690 EAST 182ND STREET
BRONX · BIN 2012402
💬 Discuss this project
1926Year Built
5Stories
C1Building Class
R7-1Zoning
35,265 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized29 Active Violations 28 unresolved · 1 paperwork only 1 likely answered ▸
Over six families without stores · Owner of record: Clusters II Housing Development Fund Corp Poration · 9,452 sf lot · 3.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding alteration, construction, or partial demolition84p · 6 filings · 20 docs
BulkheadBuilding alteration, construction, or partial demolition1p · 1 filing · 20 docs
Floor 5Building alteration, construction, or partial demolition12p · 6 filings · 20 docs
Floor 4Building alteration, construction, or partial demolition142p · 5 filings · 20 docs
Floor 3Building alteration, construction, or partial demolition142p · 5 filings · 20 docs
Floor 2Building alteration, construction, or partial demolition143p · 5 filings · 20 docs
Floor 1Unit 1G158p · 5 filings · 20 docs
CellarBuilding alteration, construction, or partial demolition84p · 2 filings · 20 docs
BasementBuilding alteration, construction, or partial demolition17p · 4 filings · 20 docs
Sub-BasementBronx Cluster Sites - Shf61p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed21p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clusters II Housing Development Fund Corp Poration5109/13/2026
Neighborhood Renewal HDFC1407/08/2026
Marilou Development903/21/2026
690 E 182 St803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/22/2022$13.6M—Neighborhood Renewal Housing Development Fund → CLUSTERS II HOUSING DEVELOPMENT FUND CORPORATION$387/sf building
04/04/2019$12.1M—— → —$344/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates2503/21/2026
A1 Expediting Service803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Notias ConstructionGeneral Contractor1507/08/2026
J-J PlumbingPlumbing1407/08/2026
Akm Construction NYScaffold507/08/2026
Notias ConstructionScaffold307/08/2026
MNK EnterprisesScaffold303/21/2026
Village Electl ContractorsElectrical203/21/2026
Techno-Volt ElectricElectrical203/21/2026
Park Contracting GroupScaffold207/08/2026
Abilene ElectricElectrical103/21/2026
Techno-Volt ElectricElectrical103/22/2026
Techno-Volt ElectricGeneral Contractor103/22/2026
Alson Electrical ContractingElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
MNK Enterprises NYScaffold107/08/2026
Metro Electrical ContractorsElectrical103/22/2026
Shally Electrical CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co53442206/23/2026
Joel Phagoo, PE2416201/07/2025
Building Lifecycle
All (184)Filed (34)Permit Issued (33)Signed Off (7)Violation (60)Inspection (6)Objection (14)Special Inspection (30)
09/30/2026
Signed off — Alteration
Removal of existing steam heating boiler and components and replacement with (2) new hydraulic heating boilers and associated components.
X00674815-I1
09/30/2026
Signed off — Alteration
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this application.
X00525896-I1
08/12/2026
Signed off — Alteration
removal of existing steam heating system and components.
X00526037-I1
08/12/2026
Signed off — Alteration
Plumbing work as shown on plans filed herewith.
X00526043-I1
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
MINA HANNA
07/13/2026
Special inspection requirement — Post-installed Anchors
MINA HANNA
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
07/13/2026
Special inspection requirement — Masonry
MINA HANNA
07/13/2026
Special inspection requirement — Final
MINA HANNA
06/23/2026
Filed — Alteration
Interior structural work as shown on plans filed herewith.
X00526666-P3
06/11/2026
Violation issued (HPD, closed)
A
06/11/2026
Violation issued (HPD, closed)
B
06/11/2026
Violation issued (HPD, closed)
A
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
MINA HANNA
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
06/09/2026
Special inspection requirement — Final
MINA HANNA
06/09/2026
Special inspection requirement — Post-installed Anchors
MINA HANNA
06/09/2026
Special inspection requirement — Masonry
MINA HANNA
06/08/2026
Permit issued — General Construction
X00525896-I1-GC
06/04/2026
Permit issued — Sidewalk Shed
X00881906-I1-SH
05/19/2026
Violation issued (HPD, closed)
A
05/01/2026
Violation issued (HPD, closed)
C
05/01/2026
Special inspection requirement — Final
Mark Ginsberg
05/01/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
05/01/2026
Special inspection requirement — Insulation placement and R values
MINA HANNA
05/01/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
05/01/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
05/01/2026
Special inspection requirement — Lighting controls
MINA HANNA
05/01/2026
Special inspection requirement — Interior lighting power
MINA HANNA
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/21/2026
Objection resolved — Addressed
03/06/2026
Signed off — Alteration
Structural roof work as shown on plans filed herewith.
X00644435-I1
03/05/2026
Signed off — Alteration
X00644422-I1
02/27/2026
Objection raised — Scope
02/27/2026
Objection resolved — Addressed
02/26/2026
Objection raised — Other
02/25/2026
Special inspection requirement — Mechanical Systems
MINA HANNA
02/25/2026
Special inspection requirement — Final
MINA HANNA
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
02/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/24/2026
Special inspection requirement — Insulation placement and R values
MINA HANNA
02/24/2026
Special inspection requirement — Final
Mark Ginsberg
02/23/2026
Permit issued — Plumbing
X00526043-I1-PL
02/12/2026
Filed — Alteration
Plumbing work as shown on plans filed herewith.
X00526043-P5
02/12/2026
Filed — Alteration
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this application.
X00525896-P4
02/12/2026
Filed — Alteration
removal of existing steam heating system and components.
X00526037-P4
02/12/2026
Filed — Alteration
X00644422-P2
01/27/2026
Special inspection requirement — Lighting controls
MINA HANNA
01/27/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/27/2026
Special inspection requirement — Final
Mark Ginsberg
12/10/2025
Signed off — Alteration
X01061391-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/17/2025
Objection resolved — Addressed
09/16/2025
Objection raised — Admin
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNotias Construction06/08/2026
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group06/04/2026
DOB NOWPlumbingSigned-offJ-J Plumbing02/23/2026
DOB NOWStructuralPermit IssuedNotias Construction07/29/2025
DOB NOWGeneral ConstructionSigned-offNotias Construction07/29/2025
DOB NOWConstruction FencePermit IssuedNotias Construction07/29/2025
DOB NOWStructuralSigned-offNotias Construction07/29/2025
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group06/05/2025
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing04/08/2025
DOB NOWGeneral ConstructionSigned-offNotias Construction03/25/2025
DOB NOWMechanical SystemsSigned-offNotias Construction03/25/2025
DOB NOWPlumbingSigned-offJ-J Plumbing03/25/2025
DOB NOWStructuralSigned-offNotias Construction01/14/2025
DOB NOWConstruction FencePermit IssuedNotias Construction11/22/2024
DOB NOWSupported ScaffoldPermit IssuedAkm Construction NY09/16/2024
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY09/03/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedAkm Construction NY09/03/2024
DOB NOWStructuralPermit IssuedNotias Construction08/21/2024
DOB NOWGeneral ConstructionSigned-offNotias Construction08/14/2024
DOB NOWSuspended ScaffoldPermit IssuedPreet & B Construction Co06/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offNotias Construction06/11/2024
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises NY06/04/2024
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing04/22/2024
DOB NOWPlumbingSigned-offJ-J Plumbing03/19/2024
DOB NOWMechanical SystemsSigned-offNotias Construction03/19/2024
DOB NOWGeneral ConstructionSigned-offNotias Construction03/19/2024
DOB NOWStructuralSigned-offNotias Construction01/16/2024
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY08/22/2023
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises05/31/2023
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing05/22/2023
DOB NOWGeneral ConstructionSigned-offNotias Construction09/16/2022
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY08/03/2022
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing06/21/2022
BISOTISSUEDBlue Square Construction03/04/2016
BISEQISSUEDBlue Square Construction02/18/2016
BISEQISSUEDMarylou Development Co01/16/2002
BIS—ISSUEDMarylou Development Co01/16/2002
BIS—ISSUEDMarylou Development Co01/16/2002
BISPLISSUEDQueens, the Mechanical10/30/2001
BISPLISSUEDQueens, the Mechanical10/30/2001
+ 3 more permits on file
1 project · most recent 02/12/2026
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
02/12/2026Signed-offNotias ConstructionAssociated Ducts and Piping
Ducts & Piping
N/A N/A
1 project · most recent 02/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/12/2026Signed-offJ-J PlumbingGas, Water/Sanitary
6 projects · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025CompleteTechno-Volt ElectricGeneral Wiring
10/24/2025Permit IssuedAbilene Electric—
10/16/2025CompleteTechno-Volt ElectricGeneral Wiring
05/31/2023Permit IssuedRichard Neu—
08/01/2022Permit IssuedHigh Quality Electric of—
07/20/2018Permit IssuedMetro Electrical ContractorsGeneral Wiring
1 project · most recent 06/23/2026
Concrete
FiledStatusContractorScope
06/23/2026Permit IssuedNotias ConstructionConcrete
1 project · most recent 01/07/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
01/07/2025Permit IssuedAkm Construction NYScaffold, Sidewalk Shed
1 project · most recent 06/13/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/13/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/01/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/13/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
07/13/2026Post-installed AnchorsMINA HANNAspecial
07/13/2026FinalMINA HANNAprogress
07/13/2026MasonryMINA HANNAspecial
07/13/2026Concrete - Cast-In-PlaceMINA HANNAspecial
06/09/2026FinalMINA HANNAprogress
06/09/2026Concrete - Cast-In-PlaceMINA HANNAspecial
06/09/2026MasonryMINA HANNAspecial
06/09/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
06/09/2026Post-installed AnchorsMINA HANNAspecial
05/01/2026Insulation placement and R valuesMINA HANNAenergy_progress
05/01/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
05/01/2026Exterior lighting powerMINA HANNAenergy_progress
05/01/2026Lighting in dwelling unitsMINA HANNAenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
05/01/2026FinalMark Ginsbergprogress
05/01/2026Lighting controlsMINA HANNAenergy_progress
05/01/2026Air barrier - visual inspectionMINA HANNAenergy_progress
05/01/2026Interior lighting powerMINA HANNAenergy_progress
02/25/2026FinalMINA HANNAprogress
02/25/2026Mechanical SystemsMINA HANNAspecial
02/24/2026Insulation placement and R valuesMINA HANNAenergy_progress
02/24/2026FinalMark Ginsbergprogress
02/24/2026Energy Code Compliance InspectionsMINA HANNAprogress
02/24/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
Latest 25 of 89.
▾Documents — 278 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/24/2026X00674815-P2Request digital key ↗
08/24/2026X00674815-I1Request digital key ↗
08/23/2026X00881906-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
08/29/2017240196569Open ↗
03/04/2016220519017Open ↗
02/09/2016240131512Open ↗
▸BISWORK PERMIT APPLICATION2
03/04/2016220519017Open ↗
02/18/2016240131512Open ↗
▸Seals & Professional Certifications132
▸DOB NOWProgress Inspector Seal & Signature52
09/23/2026X00674815-I1Open ↗
09/23/2026X00674815-I1Open ↗
09/23/2026X00674815-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/23/2026X00674815-I1Open ↗
09/02/2026X00526666-I1Open ↗
09/02/2026X00526666-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/23/2026X00881906-I1Open ↗
08/21/2026X00526666-P1Open ↗
08/21/2026X00526666-I1Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/29/2017240196569Open ↗
03/04/2016220519017Open ↗
02/09/2016240131512Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/29/2017240196569Open ↗
02/09/2016240131512Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/29/2017240196569Open ↗
02/09/2016240131512Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/04/2016220519017Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/04/2016220519017Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/29/2017240196569Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/21/2026X00526666-I1Open ↗
08/18/2026X00526043-I1Open ↗
08/15/2026X00525896-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/29/2017240196569Open ↗
03/04/2016220519017Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X00674815-I1Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/04/2016220519017Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/29/2017240196569Open ↗
02/09/2016240131512Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
08/21/2026X00526666-P3Open ↗
08/18/2026X00526043-P4Open ↗
08/18/2026X00526043-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/18/2026X00526043-I1Open ↗
08/15/2026X00525896-I1Open ↗
08/13/2026X00644422-I1Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership4
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
02/18/2016240131512Open ↗
02/17/2016240131512Open ↗
▸BISCOST AFFIDAVIT2
08/29/2017240196569Open ↗
03/04/2016220519017Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
08/29/2017240196569Open ↗
02/09/2016240131512Open ↗
▸BISEFILING COVER SHEET1
03/04/2016220519017Open ↗
▸Other Documents46
▸DOB NOWDHCR Document40
08/21/2026X00526666-P3Open ↗
08/21/2026X00526666-P3Open ↗
08/13/2026X00526666-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations1
08/13/2026X01063718-I1Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026X00526666-I1Open ↗