0 Open Violations
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 72p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S. WIEDER ARCHITECT P.C.703/13/2026
VASILIOS ARTEMIOU PE1203/12/2026
WEXLER ASSOCIATES310/07/2024
STRUCTURAL ENGINEERING TECHNOLOGIES608/08/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3942203/12/2026
Building Lifecycle
All (197)Filed (27)Permit Issued (26)Signed Off (12)Violation (2)Inspection (20)Objection (80)Special Inspection (30)
06/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-Z2
05/14/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-S4
05/14/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-Z3
05/01/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-S9
04/30/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/02/2026
Special inspection requirement — Standpipe Systems
Paul Raymond
04/02/2026
Special inspection requirement — Post-installed Anchors
Paul Raymond
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/02/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
03/24/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-Y2
03/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/17/2026
Permit issued — Mechanical Systems
B00845076-Y2-MS
03/13/2026
Filed — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-B3
03/12/2026
Filed — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-B2
03/10/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-S3
03/09/2026
Special inspection requirement — Standpipe Systems
Paul Raymond
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/09/2026
Special inspection requirement — Post-installed Anchors
Paul Raymond
03/09/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
03/04/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-Z9
03/04/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
03/04/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
02/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/25/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/13/2026
Filed — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-Y2
02/13/2026
Special inspection requirement — Mechanical Systems
Paul Raymond
02/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
02/13/2026
Special inspection requirement — Final
Paul Raymond
02/13/2026
Special inspection requirement — Shutoff dampers
Paul Raymond
02/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
02/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
02/13/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Paul Raymond
02/10/2026
Objection resolved — Addressed
02/10/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
02/10/2026
Special inspection requirement — Fenestration areas
Paul Raymond
02/10/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
02/10/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
02/10/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
02/10/2026
Special inspection requirement — Interior lighting power
Paul Raymond
02/10/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
02/10/2026
Special inspection requirement — Maintenance information
Paul Raymond
02/10/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
02/10/2026
Special inspection requirement — Metering
Paul Raymond
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
02/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
02/10/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
02/10/2026
Special inspection requirement — Vestibules
Paul Raymond
02/05/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
02/05/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
01/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/28/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/27/2026
Signed off — New Building
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
B00845076-S8
01/26/2026
Objection raised — Other
01/21/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/08/2026
Permit issued — Sprinklers
B00845076-Z2-EW-SD
01/08/2026
Permit issued — Standpipe
B00845076-Z3-EW-SD
01/08/2026
Permit issued — Standpipe
B00845076-Z2-EW-SP
01/06/2026
Objection resolved — Addressed
Latest 60 of 197 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBLUSTONE CONTRACTING LLC03/17/2026
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC01/08/2026
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/08/2026
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/08/2026
DOB NOWBoiler EquipmentSigned-offACE-ATLAS PLBG & HTG LLC01/05/2026
DOB NOWMechanical SystemsSigned-offBLUSTONE CONTRACTING LLC08/06/2025
DOB NOWGeneral ConstructionPermit IssuedBLUSTONE CONTRACTING LLC08/06/2025
DOB NOWConstruction FenceSigned-offBLUSTONE CONTRACTING LLC08/06/2025
DOB NOWMechanical SystemsSigned-offBLUSTONE CONTRACTING LLC05/14/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC04/28/2025
DOB NOWStructuralSigned-offBLUSTONE CONTRACTING LLC03/05/2025
DOB NOWConstruction FenceSigned-offBLUSTONE CONTRACTING LLC02/12/2025
DOB NOWGeneral ConstructionPermit IssuedBLUSTONE CONTRACTING LLC01/17/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/14/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/13/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/13/2025
DOB NOWStructuralSigned-offBLUSTONE CONTRACTING LLC11/29/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/14/2024
DOB NOWFoundationSigned-offBLUSTONE CONTRACTING LLC07/16/2024
DOB NOWGeneral ConstructionPermit IssuedBLUSTONE CONTRACTING LLC07/15/2024
DOB NOWGeneral ConstructionPermit IssuedBLUSTONE CONTRACTING LLC04/11/2024
DOB NOWCurb CutSigned-offBLUSTONE CONTRACTING LLC03/15/2024
DOB NOWSupport of ExcavationSigned-offBLUSTONE CONTRACTING LLC02/29/2024
DOB NOWGeneral ConstructionPermit IssuedBLUSTONE CONTRACTING LLC02/28/2024
DOB NOWConstruction FenceSigned-offBLUSTONE CONTRACTING LLC02/28/2024
DOB NOWFoundationSigned-offBLUSTONE CONTRACTING LLC02/27/2024
1 project · most recent 03/13/2026
Generators Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2026Signed-offBLUSTONE CONTRACTING LLCGenerators, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Generators
Generac SD300 300 kW · Generator ×1
Gillette Generators SPVD-3000-3-2-2 300 kW · Generator ×1
Heat / Cool
Mitsubishi Electric PEFY-P48NMAU-E4 918 CFM · Vrf Indoor ×58
PEFY-P36NMAU-E4 1,271 CFM · Vrf Indoor ×18
PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×14
MXZ-SM48NAM2-U1 48,000 BTU · Condensing Unit ×4
PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×2
PURY-EP168TNU-A1 168,000 BTU · Vrf Outdoor ×2
PURY-EP216TNU-1A 192,000 BTU · Vrf Outdoor ×2
PURY-EP240TSNU-1A 240,000 BTU · Vrf Outdoor ×2
Hotpoint AHHS09D3XXA 6,200 BTU · Ptac ×4
Heating
Qmark LFK-151F 175 CFM · Electric Heater ×34
Ventilation
Captiveaire CAPTIVE-AIRE DU360HFA 10,250 CFM · Exhaust Fan ×10
DU50HFA 660 CFM · Exhaust Fan ×10
USBI24DD-RM 3,850 CFM · Exhaust Fan ×2
Greenheck ERV-90-15L 3,755 CFM · Exhaust Fan ×2
ERVe-45-15H 2,500 CFM · Exhaust Fan ×2
N/A n/a 14,000 CFM · Exhaust Fan ×4
1 project · most recent 03/13/2026
Sprinkler System
FiledStatusContractorScope
03/13/2026Signed-offTRISTATE FIRE SPRINK INCSprinkler System
1 project · most recent 03/13/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/13/2026Signed-offQUALITY PIPING, INCStorm, Water/Sanitary
4 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026CompletePOWER DIRECT ELECTRIC INC16 meters, 16 new_meters
02/10/2026CompleteDENALI ELECTRIC CORP—
11/13/2025CompleteENERCHARGE ELECTRIC CONTGeneral Wiring
01/02/2025CompletePOWER DIRECT ELECTRIC INC—
1 project · most recent 03/13/2026
Concrete
FiledStatusContractorScope
03/13/2026Signed-offBLUSTONE CONTRACTING LLCConcrete
1 project · most recent 03/13/2026
Fence
FiledStatusContractorScope
03/13/2026Signed-offBLUSTONE CONTRACTING LLCFence
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
06/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/04/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/04/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
02/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
02/05/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/05/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
01/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/21/2026Pass-Final Boiler Equipment InspectionPassView ↗
08/06/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/13/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/30/2025Pass-Final House ConnectionPassView ↗
11/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/02/2026Standpipe SystemsPaul Raymondspecial
04/02/2026Sprinkler SystemsPaul Raymondspecial
04/02/2026Post-installed AnchorsPaul Raymondspecial
04/02/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/09/2026Post-installed AnchorsPaul Raymondspecial
03/09/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/09/2026Sprinkler SystemsPaul Raymondspecial
03/09/2026Standpipe SystemsPaul Raymondspecial
02/13/2026HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
02/13/2026HVAC-R and service water heating system controlsPaul Raymondenergy_progress
02/13/2026Shutoff dampersPaul Raymondenergy_progress
02/13/2026HVAC-R and service water heating equipmentPaul Raymondenergy_progress
02/13/2026FinalPaul Raymondprogress
02/13/2026Mechanical SystemsPaul Raymondspecial
02/13/2026Emergency and Standby Power Systems (Generator)Paul Raymondspecial
02/10/2026Exterior lighting powerPaul Raymondenergy_progress
02/10/2026Luminous Exit Path MarkingsPaul Raymondspecial
02/10/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/10/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
02/10/2026Energy Code Compliance InspectionsPaul Raymondprogress
02/10/2026Maintenance informationPaul Raymondenergy_progress
02/10/2026VestibulesPaul Raymondenergy_progress
02/10/2026Air barrier continuity plan testingPaul Raymondenergy_progress
02/10/2026Lighting in dwelling unitsPaul Raymondenergy_progress
02/10/2026MeteringPaul Raymondenergy_progress
Latest 25 of 150.
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/18/2026B00845076-Z9Request digital key ↗
08/18/2026B00845076-B3Request digital key ↗
08/18/2026B00845076-B2Request digital key ↗
Showing 3 of 28 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00845076-A6Open ↗
08/13/2026B00845076-I1Open ↗
08/13/2026B00845076-A1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B00845076-I1Open ↗
▸Seals & Professional Certifications158
▸DOB NOWSpecial Inspector Seal & Signature70
09/02/2026B00845076-Z2Open ↗
09/02/2026B00845076-Z2Open ↗
09/02/2026B00845076-Z2Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWProgress Inspector Seal & Signature61
08/30/2026B00845076-P6Open ↗
08/30/2026B00845076-P3Open ↗
08/30/2026B00845076-P3Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/18/2026B00845076-S3Open ↗
08/18/2026B00845076-P4Open ↗
08/18/2026B00845076-B3Open ↗
Showing 3 of 27 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00845076-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/15/2026B00845076-A1Open ↗
08/14/2026B00845076-A6Open ↗
08/14/2026B00845076-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00845076-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProperty Ownership Certification3
08/15/2026B00845076-A1Open ↗
08/14/2026B00845076-A6Open ↗
08/14/2026B00845076-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00845076-Z1Open ↗
▸DOB NOWFinal Survey1
08/14/2026B00845076-I1Open ↗