← Back
Two family converted from one family
692 STERLING PLACE
BROOKLYN · BIN 3031789
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R5BZoning
2,468 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,620 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOSTON CONSULTING GROUP403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AHT ENGINEERING PLLC206/11/2025
NY BUILDING ASSOCIATES INC106/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LANZO CONSTRUCTION & HOMEGeneral Contractor207/08/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
MAGUIRE, SHAWNElectrical103/21/2026
URBANO'S ELECTRICAL CORPElectrical103/22/2026
WEISS, NORMANElectrical103/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AHT ENGINEERING PLLC8836206/11/2025
NKM ENGINEERING PLLC6244106/03/2025
Building Lifecycle
All (94)Filed (3)Permit Issued (3)Signed Off (3)Violation (8)Objection (50)Special Inspection (27)
06/01/2026
Signed off — Alteration
APPLICATION FOR THE LEGALIZATION OF THE EXTENDED PORTION IN THE BASEMENT AND INTERIOR GENERAL CONSTRUCTION PARTITION WORK & HVAC MECHANICAL WORK WITHIN EXISTING 2-FAMILY DWELLING TO RESOLVE ECB VIOLATIONS #39147873Z AND #39147871P.
B01226879-I1
06/01/2026
Signed off — Alteration
APPLICATION FOR THE LEGALIZATION OF THE EXTENDED PORTION IN THE BASEMENT AND INTERIOR GENERAL CONSTRUCTION PARTITION WORK & HVAC MECHANICAL WORK WITHIN EXISTING 2-FAMILY DWELLING TO RESOLVE ECB VIOLATIONS #39147873Z AND #39147871P.
B01226879-S1
02/10/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01235394-I1
09/12/2025
Permit issued — General Construction
B01226879-I1-GC-CX
08/29/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/22/2025
Permit issued — Solar
B01235394-I1-SL
08/21/2025
Special inspection requirement — Air barrier - visual inspection
ABRAHAM TAWIL
08/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ABRAHAM TAWIL
08/21/2025
Special inspection requirement — Masonry
ABRAHAM TAWIL
08/21/2025
Special inspection requirement — Fenestration areas
ABRAHAM TAWIL
08/21/2025
Special inspection requirement — Fenestration air leakage
ABRAHAM TAWIL
08/21/2025
Special inspection requirement — Interior lighting power
ABRAHAM TAWIL
08/20/2025
Objection resolved — Addressed
08/20/2025
Objection resolved — Addressed
08/20/2025
Objection resolved — Addressed
08/20/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Cost
08/05/2025
Objection resolved — Addressed
07/23/2025
Permit issued — General Construction
B01226879-S1-GC
07/18/2025
Objection raised — Admin
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Zoning
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Structural
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Zoning
07/17/2025
Objection raised — Zoning
07/13/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/07/2025
Objection raised — Scope
06/25/2025
Objection raised — Scope
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection raised — Scope
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Zoning
06/20/2025
Objection raised — Energy
06/20/2025
Objection raised — Structural
06/11/2025
Filed — Alteration
APPLICATION FOR THE LEGALIZATION OF THE EXTENDED PORTION IN THE BASEMENT AND INTERIOR GENERAL CONSTRUCTION PARTITION WORK & HVAC MECHANICAL WORK WITHIN EXISTING 2-FAMILY DWELLING TO RESOLVE ECB VIOLATIONS #39147873Z AND #39147871P.
B01226879-S1
06/11/2025
Objection resolved — Addressed
06/10/2025
Special inspection requirement — Fenestration air leakage
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Interior lighting power
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Masonry
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Final
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Air barrier - visual inspection
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Fenestration areas
ABRAHAM TAWIL
06/10/2025
Special inspection requirement — Insulation placement and R values
ABRAHAM TAWIL
06/06/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLANZO CONSTRUCTION & HOME09/12/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC08/22/2025
DOB NOWGeneral ConstructionSigned-offLANZO CONSTRUCTION & HOME07/23/2025
BISPLISSUEDGO GREENER PLUMBING LLC09/07/2007
BISOTISSUEDN/A09/08/2006
1 project · most recent 06/11/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/11/2025Signed-offLANZO CONSTRUCTION & HOMEHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM42NAMHZ2-U1 42,000 BTU · Vrf Outdoor ×1
SUZ-KA18NA2.TH 18,000 BTU · Condensing Unit ×1
2 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025Permit IssuedURBANO'S ELECTRICAL CORPGeneral Wiring
05/13/2025CompleteBROOKYLN SOLARWORKS, LLC—
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/21/2025Air barrier - visual inspectionABRAHAM TAWILenergy_progress
08/21/2025Fenestration and door U-factor and product ratingsABRAHAM TAWILenergy_progress
08/21/2025MasonryABRAHAM TAWILspecial
08/21/2025Fenestration areasABRAHAM TAWILenergy_progress
08/21/2025Fenestration air leakageABRAHAM TAWILenergy_progress
08/21/2025Interior lighting powerABRAHAM TAWILenergy_progress
06/10/2025Fenestration air leakageABRAHAM TAWILenergy_progress
06/10/2025Interior lighting powerABRAHAM TAWILenergy_progress
06/10/2025MasonryABRAHAM TAWILspecial
06/10/2025FinalABRAHAM TAWILprogress
06/10/2025Fenestration and door U-factor and product ratingsABRAHAM TAWILenergy_progress
06/10/2025Air barrier - visual inspectionABRAHAM TAWILenergy_progress
06/10/2025Fenestration areasABRAHAM TAWILenergy_progress
06/10/2025Insulation placement and R valuesABRAHAM TAWILenergy_progress
06/03/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/03/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
06/03/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
06/03/2025FinalNARESH MAHANGUprogress
06/03/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
05/15/2025Maintenance informationABRAHAM TAWILenergy_progress
05/15/2025Mechanical SystemsABRAHAM TAWILspecial
05/15/2025FinalABRAHAM TAWILprogress
05/15/2025HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
05/15/2025HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
05/15/2025Insulation placement and R valuesABRAHAM TAWILenergy_progress
Latest 25 of 27.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01235394-I1Request digital key ↗
08/21/2026B01226879-I1Request digital key ↗
08/21/2026B01226879-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01226879-S1Open ↗
08/13/2026B01226879-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01226879-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature16
09/21/2026B01235394-I1Open ↗
09/21/2026B01235394-I1Open ↗
08/29/2026B01226879-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/21/2026B01235394-I1Open ↗
08/29/2026B01226879-I1Open ↗
08/29/2026B01226879-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01235394-I1Open ↗
08/21/2026B01226879-I1Open ↗
08/21/2026B01226879-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01235394-I1Open ↗
08/21/2026B01226879-S1Open ↗
08/21/2026B01226879-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01235394-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026B01226879-S1Open ↗
08/13/2026B01226879-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01226879-S1Open ↗
08/13/2026B01226879-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B01226879-S1Open ↗
08/13/2026B01226879-I1Open ↗