Three families
690 HUMBOLDT STREET
BROOKLYN · BIN 3259415
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6BZoning
2,538 sfGross Floor Area
3Units
Three families · Owner of record: SAMASEN LLC · 1,800 sf lot · 1.41 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 7 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Floor 22p · 2 filings · 15 docs
Floor 11p · 1 filing · 8 docs
Basement11p · 5 filings · 20 docs
Sub-BasementUnder Construction1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAPPIER1907/08/2026
SAMASEN LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2026$3.8M—SAMASEN LLC → 690 HUMBOLDT STREET, LLC$1,497/sf building
03/04/2022$1.8M—— → —$707/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INCA ARCHITECTURE PLLC503/10/2026
CES ENGINEERING LLC301/21/2026
HIDAMARI ENGINEERING SERVICES, P.C.111/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C&M DRYWALL & ACOUSTIC COGeneral Contractor707/08/2026
DEVO FIRE PROTECTION INCFire Protection207/08/2026
TESTERMAN PLBG & HTG INCPlumbing207/08/2026
CORE ELECTRIC MEP INDS LLElectrical103/22/2026
NEWGRANGE ELECTRIC, INCElectrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor109/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524501/21/2026
Building Lifecycle
All (119)Filed (9)Permit Issued (10)Signed Off (6)Inspection (6)Objection (58)Special Inspection (30)
09/21/2026
Permit issued — Solar
B01458191-I1-SL
07/16/2026
Signed off — Alteration
plumbing
B00709460-I1
05/22/2026
Signed off — Alteration
Proposed interior renovation to a two story + basement residential use building.
B01366302-I1
05/20/2026
Permit issued — General Construction
B01366302-I1-GC
03/10/2026
Filed — Alteration
Proposed interior renovation to a two story + basement residential use building.
B01366302-I1
03/04/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
03/04/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
03/02/2026
Special inspection requirement — Final
Shahrish Shuvo
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/30/2026
Signed off — Alteration
Installation of Bulkhead as per plans filed herewith, no change to use or occupancy.
B08047206-I1
01/23/2026
Permit issued — General Construction
B08047206-I1-GC
01/21/2026
Filed — Alteration
plumbing
B00709460-P1
01/07/2026
Signed off — Alteration
Installation of new sprinkler fixtures in relation to renovation, as per plans filed herewith. No change use egress or occupancy, as per plans filed herewith.
B00768933-I1
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
12/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/10/2025
Permit issued — Sprinklers
B00768933-I1-EW-SP
12/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/10/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
11/06/2025
Signed off — Alteration
Non-structural demolition work & interior renovation at all occupiable floors as per plans filed herewith. No change to use, egress, or occupancy.
B00705025-I1
11/03/2025
Signed off — Alteration
B00709482-I1
10/21/2025
Permit issued — Plumbing
B00709460-I1-PL
06/26/2025
Permit issued — Sprinklers
B00768933-I1-EW-SP
06/26/2025
Permit issued — Mechanical Systems
B00709482-I1-MS
10/11/2023
Objection raised — Structural
10/11/2023
Objection raised — Other
10/11/2023
Objection raised — Structural
10/11/2023
Objection raised — Fire_Protection
10/03/2023
Filed — Alteration
Demolition of existing deck and construction of new deck. No change to use, egress or occupancy.
B00780099-I1
08/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
08/11/2023
Special inspection requirement — Final
Shahrish Shuvo
08/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
08/11/2023
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
08/11/2023
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
08/11/2023
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
08/11/2023
Special inspection requirement — Masonry
Shahrish Shuvo
08/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
08/11/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahrish Shuvo
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/08/2023
Filed — Alteration
Installation of Bulkhead as per plans filed herewith, no change to use or occupancy.
B08047206-P1
07/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/29/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
07/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2023
Special inspection requirement — Masonry
07/29/2023
Special inspection requirement — Energy Code Compliance Inspections
07/29/2023
Special inspection requirement — Final
07/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
07/29/2023
Special inspection requirement — Air barrier — testing
07/29/2023
Special inspection requirement — Insulation placement and R values
07/29/2023
Special inspection requirement — Air barrier - visual inspection
07/13/2023
Special inspection requirement — Final
02/23/2023
Permit issued — General Construction
B00705025-I1-GC
01/25/2023
Filed — Alteration
Installation of Bulkhead as per plans filed herewith, no change to use or occupancy.
B08047206-I1
01/18/2023
Objection resolved — Addressed
01/18/2023
Objection resolved — Addressed
01/18/2023
Objection resolved — Addressed
01/18/2023
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2023
Objection resolved — Addressed
01/17/2023
Objection resolved — Addressed
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedBROOKLYN SOLARWORKS LLC09/21/2026
DOB NOWGeneral ConstructionSigned-offC&M DRYWALL & ACOUSTIC CO05/20/2026
DOB NOWGeneral ConstructionSigned-offC&M DRYWALL & ACOUSTIC CO01/23/2026
DOB NOWSprinklersSigned-offDEVO FIRE PROTECTION INC12/10/2025
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC10/21/2025
DOB NOWSprinklersSigned-offDEVO FIRE PROTECTION INC06/26/2025
DOB NOWMechanical SystemsSigned-offC&M DRYWALL & ACOUSTIC CO06/26/2025
DOB NOWGeneral ConstructionSigned-offC&M DRYWALL & ACOUSTIC CO02/23/2023
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC11/22/2022
DOB NOWGeneral ConstructionSigned-offC&M DRYWALL & ACOUSTIC CO07/29/2022
1 project · most recent 01/21/2026
Water/Sanitary
FiledStatusContractorScope
01/21/2026Signed-offTESTERMAN PLBG & HTG INCWater/Sanitary
4 projects · most recent 09/15/2026
General Wiring Lighting
FiledStatusContractorScope
09/15/2026Permit IssuedBrooklyn Solar Electric—
05/24/2026CompleteCORE ELECTRIC MEP INDS LLGeneral Wiring, Lighting
04/12/2023CompleteNEWGRANGE ELECTRIC, INC2 meters, 2 new_meters
04/28/2022CompleteAAA'S ELECTL CONTG CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/10/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
03/04/2026Lighting controlsShahrish Shuvoenergy_progress
03/04/2026Interior lighting powerShahrish Shuvoenergy_progress
03/02/2026FinalShahrish Shuvoprogress
02/27/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
01/07/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/11/2023Energy Code Compliance InspectionsShahrish Shuvoprogress
08/11/2023FinalShahrish Shuvoprogress
08/11/2023Fire-Resistance Rated ConstructionShahrish Shuvoprogress
08/11/2023Air barrier — testing Shahrish Shuvoenergy_progress
08/11/2023Air barrier - visual inspectionShahrish Shuvoenergy_progress
08/11/2023Insulation placement and R valuesShahrish Shuvoenergy_progress
08/11/2023MasonryShahrish Shuvospecial
08/11/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
08/11/2023Construction Operations Influencing Adjacent StructuresShahrish Shuvospecial
08/11/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/29/2023Structural Stability – Alterations of existing buildings—special
07/29/2023Construction Operations Influencing Adjacent Structures—special
07/29/2023Fire-Resistant Penetrations and Joints—special
07/29/2023Masonry—special
07/29/2023Energy Code Compliance Inspections—progress
07/29/2023Final—progress
07/29/2023Fire-Resistance Rated Construction—progress
07/29/2023Air barrier — testing —energy_progress
07/29/2023Insulation placement and R values—energy_progress
07/29/2023Air barrier - visual inspection—energy_progress
Latest 25 of 43.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/30/2026B00705025-I1Request digital key ↗
08/29/2026B00709482-I1Request digital key ↗
08/28/2026B00768933-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B08047206-I1Open ↗
08/13/2026B08047206-P1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/30/2026B00705025-I1Open ↗
08/27/2026B08047206-P1Open ↗
08/27/2026B08047206-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B08047206-I1Open ↗
08/31/2026B08047206-I1Open ↗
08/29/2026B01366302-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026B08047206-I1Open ↗
08/28/2026B00709460-P1Open ↗
08/22/2026B00709482-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/30/2026B00705025-I1Open ↗
08/27/2026B08047206-P1Open ↗
08/27/2026B08047206-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/30/2026B00705025-I1Open ↗
08/13/2026B00709482-I1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026B08047206-P1Open ↗
08/13/2026B08047206-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B08047206-P1Open ↗
08/13/2026B08047206-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B08047206-P1Open ↗
08/13/2026B08047206-I1Open ↗