Two family frame
69 NASHVILLE STREET
STATEN ISLAND · BIN 5166434
💬 Discuss this project
2024Year Built
3Stories
B2Building Class
R3XZoning
2,534 sfGross Floor Area
2Units
Two family frame · Owner of record: Nina Grace Estates · 3,802 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof mounted solar panel installation6p · 2 filings · 20 docs
AtticFire Sprinkler System Installation1 filing · 3 docs
Floor 2Fire Sprinkler System Installation24p · 2 filings · 20 docs
Floor 1Fire Sprinkler System Installation13p · 2 filings · 20 docs
CellarFire Sprinkler System Installation23p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maximum ContractingGeneral Contractor1107/08/2026
Premier PL, Heating & MechanicalPlumbing207/08/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
Aaron Plumbing & Mechanical SystemsFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272104/07/2026
SRA Planning & Expediting5677708/19/2024
A Tech Engineering NYC, P6738202/20/2024
Building Lifecycle
05/18/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01382850-I1
04/13/2026
Permit issued — Solar
S01382850-I1-SL
04/07/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01382850-I1
04/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service04/13/2026
DOB NOWStructuralPermit IssuedMaximum Contracting05/09/2024
DOB NOWCurb CutSigned-offMaximum Contracting05/02/2024
DOB NOWMechanical SystemsSigned-offMaximum Contracting05/01/2024
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical04/10/2024
DOB NOWSprinklersSigned-offAaron Plumbing & Mechanical Systems04/10/2024
DOB NOWGeneral ConstructionPermit IssuedMaximum Contracting09/15/2023
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical06/21/2023
DOB NOWFoundationPermit IssuedMaximum Contracting12/01/2022
1 project · most recent 08/19/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScope
08/19/2024Permit IssuedMaximum ContractingAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
1 project · most recent 08/19/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2024Signed-offPremier PL, Heating & MechanicalGas, Storm, Water/Sanitary
2 projects · most recent 04/07/2026
General Wiring
FiledStatusContractorScope
04/07/2026CompleteSunrun Solar Electl—
12/03/2023CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 08/19/2024
Wood
FiledStatusContractorScope
08/19/2024Permit IssuedMaximum ContractingWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/24/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
05/09/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
05/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
04/07/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/07/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/03/2026FinalWalid Abdullaprogress
04/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/14/2024Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
08/14/2024HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
08/14/2024HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
08/14/2024FinalWILLIAM MONTAGUEprogress
08/14/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
08/14/2024Mechanical SystemsWILLIAM MONTAGUEspecial
08/14/2024Heating SystemsWILLIAM MONTAGUEspecial
08/14/2024Chimneys and ventsWILLIAM MONTAGUEspecial
08/14/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
08/14/2024Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
08/14/2024Permanent certificateWILLIAM MONTAGUEenergy_progress
08/14/2024Maintenance informationWILLIAM MONTAGUEenergy_progress
08/14/2024HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
02/27/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/27/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
02/27/2024Soil Percolation Test - Individual On-Site Private Sewage Disposal Systemsanthony santorospecial
02/27/2024HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
02/27/2024HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
02/27/2024HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
02/06/2024Fenestration areasWILLIAM MONTAGUEenergy_progress
Latest 25 of 45.
69 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account