← Back
Two family frame
69 SANDALWOOD DRIVE
STATEN ISLAND · Great Kills-Eltingville · BIN 5061454
💬 Discuss this project
1982Year Built
2Stories
B2Building Class
R3-2Zoning
3,696 sfGross Floor Area
2Units
Two family frame · 2,865 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 2 filings · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC211/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272211/13/2025
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Signed Off (2)Special Inspection (10)
03/12/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01301441-I1
12/16/2025
Permit issued — Solar
S01301441-I1-SL
11/13/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01301441-I1
11/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/10/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/10/2025
Special inspection requirement — Final
Walid Abdulla
07/01/2024
Signed off — Alteration
S01023215-I1
04/02/2024
Permit issued — Solar
S01023215-I1-SL
03/26/2024
Filed — Alteration
S01023215-I1
03/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/20/2024
Special inspection requirement — Final
Walid Abdulla
03/20/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/16/2025
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/02/2024
2 projects · most recent 11/13/2025
FiledStatusContractorScope
11/13/2025CompleteSUNRUN SOLAR ELECTL CORP—
03/26/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/13/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/10/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
10/10/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/10/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/10/2025FinalWalid Abdullaprogress
03/20/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/20/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/20/2024Energy Code Compliance InspectionsWalid Abdullaprogress
03/20/2024FinalWalid Abdullaprogress
03/20/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01023215-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/25/2026S01023215-I1Open ↗
08/25/2026S01023215-I1Open ↗
08/25/2026S01023215-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026S01023215-I1Open ↗
08/25/2026S01023215-I1Open ↗
08/24/2026S01301441-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01301441-I1Open ↗
08/13/2026S01023215-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01023215-I1Open ↗
08/13/2026S01301441-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWUtility Company Final Acceptance Letter2
08/13/2026S01023215-I1Open ↗
08/13/2026S01301441-I1Open ↗