← Back
Three families
6914 19 AVENUE
BROOKLYN · Bensonhurst · BIN 3156759
💬 Discuss this project
1945Year Built
3Stories
C0Building Class
R5Zoning
2,682 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,583 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 36p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN1704/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/25/2025$1.5M—— → —$559/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP712/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor104/09/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758712/05/2025
Building Lifecycle
All (52)Filed (7)Permit Issued (2)Signed Off (2)Violation (7)Inspection (4)Special Inspection (30)
02/19/2026
Signed off — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-I1
01/26/2026
Signed off — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-S1
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/05/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-P6
10/30/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-P5
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-P4
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-P1
09/22/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-P2
09/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
09/22/2025
Special inspection requirement — Mechanical Systems
Eric Sun
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/22/2025
Special inspection requirement — Final
Eric Sun
09/22/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
09/22/2025
Special inspection requirement — Fenestration areas
Eric Sun
09/22/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
09/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/22/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
09/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
09/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
09/22/2025
Special inspection requirement — Interior lighting power
Eric Sun
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2025
Permit issued — Plumbing
B01265532-S1-PL
08/11/2025
Permit issued — General Construction
B01265532-I1-GC-CX
08/08/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-I1
08/08/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01265532-S1
08/02/2025
Special inspection requirement — Interior lighting power
Eric Sun
08/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
08/02/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
08/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
08/02/2025
Special inspection requirement — Fenestration areas
Eric Sun
08/02/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
08/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
08/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
09/27/2007
Violation issued (HPD, closed)
B
09/27/2007
Violation issued (HPD, closed)
B
09/27/2007
Violation issued (HPD, closed)
C
09/27/2007
Violation issued (HPD, closed)
B
09/27/2007
Violation issued (HPD, closed)
B
08/30/2007
Violation issued (HPD, closed)
B
08/30/2007
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG08/11/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN08/11/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/08/2025Energy Code Compliance InspectionsEric Sunprogress
12/08/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/29/2025Energy Code Compliance InspectionsEric Sunprogress
10/29/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/30/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/30/2025Energy Code Compliance InspectionsEric Sunprogress
09/22/2025Fire-Resistance Rated ConstructionEric Sunprogress
09/22/2025Mechanical SystemsEric Sunspecial
09/22/2025Energy Code Compliance InspectionsEric Sunprogress
09/22/2025FinalEric Sunprogress
09/22/2025Fenestration air leakageEric Sunenergy_progress
09/22/2025Fenestration areasEric Sunenergy_progress
09/22/2025Insulation placement and R valuesEric Sunenergy_progress
09/22/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
09/22/2025Air barrier - visual inspectionEric Sunenergy_progress
09/22/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
09/22/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
09/22/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
09/22/2025Interior lighting powerEric Sunenergy_progress
09/22/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/22/2025Energy Code Compliance InspectionsEric Sunprogress
09/22/2025Fire-Resistant Penetrations and JointsEric Sunspecial
08/02/2025Interior lighting powerEric Sunenergy_progress
08/02/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
08/02/2025Fenestration air leakageEric Sunenergy_progress
Latest 25 of 36.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026B01265532-I1Request digital key ↗
08/19/2026B01265532-P6Request digital key ↗
08/19/2026B01265532-P5Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01265532-P2Open ↗
09/01/2026B01265532-P2Open ↗
09/01/2026B01265532-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01265532-P2Open ↗
09/01/2026B01265532-P2Open ↗
09/01/2026B01265532-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/19/2026B01265532-S1Open ↗
08/19/2026B01265532-I1Open ↗
08/19/2026B01265532-P6Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/19/2026B01265532-S1Open ↗
08/19/2026B01265532-I1Open ↗
08/19/2026B01265532-P1Open ↗
Showing 3 of 7 on file for this type