← Back
Primarily 2 family with 1 store or office
6905 5 AVENUE
BROOKLYN · BIN 3145779
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6BZoning
3,670 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,616 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 11 docs
Floor 31p · 1 filing · 12 docs
Floor 21p · 2 filings · 20 docs
Floor 12p · 1 filing · 8 docs
Cellar4p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DARCOM CONSULTANTS LLC205/02/2024
ASHRAF CORP110/02/2023
G ENGINEERING PC1007/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO2003/21/2026
MA DESIGNS NYC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing207/08/2026
ERGO DEVELOPMENT & MGMN'TGeneral Contractor107/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
KATAN P & H INCPlumbing107/08/2026
KWARTENG, ISAACElectrical103/21/2026
PASQUALE QUARATINO INCPlumbing107/08/2026
MAVROGIANNIS, CONSTANTINOSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500110/02/2023
G ENGINEERING PC7778406/07/2023
Building Lifecycle
All (58)Filed (13)Permit Issued (7)Signed Off (4)Violation (18)Inspection (8)Special Inspection (8)
02/18/2026
Violation issued (FDNY_ORDER, closed)
02/18/2026
Violation issued (FDNY_ORDER, closed)
12/09/2024
Signed off — Alteration
FILING TO INSTALL NEW COMMERCIAL HOOD, DUCT, AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00936066-S1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2024
Filed — Alteration
FILING TO INSTALL NEW COMMERCIAL HOOD, DUCT, AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00936066-P1
04/12/2024
Permit issued — Plumbing
B00936066-S1-PL
12/28/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/08/2023
Permit issued — Mechanical Systems
B00936066-I1-MS
11/27/2023
Permit issued — Plumbing
B00936066-S1-PL
10/02/2023
Filed — Alteration
FILING TO INSTALL NEW COMMERCIAL HOOD, DUCT, AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00936066-S1
10/02/2023
Filed — Alteration
FILING TO INSTALL NEW COMMERCIAL HOOD, DUCT, AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00936066-I1
09/19/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
09/19/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
08/18/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026808-I1
08/17/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026810-I1
08/17/2023
Signed off — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026813-I1
08/01/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/21/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026810-P3
07/21/2023
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026813-P2
06/09/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/07/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026808-P5
05/22/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/16/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026808-P2
05/16/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026810-P2
05/16/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
05/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
05/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/06/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026810-P1
03/07/2023
Permit issued — General Construction
B08026808-I1-GC
01/27/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026808-P1
01/27/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
01/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
01/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
10/28/2022
Permit issued — General Construction
B08026808-I1-GC
10/28/2022
Permit issued — Boiler Equipment
B08026813-I1-BE
10/28/2022
Permit issued — Plumbing
B08026810-I1-PL
10/25/2022
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026808-I1
10/25/2022
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026810-I1
10/25/2022
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08026813-I1
10/03/2012
Violation issued (HPD, closed)
C
10/03/2012
Violation issued (HPD, open)
C
12/28/2005
Violation issued (ECB, closed)
Boilers
12/28/2005
Violation issued (ECB, closed)
Boilers
12/28/2005
Violation issued (ECB, closed)
Boilers
06/03/2004
Violation issued (ECB, closed)
Boilers
06/03/2004
Violation issued (ECB, closed)
Boilers
06/03/2004
Violation issued (ECB, closed)
Boilers
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPASQUALE QUARATINO INC04/12/2024
DOB NOWMechanical SystemsPermit IssuedERGO DEVELOPMENT MGMNT12/08/2023
DOB NOWPlumbingSigned-offKATAN P & H INC11/27/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC03/07/2023
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC10/28/2022
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC10/28/2022
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/28/2022
1 project · most recent 05/02/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/02/2024Signed-offPASQUALE QUARATINO INCGas, Water/Sanitary
1 project · most recent 05/23/2023
General Wiring
FiledStatusContractorScope
05/23/2023CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/01/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/09/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/22/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/19/2023Mechanical SystemsJay Kavispecial
09/19/2023FinalBRIAN MCCAFFREYprogress
05/16/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
05/16/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
05/16/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
01/27/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
01/27/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
01/27/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026B08026813-P2Request digital key ↗
08/28/2026B08026813-I1Request digital key ↗
08/28/2026B08026808-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026B08026813-I1Open ↗
08/28/2026B08026813-P2Open ↗
08/28/2026B08026808-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B08026808-P2Open ↗
08/27/2026B08026808-P1Open ↗
08/23/2026B00936066-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B08026808-P2Open ↗
08/27/2026B08026808-P1Open ↗
08/23/2026B00936066-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00936066-I1Open ↗
08/26/2026B00936066-S1Open ↗
08/26/2026B00936066-P1Open ↗