← Back
Primarily 4 family with 1 store or office
6901 3 AVENUE
BROOKLYN · BIN 3145672
💬 Discuss this project
1920Year Built
3Stories
S4Building Class
R6BZoning
4,950 sfGross Floor Area
5Units
Rent Stabilized65 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 6901 LLC · 2,643 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Roof1p · 1 filing · 11 docs
Floor 37p · 1 filing · 14 docs
Floor 27p · 1 filing · 14 docs
Floor 16p · 1 filing · 14 docs
Cellar7p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AXIUM CONSTRUCTION3507/08/2026
AXION MANAGEMENT LLC503/22/2026
6901 LLC303/22/2026
6901 3AVE203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2017$900K—CIRCLES BAY RIDGE REALTY CORP. → 6901 LLC$182/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO HUJI204/22/2024
SCOTT LASKY ARCHITECT202/08/2024
CELIN MUNOZ CONSULTING ENGINEER, PC211/29/2022
ENTHINK ENGINEERS LLC111/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CDEM403/21/2026
LOUIS STRIAR403/21/2026
DOMANI CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AXIUM CONSTRUCTION CORPGeneral Contractor1307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
RIDGE CONTRACTING CORPGeneral Contractor403/21/2026
SIGNSTAR NYCScaffold207/08/2026
GOOD-WILL MECHANICAL CORP.General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEMERARA ENGINEERING, PLL4248102/08/2024
METRIC CONSULTING AND INS1803211/29/2022
Building Lifecycle
All (117)Filed (7)Permit Issued (15)Signed Off (5)Violation (60)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
10/11/2024
Permit issued — Structural
B07997457-I1-GC
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2024
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - SCHOOL OF ROCK - NO CHANGE OF USE, EGRESS, OR OCCUPANCY
B01030618-I1
05/24/2024
Signed off — Alteration
B01030621-I1
05/22/2024
Signed off — Alteration
Interior Fit Out of existing 1st Floor Commercial Space as per Plans. No change in use, occupancy or egress.
B00994455-I1
05/20/2024
Signed off — Alteration
Interior Fit Out of existing 1st Floor Commercial Space as per Plans. No change in use, occupancy or egress.
B00994455-S1
04/25/2024
Permit issued — Sign
B01030618-I1-SG
04/25/2024
Permit issued — Sign
B01030621-I1-SG
04/22/2024
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - SCHOOL OF ROCK - NO CHANGE OF USE, EGRESS, OR OCCUPANCY
B01030618-I1
04/22/2024
Filed — Alteration
B01030621-I1
04/09/2024
Permit issued — General Construction
B00994455-I1-GC
04/04/2024
Special inspection requirement — Final
Ryan Hung
04/03/2024
Violation issued (HPD, open)
A
02/15/2024
Permit issued — Mechanical Systems
B00994455-S1-MS
02/08/2024
Filed — Alteration
Interior Fit Out of existing 1st Floor Commercial Space as per Plans. No change in use, occupancy or egress.
B00994455-S1
02/07/2024
Permit issued — General Construction
B00994455-I1-GC
02/07/2024
Special inspection requirement — Shutoff dampers
Oscar Walters Jr
02/07/2024
Special inspection requirement — Maintenance information
Oscar Walters Jr
02/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
Oscar Walters Jr
02/06/2024
Special inspection requirement — Ventilation and air distribution system
Oscar Walters Jr
02/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Oscar Walters Jr
02/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Oscar Walters Jr
01/30/2024
Filed — Alteration
Interior Fit Out of existing 1st Floor Commercial Space as per Plans. No change in use, occupancy or egress.
B00994455-I1
01/30/2024
Signed off — Alteration
B08044608-I1
01/30/2024
Special inspection requirement — Interior lighting power
Oscar Walters Jr
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Oscar Walters Jr
01/30/2024
Special inspection requirement — Lighting controls
Oscar Walters Jr
01/25/2024
Special inspection requirement — Final
Oscar Walters Jr
01/25/2024
Special inspection requirement — Mechanical Systems
Oscar Walters Jr
01/23/2024
Special inspection requirement — Final
Oscar Walters Jr
11/20/2023
Permit issued — Sidewalk Shed
B08044608-I1-SH
11/17/2023
Violation issued (HPD, open)
I
07/07/2023
Permit issued — Structural
B07997457-I1-ST
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2023
Permit issued — Foundation
B07997457-I1-GC
06/12/2023
Permit issued — Construction Fence
B00141645-I1-FN
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Violation issued (HPD, open)
A
11/30/2022
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Masonry
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
11/30/2022
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
11/29/2022
Filed — Alteration
new cellar slab and footings for steel columns. New first floor and partial 2nd floor plus stair framing.
B07997457-P1
11/29/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
11/29/2022
Special inspection requirement — Masonry
SAMI HAJJAR P.E
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAXIUM CONSTRUCTION10/11/2024
DOB NOWSignSigned-offSIGNSTAR NYC04/25/2024
DOB NOWSignSigned-offSIGNSTAR NYC04/25/2024
DOB NOWGeneral ConstructionSigned-offRIDGE CONTRACTING CORP04/09/2024
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL02/15/2024
DOB NOWGeneral ConstructionSigned-offRIDGE CONTRACTING CORP02/07/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/20/2023
DOB NOWStructuralPermit IssuedAXIUM CONSTRUCTION07/07/2023
DOB NOWFoundationPermit IssuedAXIUM CONSTRUCTION06/12/2023
DOB NOWConstruction FencePermit IssuedAXIUM CONSTRUCTION06/12/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/23/2022
DOB NOWFoundationPermit IssuedAXIUM CONSTRUCTION09/16/2022
DOB NOWFoundationPermit IssuedAXIUM CONSTRUCTION09/16/2022
DOB NOWFoundationPermit IssuedAXIUM CONSTRUCTION09/16/2022
DOB NOWConstruction FencePermit IssuedAXIUM CONSTRUCTION08/12/2022
BISOTISSUEDAXIUM CONSTRUCTION CORP08/12/2025
BISMHISSUEDAXIUM CONSTRUCTION CORP10/15/2024
BISPLISSUEDA&H EXPRESS PLBG&HTG CORP05/02/2024
BISOTISSUEDAXIUM CONSTRUCTION CORP12/15/2023
BISPLISSUEDA&H EXPRESS PLBG&HTG CORP05/01/2023
BISOTISSUEDAXIUM CONSTRUCTION CORP12/12/2022
BISOTISSUEDAXIUM CONSTRUCTION CORP12/23/2021
BISOTISSUEDAXIUM CONSTRUCTION CORP12/08/2020
BISOTISSUEDAXIUM CONSTRUCTION CORP06/26/2020
BISFPISSUEDACTIVE FIRE EXT CO INC03/03/2000
BISOTISSUEDCIRCLE CAFE11/29/1993
6 projects · most recent 02/24/2026
General Wiring
FiledStatusContractorScope
02/24/2026Permit IssuedALL PURPOSE ELECTRIC CORPGeneral Wiring
04/29/2024CompletePROFF ELECTRICAL LLC—
04/29/2024CompletePROFF ELECTRICAL LLC—
01/30/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
12/05/2022CompleteBOROWIDE ELECT'L CONTR'S—
03/29/2020Permit IssuedALL PURPOSE ELECTRIC CORP—
1 project · most recent 11/29/2022
Steel Masonry
FiledStatusContractorScope
11/29/2022Permit IssuedAXIUM CONSTRUCTION CORPSteel, Masonry
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
04/04/2024FinalRyan Hungprogress
02/07/2024Shutoff dampersOscar Walters Jrenergy_progress
02/07/2024Maintenance informationOscar Walters Jrenergy_progress
02/06/2024HVAC-R and service water heating system controlsOscar Walters Jrenergy_progress
02/06/2024Ventilation and air distribution systemOscar Walters Jrenergy_progress
02/06/2024HVAC-R and service water heating equipmentOscar Walters Jrenergy_progress
02/06/2024HVAC-R and service water piping design and insulationOscar Walters Jrenergy_progress
01/30/2024Interior lighting powerOscar Walters Jrenergy_progress
01/30/2024Energy Code Compliance InspectionsOscar Walters Jrprogress
01/30/2024Lighting controlsOscar Walters Jrenergy_progress
01/25/2024FinalOscar Walters Jrprogress
01/25/2024Mechanical SystemsOscar Walters Jrspecial
01/23/2024FinalOscar Walters Jrprogress
11/30/2022Footing and FoundationSAMI HAJJAR P.Eprogress
11/30/2022FinalSAMI HAJJAR P.Eprogress
11/30/2022Structural Wood FrameSAMI HAJJAR P.Eprogress
11/30/2022Structural Steel - WeldingSAMI HAJJAR P.Especial
11/30/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
11/30/2022Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
11/30/2022Post-installed AnchorsSAMI HAJJAR P.Especial
11/30/2022MasonrySAMI HAJJAR P.Especial
11/30/2022Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
11/30/2022Structural Cold-Formed SteelSAMI HAJJAR P.Especial
11/30/2022Structural Steel - DetailsSAMI HAJJAR P.Especial
11/29/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
School Of RockEducation—
Project B01030618 Alteration · LOC Issued · 04/22/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B08044608-I1Request digital key ↗
08/28/2026B07997457-P1Request digital key ↗
08/28/2026B07997457-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION13
01/28/2026321929106Open ↗
01/22/2026321929106Open ↗
01/08/2026321929106Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION3
10/15/2024321929106Open ↗
05/01/2023321929106Open ↗
10/08/2019321929106Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/17/2019321929106Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature9
09/26/2026B07997457-P1Open ↗
09/26/2026B07997457-P1Open ↗
08/28/2026B00994455-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B07997457-P1Open ↗
08/28/2026B07997457-I1Open ↗
08/26/2026B00994455-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/26/2026B07997457-P1Open ↗
09/26/2026B07997457-P1Open ↗
08/28/2026B00994455-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/31/2019321929106Open ↗
03/08/2019321929106Open ↗
03/08/2019321929106Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/08/2019321929106Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/08/2019321929106Open ↗
▸BISSCHEDULE B - PLUMBING1
08/04/2025321929106Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B07997457-I1Open ↗
08/28/2026B07997457-P1Open ↗
08/26/2026B00994455-S1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/14/2023321929106Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/31/2019321929106Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/14/2023321929106Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/08/2019321929106Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
01/28/2026321929106Open ↗
11/29/2023321929106Open ↗
12/06/2022321929106Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
03/08/2019321929106Open ↗