← Back
BuildNYC
Nursing home
Hamilton Park Nursing and Rehabilitation Center
691 92ND STREET · Name © OpenStreetMap contributors · Bay Ridge · BIN 3388853
💬 Discuss this project
1988Year Built
6Stories
I6Building Class
R4BZoning
161,669 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Nursing home · 32,017 sf lot · 5.05 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHamilton Park Rehab Center1 filing · 9 docs
PenthouseHamilton Park Rehab Center1 filing · 9 docs
Floor 1The Allure Group2p · 1 filing · 3 docs
CellarAllure Group1 filing · 3 docs
Sub-BasementThe Allure Group3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hamilton Park Realty1903/21/2026
Allure Group707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Advanced Engineering & Inspection PLL102/02/2022
WSP111/11/2020
JRS Consulting110/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brookstone DevelopersGeneral Contractor307/08/2026
Green Star Electl ContElectrical103/21/2026
Tristate Fire SprinklersFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519102/02/2022
Aeg1846211/11/2020
Building Lifecycle
All (44)Filed (3)Permit Issued (3)Violation (22)Objection (6)Special Inspection (10)
03/03/2025
Violation issued (FDNY_NOV, closed)
11/03/2022
Permit issued — Plumbing
B00652724-I1-EW-SP
02/02/2022
Filed — Alteration
Filing to install new fire sprinkler water service and re-routing sprinkler piping on the cellar floor.
B00652724-I1
02/01/2022
Violation issued (ECB, closed)
Construction
12/31/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/22/2021
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
11/08/2021
Permit issued — Structural
B00412230-I1-ST
11/12/2020
Permit issued — Structural
B00412230-I1-ST
11/12/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yousuf Tai
11/11/2020
Filed — Alteration
To document and provide repair details of the areas deteriorated by the exposure to chloride on the parking garages.
B00412230-I1
11/04/2020
Objection raised — Scope
11/04/2020
Objection resolved — Addressed
11/04/2020
Objection raised — Fire_Protection
11/04/2020
Objection resolved — Addressed
11/04/2020
Objection raised — Inspections
11/04/2020
Objection resolved — Addressed
10/30/2020
Filed — Alteration
Replace existing Gas evaporator chiller with 2 new electrical crew chillers, reusing existing piping,
B00420689-I1
10/29/2020
Special inspection requirement — Energy Code Compliance Inspections
Yousuf Tai
10/29/2020
Special inspection requirement — Maintenance information
Yousuf Tai
10/29/2020
Special inspection requirement — HVAC insulation and sealing
Yousuf Tai
10/29/2020
Special inspection requirement — HVAC and service water heating system controls
Yousuf Tai
10/29/2020
Special inspection requirement — HVAC and service water heating equipment
Yousuf Tai
10/28/2020
Special inspection requirement — Final
Yousuf Tai
10/28/2020
Special inspection requirement — Mechanical Systems
Yousuf Tai
09/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/16/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/16/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/16/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/16/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2010
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/16/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/12/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/15/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTristate Fire Sprinkler11/03/2022
DOB NOWStructuralPermit IssuedBrookstone Developers11/08/2021
DOB NOWStructuralPermit IssuedBrookstone Developers11/12/2020
BISMHISSUEDRC3 Electric11/21/2018
BISPLISSUEDBauer Mechancial07/13/2018
BISBLISSUEDG. Bauer07/13/2018
BISOTISSUEDAriston Chimney07/09/2018
BISPLISSUEDBedrock Plumbing & Heating03/23/2018
BISFPISSUEDLund Fire Products Co03/02/2017
BISOTISSUEDRC3 Electric01/06/2017
BISMHISSUEDRC3 Electric01/06/2017
BISPLISSUEDBedrock Plumbing & Heating12/12/2016
BISMHISSUEDRC3 Electric11/15/2016
BISOTISSUEDRC3 Electric11/14/2016
BISOTISSUEDRC3 Electric11/14/2016
BISFBISSUEDChampion Combustion03/07/2014
BISMHISSUEDAes NJ Cogen Co03/05/2014
BISOTISSUEDPark Premium Enterprises12/10/2013
BISPLISSUEDMillennium Mechanical Cont11/12/2013
BISSPISSUEDH.A.M. Fire Equipment07/02/2013
BISPLISSUEDMillennium Mechanical Cont06/10/2013
BISOTISSUEDPark Premium Enterprises12/11/2012
BISPLISSUEDHeadquarters Mechanical12/14/2011
BISOTISSUEDPark Premium Enterprises12/01/2011
BISOTISSUEDPark Premium Enterprises06/07/2011
1 project · most recent 10/30/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/30/2020——Air Conditioning Systems
Cooling
York YVAA0233BSV17BAVSXO 211 tons · Chiller ×2
1 project · most recent 02/02/2022
FiledStatusContractorScope
02/02/2022Permit IssuedTristate Fire Sprinkler—
1 project · most recent 02/02/2022
Water/Sanitary
FiledStatusContractorScope
02/02/2022——Water/Sanitary
1 project · most recent 01/16/2020
FiledStatusContractorScope
01/16/2020Permit IssuedTuxedo Electrical Contracting—
1 project · most recent 11/11/2020
Concrete
FiledStatusContractorScope
11/11/2020Permit IssuedBrookstone DevelopersConcrete
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/31/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/22/2021Sprinkler SystemsYounes Abouyaalaspecial
11/12/2020Fire-Resistant Penetrations and JointsYousuf Taispecial
10/29/2020Energy Code Compliance InspectionsYousuf Taiprogress
10/29/2020Maintenance informationYousuf Taienergy_progress
10/29/2020HVAC insulation and sealing Yousuf Taienergy_progress
10/29/2020HVAC and service water heating system controls Yousuf Taienergy_progress
10/29/2020HVAC and service water heating equipment Yousuf Taienergy_progress
10/28/2020FinalYousuf Taiprogress
10/28/2020Mechanical SystemsYousuf Taispecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hamilton Park Rehab CenterMedical / HealthcarePenthouse, Roof
Project B00420689 Alteration · Approved · 10/30/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026B00420689-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00412230-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/31/2026B00652724-I1Request digital key ↗
▸Applications & Permits46
▸BISWORK PERMIT APPLICATION29
11/26/2018321396609Open ↗
11/26/2018321396609Open ↗
07/13/2018340613900Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
12/14/2023320318517Open ↗
12/13/2023320318517Open ↗
06/22/2018340613900Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/28/2019321396645Open ↗
04/06/2018321396609Open ↗
11/30/2017321396609Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/31/2020320921767Open ↗
03/18/2019321396645Open ↗
03/03/2017321478021Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/03/2026B00420689-I1Open ↗
10/03/2026B00420689-I1Open ↗
10/03/2026B00420689-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026B00420689-I1Open ↗
09/02/2026B00412230-I1Open ↗
08/13/2026B00652724-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/11/2014320921767Open ↗
05/31/2013320863473Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/22/2018340613900Open ↗
06/11/2014320921767Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/03/2026B00420689-I1Open ↗
09/01/2026B00652724-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/22/2018340613900Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/22/2018340613900Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/31/2013320863473Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE6
05/11/2015320863473Open ↗
02/01/2014320863473Open ↗
02/01/2014320351551Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
06/22/2018340613900Open ↗
12/24/2013320863473Open ↗
05/31/2013320863473Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
03/20/2017321478021Open ↗
10/21/2016321396609Open ↗
10/18/2016321396645Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
06/22/2018340613900Open ↗
06/11/2014320921767Open ↗
06/10/2014320921767Open ↗
▸BISEQUIPMENT USE PERMITS2
03/18/2019321396645Open ↗
03/18/2019321396645Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
01/15/2014320863473Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/22/2016321396609Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/18/2019321396645Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/12/2011320351551Open ↗
06/09/2011320318517Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/10/2016321478021Open ↗
06/22/2016321396609Open ↗
06/22/2016321396645Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/12/2011320351551Open ↗
06/09/2011320318517Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00412230-I1Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/18/2019321396645Open ↗
03/11/2019321396609Open ↗
06/22/2016321396609Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/23/2024320318517Open ↗
12/23/2024320318517Open ↗
03/07/2022340613900Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
12/15/2011320351551Open ↗
09/12/2011320351551Open ↗
06/09/2011320318517Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
03/18/2019321396645Open ↗
03/11/2019321396609Open ↗
01/13/2014320351551Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/23/2024320318517Open ↗
03/07/2022340613900Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/22/2018340613900Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/24/2022340613900Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/06/2011320351551Open ↗
▸BISINTERIOR LIGHTING POWER1
12/23/2024320318517Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/23/2024320318517Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/23/2024320318517Open ↗
03/07/2022340613900Open ↗
06/22/2018340613900Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/15/2014320863473Open ↗
01/15/2014320863473Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/23/2024320318517Open ↗
▸BIS* EXIT SIGNS1
12/23/2024320318517Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/11/2019321396609Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/26/2024320318517Open ↗
03/25/2022340613900Open ↗
03/27/2020320921767Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/11/2014320921767Open ↗
05/31/2013320863473Open ↗
09/12/2011320351551Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
12/18/2024320318517Open ↗
▸BISFINAL1
12/23/2024320318517Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
12/24/2024320318517Open ↗
01/31/2020320921767Open ↗
11/20/2019320921767Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/23/2024320318517Open ↗
03/07/2022340613900Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET7
11/10/2016321478021Open ↗
06/22/2016321396609Open ↗
06/22/2016321396645Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
12/18/2024320318517Open ↗
09/25/2019340613900Open ↗
11/16/2018321396609Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
03/27/2020320921767Open ↗
01/31/2020320921767Open ↗
11/20/2019320921767Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/22/2018340613900Open ↗