← Back
Three families
69 NORMAN AVENUE
BROOKLYN · BIN 3065554
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,340 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,216 sf lot · 1.92 FAR built · Flood zone X500
Locations of Work
ElectricalPlumbing
Floor 12p · 1 filing · 3 docs
Cellar3p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KING DAVID ARCHITECTURE PC211/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KING DAVID ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMAZIA CONSTRUCTION INCGeneral Contractor303/21/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781111/10/2023
Building Lifecycle
All (46)Filed (2)Permit Issued (2)Signed Off (1)Violation (10)Inspection (5)Objection (24)Special Inspection (2)
06/03/2026
Violation issued (HPD, closed)
C
06/03/2026
Violation issued (HPD, closed)
C
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FL PROPOSED THREE PIECE BATHROOM AT 1st FL ONLY. NO WORK AT CELLAR . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954939-I1
04/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/10/2024
Permit issued — Plumbing
B00956507-I1-PL
01/17/2024
Permit issued — General Construction
B00954939-I1-GC
01/08/2024
Objection resolved — Addressed
01/08/2024
Objection resolved — Addressed
12/27/2023
Objection resolved — Addressed
12/20/2023
Objection resolved — Addressed
12/20/2023
Objection resolved — Addressed
12/13/2023
Objection resolved — Addressed
12/01/2023
Objection resolved — Addressed
12/01/2023
Objection resolved — Addressed
11/30/2023
Objection raised — Other
11/30/2023
Objection raised — Fire_Protection
11/30/2023
Objection raised — Zoning
11/30/2023
Objection raised — Other
11/30/2023
Objection raised — Accessibility
11/30/2023
Objection raised — Other
11/30/2023
Objection raised — Other
11/30/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/20/2023
Objection raised — Other
11/20/2023
Objection raised — Other
11/20/2023
Objection raised — Scope
11/20/2023
Objection raised — Structural
11/20/2023
Objection raised — Other
11/10/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FL PROPOSED THREE PIECE BATHROOM AT 1st FL ONLY. NO WORK AT CELLAR . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954939-I1
11/10/2023
Filed — Alteration
B00956507-I1
10/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/31/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
03/24/2023
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, closed)
A
10/19/2018
Violation issued (HPD, closed)
I
06/02/2013
Violation issued (HPD, closed)
B
06/16/2007
Violation issued (HPD, closed)
C
06/16/2007
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP04/10/2024
DOB NOWGeneral ConstructionSigned-offLEMAZIA CONSTRUCTION INC01/17/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/31/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/31/2023FinalCHRISTIAN LOZADAprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00954939-I1Request digital key ↗
08/26/2026B00956507-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00956507-I1Open ↗
08/13/2026B00954939-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B00954939-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00954939-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00956507-I1Open ↗
08/13/2026B00954939-I1Open ↗