Back
BuildNYC
One story - permanent living quarter
69-66 183RD STREET
QUEENS · BIN 4153610
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R2AZoning
1,219 sfGross Floor Area
1Units
One story - permanent living quarter · 4,720 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPV system installation on rooftopUnder Construction7p · 2 filings · 20 docs
AtticUnder Construction13p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction13p · 1 filing · 20 docs
Site & exteriorUnder Construction13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/13/2024$900K—Private party → Private party$738/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gerald Caliendo Architects810/13/2026
Tom Petersen Architect105/13/2026
Diagrid Consultants302/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J. Caliendo R.A603/21/2026
Dmconsulting6860403/21/2026
Gerald J Caliendo Rapc603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
At Home ConstructionGeneral Contractor904/09/2026
At Home ConstructionScaffold204/09/2026
Zone Plumbing & HeatingPlumbing208/13/2026
Solarblocks EnergyGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection15191010/13/2026
Thomas Petersen Architect7854105/13/2026
Building Lifecycle
All (93)Filed (12)Permit Issued (10)Signed Off (4)Inspection (5)Objection (32)Special Inspection (30)
10/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-P5
09/18/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-S1
09/10/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01401941-I1
08/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-P4
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/24/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/24/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
08/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
08/12/2026
Permit issued — Plumbing
Q01160295-S5-PL
05/20/2026
Permit issued — Solar
Q01401941-I1-SL
05/13/2026
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01401941-I1
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/13/2026
Special inspection requirement — Final
TOM PETERSEN
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2026
Permit issued — Construction Fence
Q01160295-S1-FN
03/25/2026
Permit issued — Structural
Q01160295-I1-GC-CX
03/20/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/21/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
11/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
11/15/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
11/15/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
11/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/15/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
11/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
11/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
10/24/2025
Objection raised — Scope
10/24/2025
Objection resolved — Addressed
09/28/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-P3
09/27/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
09/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
09/27/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
09/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/22/2025
Objection raised — Scope
08/22/2025
Objection raised — Plumbing
08/22/2025
Objection raised — Zoning
08/22/2025
Objection raised — Energy
08/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-P2
07/11/2025
Permit issued — Plumbing
Q01160295-S5-PL
07/03/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-S2
07/02/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, INTERIOR RENO. AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01160295-S3
05/23/2025
Objection resolved — Addressed
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZone Plumbing & Heating08/12/2026
DOB NOWSolarSigned-offSolarblocks Energy05/20/2026
DOB NOWConstruction FenceSigned-offAt Home Construction03/25/2026
DOB NOWStructuralPermit IssuedAt Home Construction03/25/2026
DOB NOWPlumbingPermit IssuedZone Plumbing & Heating07/11/2025
DOB NOWGeneral ConstructionPermit IssuedAt Home Construction03/26/2025
DOB NOWFoundationSigned-offAt Home Construction03/24/2025
DOB NOWStructuralPermit IssuedAt Home Construction03/24/2025
DOB NOWConstruction FenceSigned-offAt Home Construction03/21/2025
DOB NOWSupport of ExcavationSigned-offAt Home Construction03/21/2025
1 project · most recent 10/13/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/13/2026Signed-offAt Home ConstructionAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×9
Heating
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×9
Ventilation
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×9
1 project · most recent 10/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/13/2026Permit Issued5 Boro's PlumbingGas, Storm, Water/Sanitary
3 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026CompleteElectrician NYCGeneral Wiring
10/20/2025CompleteMDC Security and Electrical—
08/04/2025Permit IssuedLens ElectricGeneral Wiring
1 project · most recent 10/13/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
10/13/2026Permit Issued5 Boro's PlumbingSteel, Concrete, Masonry, Wood
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Signed-offSolarblocks Energy22 panels, 9.68 kw, 1,443 roof_area_sqft
1 project · most recent 10/13/2026
Fence
FiledStatusContractorScope
10/13/2026Permit Issued5 Boro's PlumbingFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/21/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
08/24/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/24/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/24/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/24/2026Maintenance informationYounes Abouyaalaenergy_progress
08/24/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/24/2026Permanent certificateYounes Abouyaalaenergy_progress
08/24/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/24/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
05/13/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
05/13/2026FinalTOM PETERSENprogress
05/13/2026Energy Code Compliance InspectionsTOM PETERSENprogress
11/15/2025Maintenance informationYounes Abouyaalaenergy_progress
11/15/2025Permanent certificateYounes Abouyaalaenergy_progress
11/15/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
11/15/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
11/15/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/15/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
11/15/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
11/15/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/27/2025Permanent certificateYounes Abouyaalaenergy_progress
09/27/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/27/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
09/27/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/27/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/27/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
Latest 25 of 97.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026Q01160295-S1Request digital key ↗
08/20/2026Q01160295-P3Request digital key ↗
08/20/2026Q01160295-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-I1Open ↗
08/13/2026Q01160295-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-I1Open ↗
08/13/2026Q01160295-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-I1Open ↗
08/13/2026Q01160295-P2Open ↗
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026Q01160295-P4Open ↗
09/23/2026Q01160295-P4Open ↗
09/12/2026Q01160295-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026Q01160295-P4Open ↗
09/23/2026Q01160295-P4Open ↗
09/12/2026Q01160295-S2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-S5Open ↗
08/20/2026Q01160295-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-S5Open ↗
08/20/2026Q01160295-I1Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT7
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-I1Open ↗
08/20/2026Q01160295-S5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
08/13/2026Q01160295-S5Open ↗
08/13/2026Q01160295-I1Open ↗
08/13/2026Q01160295-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q01160295-S2Open ↗
08/13/2026Q01160295-S3Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-I1Open ↗
08/13/2026Q01160295-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/20/2026Q01160295-AR01Open ↗
08/20/2026Q01160295-I1Open ↗
08/13/2026Q01160295-P2Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026Q01160295-S2Open ↗
08/13/2026Q01160295-I1Open ↗
08/13/2026Q01160295-S3Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q01160295-I1Open ↗
08/20/2026Q01160295-AR01Open ↗
08/13/2026Q01160295-P2Open ↗