← Back
Walk-up apt, over six families with stores
691 10 AVENUE
MANHATTAN · BIN 1026992
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R8Zoning
9,725 sfGross Floor Area
22Units
Rent Stabilized55 Open Violations 51 unresolved · 4 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 691 TENTH, · 2,510 sf lot · 3.87 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 52p · 2 filings · 20 docs
Floor 41 filing · 11 docs
Floor 31 filing · 11 docs
Floor 21 filing · 11 docs
Floor 11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL ZONE CONSTRUCTION807/08/2026
KAJ NY CONSTRUCTION INC503/22/2026
691 TENTH,903/22/2026
ISKANDER103/22/2026
691 10TH103/22/2026
HOME DESIGN AND CO.103/22/2026
PROVEST103/21/2026
ULTRA HOLDING303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
SANDEEP KAUR203/21/2026
GAMILL ENGINEERING, PC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOYD, JOHNElectrical303/21/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
SCHORR, NATHANElectrical303/21/2026
ALL ZONE CONSTRUCTION INCGeneral Contractor207/08/2026
EVERLAST CUSTOM CONSTRUCTIONGeneral Contractor203/21/2026
FIU CORP DBA FIU ELECTRICElectrical103/22/2026
LIQUID PLBG & HTNG SCS INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AP PROFESSIONAL ENGINEERI5974107/05/2022
GAMILL ENGINEERING, P.C.1773712/14/2021
Building Lifecycle
All (100)Filed (10)Permit Issued (5)Signed Off (2)Violation (60)Inspection (3)Special Inspection (20)
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Quality of Life
04/02/2026
Violation issued (ECB, open)
Construction
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, closed)
A
09/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/01/2022
Inspection — Pass-Final Scaffold Non-Directive 14
Pass
View inspection ↗
08/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2022
Violation issued (ECB, closed)
Construction
07/22/2022
Permit issued — Supported Scaffold
M00747031-S1-SF
07/21/2022
Filed — Alteration
FACADE REPAIR WHICH INCLUDES LINTEL REPLACEMENT AS PER PLANS. NO CHANGEIN BUILDING USE, OCCUPANCY OR EGRESS.
M00747031-S1
07/13/2022
Permit issued — General Construction
M00747031-I1-GC
07/05/2022
Filed — Alteration
FACADE REPAIR WHICH INCLUDES LINTEL REPLACEMENT AS PER PLANS. NO CHANGEIN BUILDING USE, OCCUPANCY OR EGRESS.
M00747031-I1
06/14/2022
Special inspection requirement — Masonry
GURVINDER SINGH
05/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GURVINDER SINGH
05/11/2022
Permit issued — Sidewalk Shed
M00735082-I1-SH
05/10/2022
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS, SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00735082-I1
03/09/2022
Violation issued (HPD, closed)
C
02/15/2022
Violation issued (HPD, closed)
A
02/09/2022
Signed off — Alteration
REPAIR FIRE DAMAGE TO WALLS, FLOOR AND CEILING IN APARTMENTS 2, 4, 5, 6, 10, 15, & 19. REPLACE BROKEN WINDOWS OPEN TO ELEMENTS IN APTS 2, 4, 5, & 6 IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATION.
M00483903-I1
02/09/2022
Signed off — Alteration
REMOVE/REPLACE KITCHEN AND BATHROOM FIXTURES AS INDICATED ON PLANS TO PERFORM REPAIRS IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATIONS. REPLACE GAS RISERS TO GAS RANGES FOR RESIDENTIAL UNITS. NO CHANGES TO USE, OCCUPANCY, OR EGRESS.
M00483997-I1
01/19/2022
Violation issued (HPD, open)
B
01/19/2022
Violation issued (HPD, open)
B
01/19/2022
Violation issued (HPD, open)
B
01/19/2022
Violation issued (HPD, open)
B
01/19/2022
Violation issued (HPD, open)
B
01/19/2022
Violation issued (HPD, open)
B
12/16/2021
Special inspection requirement — Energy Code Compliance Inspections
JACK GAMILL
12/16/2021
Special inspection requirement — Lighting controls
JACK GAMILL
12/16/2021
Special inspection requirement — Lighting in dwelling units
JACK GAMILL
12/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
12/16/2021
Special inspection requirement — Final
JACK GAMILL
12/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
12/14/2021
Filed — Alteration
REMOVE/REPLACE KITCHEN AND BATHROOM FIXTURES AS INDICATED ON PLANS TO PERFORM REPAIRS IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATIONS. REPLACE GAS RISERS TO GAS RANGES FOR RESIDENTIAL UNITS. NO CHANGES TO USE, OCCUPANCY, OR EGRESS.
M00483997-P3
12/14/2021
Filed — Alteration
REPAIR FIRE DAMAGE TO WALLS, FLOOR AND CEILING IN APARTMENTS 2, 4, 5, 6, 10, 15, & 19. REPLACE BROKEN WINDOWS OPEN TO ELEMENTS IN APTS 2, 4, 5, & 6 IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATION.
M00483903-P2
12/14/2021
Special inspection requirement — Lighting in dwelling units
JACK GAMILL
12/14/2021
Special inspection requirement — Lighting controls
JACK GAMILL
12/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
12/14/2021
Special inspection requirement — Energy Code Compliance Inspections
JACK GAMILL
12/14/2021
Special inspection requirement — Final
JACK GAMILL
12/13/2021
Filed — Alteration
REMOVE/REPLACE KITCHEN AND BATHROOM FIXTURES AS INDICATED ON PLANS TO PERFORM REPAIRS IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATIONS. REPLACE GAS RISERS TO GAS RANGES FOR RESIDENTIAL UNITS. NO CHANGES TO USE, OCCUPANCY, OR EGRESS.
M00483997-P2
12/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
12/10/2021
Filed — Alteration
REPAIR FIRE DAMAGE TO WALLS, FLOOR AND CEILING IN APARTMENTS 2, 4, 5, 6, 10, 15, & 19. REPLACE BROKEN WINDOWS OPEN TO ELEMENTS IN APTS 2, 4, 5, & 6 IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATION.
M00483903-P1
12/10/2021
Filed — Alteration
REMOVE/REPLACE KITCHEN AND BATHROOM FIXTURES AS INDICATED ON PLANS TO PERFORM REPAIRS IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATIONS. REPLACE GAS RISERS TO GAS RANGES FOR RESIDENTIAL UNITS. NO CHANGES TO USE, OCCUPANCY, OR EGRESS.
M00483997-P1
12/09/2021
Special inspection requirement — Final
JACK GAMILL
12/09/2021
Special inspection requirement — Lighting in dwelling units
JACK GAMILL
12/09/2021
Special inspection requirement — Energy Code Compliance Inspections
JACK GAMILL
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
12/09/2021
Special inspection requirement — Lighting controls
JACK GAMILL
09/10/2021
Violation issued (ECB, closed)
Unknown
09/10/2021
Violation issued (ECB, closed)
Construction
09/10/2021
Violation issued (ECB, closed)
Construction
09/10/2021
Violation issued (ECB, closed)
Unknown
07/20/2021
Violation issued (HPD, open)
C
04/01/2021
Violation issued (HPD, closed)
A
03/22/2021
Permit issued — Plumbing
M00483997-I1-PL
03/18/2021
Permit issued — General Construction
M00483903-I1-GC
03/11/2021
Filed — Alteration
REPAIR FIRE DAMAGE TO WALLS, FLOOR AND CEILING IN APARTMENTS 2, 4, 5, 6, 10, 15, & 19. REPLACE BROKEN WINDOWS OPEN TO ELEMENTS IN APTS 2, 4, 5, & 6 IN ORDER TO REMOVE PARTIAL VACATE ORDER AND CURE VIOLATION.
M00483903-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedALL ZONE CONSTRUCTION INC07/22/2022
DOB NOWGeneral ConstructionSigned-offALL ZONE CONSTRUCTION INC07/13/2022
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC05/11/2022
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN03/22/2021
DOB NOWGeneral ConstructionSigned-offEVERLAST CUSTOM CONSTRUCT03/18/2021
BISOTISSUEDMARAMAR CORP01/26/2015
BISMHISSUEDWORLD HUB CONSTRUCTION IN02/26/2014
BISPLISSUEDMARINO PLBG AND HTG, INC09/06/2013
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/23/2013
BISOTISSUEDWORLD HUB CONSTRUCTION IN08/22/2013
BISEQISSUEDWORLD HUB CONSTRUCTION IN08/21/2013
BISFPISSUEDFIRE COMMAND CO, INC08/12/2010
BISOTISSUEDYF2 CONSTRUCTION INC04/13/2010
BISPLISSUEDLUVER PLBG & HTG INC05/23/1996
BISFPISSUEDIDEAL FIRE CONTROL04/10/1996
BISOTRE-ISSUEDN/A11/09/1990
5 projects · most recent 12/02/2021
General Wiring
FiledStatusContractorScope
12/02/2021CompleteVTL ELECTRIC CO., CORPGeneral Wiring
02/17/2021CompleteVTL ELECTRIC CO., CORPGeneral Wiring
12/01/2020CompleteVTL ELECTRIC CO., CORPGeneral Wiring
10/26/2020CompleteVTL ELECTRIC CO., CORPGeneral Wiring
09/15/2020Permit IssuedFIU CORP DBA FIU ELECTRICGeneral Wiring
1 project · most recent 05/10/2022
Sidewalk Shed
FiledStatusContractorScope
05/10/2022Permit IssuedKAJ NY CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/01/2022Pass-Final Scaffold Non-Directive 14PassView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/14/2022MasonryGURVINDER SINGHspecial
05/27/2022Structural Stability – Alterations of existing buildingsGURVINDER SINGHspecial
12/16/2021Energy Code Compliance InspectionsJACK GAMILLprogress
12/16/2021Lighting controlsJACK GAMILLenergy_progress
12/16/2021Lighting in dwelling unitsJACK GAMILLenergy_progress
12/16/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
12/16/2021FinalJACK GAMILLprogress
12/16/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
12/14/2021Lighting in dwelling unitsJACK GAMILLenergy_progress
12/14/2021Lighting controlsJACK GAMILLenergy_progress
12/14/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
12/14/2021Energy Code Compliance InspectionsJACK GAMILLprogress
12/14/2021FinalJACK GAMILLprogress
12/13/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
12/09/2021FinalJACK GAMILLprogress
12/09/2021Lighting in dwelling unitsJACK GAMILLenergy_progress
12/09/2021Energy Code Compliance InspectionsJACK GAMILLprogress
12/09/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
12/09/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
12/09/2021Lighting controlsJACK GAMILLenergy_progress
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00483903-I1Request digital key ↗
09/03/2026M00483903-P1Request digital key ↗
09/03/2026M00483903-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
02/03/2015122255308Open ↗
02/27/2014121621138Open ↗
09/16/2013121621138Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
01/31/2015122255308Open ↗
10/31/2013121621138Open ↗
06/25/2013121621138Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00747031-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026M00483903-I1Open ↗
09/01/2026M00483903-I1Open ↗
09/01/2026M00483903-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00483903-I1Open ↗
09/03/2026M00483903-P1Open ↗
09/03/2026M00483903-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
01/31/2015122255308Open ↗
05/22/2014121621138Open ↗
12/30/2013121750747Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00483903-I1Open ↗
08/23/2026M00747031-I1Open ↗
08/23/2026M00747031-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/31/2015122255308Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/31/2015122255308Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE5
02/05/2014121621138Open ↗
01/23/2014121621138Open ↗
12/16/2013121621138Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/31/2013121621138Open ↗
06/25/2013121621138Open ↗
07/17/2010120412026Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/25/2013121621138Open ↗
▸Safety & Tenant Protection15
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist10
09/03/2026M00483903-I1Open ↗
09/03/2026M00483903-P1Open ↗
09/03/2026M00483903-P2Open ↗
Showing 3 of 10 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
08/08/2013121621138Open ↗
04/09/2010120306258Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
02/03/2015122255308Open ↗
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
08/18/2010120412026Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M00747031-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00483903-I1Open ↗
09/03/2026M00483903-P1Open ↗
09/03/2026M00483903-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/31/2015122255308Open ↗
06/25/2013121621138Open ↗
01/31/2015122255308Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/17/2010120412026Open ↗
04/01/2010120306258Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/31/2015122255308Open ↗
05/22/2014121621138Open ↗
06/25/2013121621138Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/22/2014121621138Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00483903-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/22/2014121621138Open ↗
12/30/2013121750747Open ↗
06/03/2010120306258Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
06/25/2013121621138Open ↗
07/17/2010120412026Open ↗
04/01/2010120306258Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
02/03/2015122255308Open ↗
05/22/2014121621138Open ↗
12/30/2013121750747Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
01/31/2015122255308Open ↗
06/25/2013121621138Open ↗
07/17/2010120412026Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/03/2010120306258Open ↗