← Back
One story retail building
69 HINSDALE STREET
BROOKLYN · East New York (North) · BIN 3427476
💬 Discuss this project
2005Year Built
1Stories
K1Building Class
M1-4Zoning
5,873 sfGross Floor Area
1Units
One story retail building · Owner of record: BLUE ASTER LANDCO LLC · 17,725 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Site & exteriorUnder Construction1 filing · 3 docs
Filed — no permit issued45p · 4 filings · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2024$6.0M—BERGEN REALTY, INC. → BLUE ASTER LANDCO LLC$1,022/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering Consultants, G507/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITANIUM CONSTRUCTION SERGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803401/06/2026
Building Lifecycle
All (45)Filed (5)Permit Issued (1)Objection (15)Special Inspection (24)
09/17/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Resolved
09/14/2026
Objection resolved — Resolved
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/21/2026
Filed — Alteration
Proposed curb cut on 63 Hinsdale St as per plans filed herewith. No change to use, egress, or occupancy. Proposed curb cut length is 13ft. Related Altco #B01266031
B01266043-I1
05/29/2026
Permit issued — General Construction
B01341966-I1-GC-CX
01/06/2026
Filed — Alteration
General construction and structural modifications as per plans filed herewith. No change to use, occupancy, or egress. Scope limited to below ground only
B01341966-I1
01/06/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
09/29/2025
Objection raised — Scope
09/29/2025
Objection raised — Zoning
09/22/2025
Objection raised — Zoning
09/22/2025
Objection raised — Admin
09/22/2025
Objection raised — Admin
09/22/2025
Objection raised — Zoning
09/22/2025
Objection raised — Admin
09/22/2025
Objection raised — Inspections
09/22/2025
Objection raised — Zoning
09/17/2025
Objection raised — Other
09/16/2025
Filed — Alteration CO
General construction and structural modifications as per plans filed herewith. No change to use, occupancy, or egress.
B01266031-I1
09/16/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Seismic Isolation Systems
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
09/09/2025
Filed — Alteration
BESS installation as per plans filed herewith. No change in use, egress, or occupancy. This application is in conjunction with existing Alt-CO filing #B01266031
B01266035-I1
09/05/2025
Filed — Alteration
Solar installation as per plans filed herewith. No change in use, egress, or occupancy.
B01266039-I1
08/29/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
08/29/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER05/29/2026
1 project · most recent 09/21/2026
FiledStatusContractorScope
09/21/2026Permit IssuedTOUCHTEL TECHNOLOGY GROUP—
3 projects · most recent 01/06/2026
Concrete Masonry Steel
FiledStatusContractorScope
01/06/2026Permit IssuedTITANIUM CONSTRUCTION SERConcrete, Masonry
09/16/2025——Steel, Concrete
09/09/2025——2 scope_items
1 project · most recent 09/05/2025
FiledStatusContractorScope
09/05/2025——16 panels, 4,916 kw
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/06/2026Post-installed AnchorsSAMI HAJJAR P.Especial
01/05/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
01/05/2026MasonrySAMI HAJJAR P.Especial
01/05/2026Subgrade InspectionsSAMI HAJJAR P.Especial
01/05/2026Subsurface Conditions – Fill Placement & In-Place DensitySAMI HAJJAR P.Especial
01/05/2026FinalSAMI HAJJAR P.Eprogress
09/16/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
09/16/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/16/2025MasonrySAMI HAJJAR P.Especial
09/16/2025Post-installed AnchorsSAMI HAJJAR P.Especial
09/16/2025Seismic Isolation SystemsSAMI HAJJAR P.Especial
09/16/2025Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
09/16/2025Subgrade InspectionsSAMI HAJJAR P.Especial
09/16/2025Subsurface Conditions – Fill Placement & In-Place DensitySAMI HAJJAR P.Especial
09/16/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
08/29/2025Post-installed AnchorsSAMI HAJJAR P.Especial
08/29/2025FinalSAMI HAJJAR P.Eprogress
08/29/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/04/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/04/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/04/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/04/2025FinalSAMI HAJJAR P.Eprogress
08/04/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
08/04/2025FinalSAMI HAJJAR P.Eprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01266035-I1Request digital key ↗
08/14/2026B01266039-I1Request digital key ↗
08/14/2026B01266031-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01266031-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01266031-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01341966-I1Open ↗
08/27/2026B01266035-I1Open ↗
08/25/2026B01266039-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026B01266031-I1Open ↗
08/16/2026B01266043-I1Open ↗
08/13/2026B01266039-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01341966-I1Open ↗
08/27/2026B01266035-I1Open ↗
08/25/2026B01266039-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01266031-I1Open ↗