← Back
Primarily 1 family with 1 store or office
6920 18 AVENUE
BROOKLYN · BIN 3156702
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R5Zoning
2,100 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 6920 18TH AVE LLC · 2,000 sf lot · 1.05 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6920 18TH AVE LLC FRANK A103/22/2026
DELI PANADERIA PASTLLEI LINA CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ORLI ESHKAR ARCHITECT PLLC712/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARTINEZ SUAREZ CONSULTANTS603/21/2026
L L CONSULTING SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FREDD & H CONSTRUCION CORGeneral Contractor303/21/2026
MARTIN DORKINElectrical103/22/2026
TRINCITY ELECTRIC, INCElectrical103/22/2026
JOHN EVAN CONTRACTING CORGeneral Contractor107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292312/27/2023
Building Lifecycle
All (42)Filed (7)Permit Issued (3)Signed Off (1)Violation (6)Inspection (7)Objection (4)Special Inspection (14)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
02/15/2024
Signed off — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-I1
01/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/11/2024
Special inspection requirement — Fenestration areas
Jose Santos
01/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
01/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
01/11/2024
Special inspection requirement — Final
Orli Eshkar
01/11/2024
Special inspection requirement — Fenestration air leakage
Jose Santos
01/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Santos
01/11/2024
Special inspection requirement — Air barrier - visual inspection
Jose Santos
12/27/2023
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-P5
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
12/21/2023
Special inspection requirement — Final
Orli Eshkar
12/21/2023
Special inspection requirement — Air barrier - visual inspection
Jose Santos
12/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Santos
12/21/2023
Special inspection requirement — Fenestration areas
Jose Santos
12/21/2023
Special inspection requirement — Fenestration air leakage
Jose Santos
12/20/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/28/2023
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-P4
09/28/2023
Permit issued — General Construction
B08031461-I1-GC
09/21/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/14/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/10/2023
Objection resolved — Addressed
07/27/2023
Objection raised — Other
07/25/2023
Objection resolved — Addressed
07/24/2023
Objection raised — Other
07/21/2023
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-P3
07/21/2023
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-P2
06/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2023
Permit issued — Plumbing
B08031461-S1-PL
03/07/2023
Permit issued — General Construction
B08031461-I1-GC
01/04/2023
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-P1
12/21/2022
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-S1
12/08/2022
Filed — Alteration
Renovation of existing eating and drinking establishment at 1st floor and cellar to alleviate ECB Violation #: 39069405R, and to lift the stop work order. No change in occupancy, use, egress, or bulk.
B08031461-I1
09/02/2022
Violation issued (ECB, closed)
Construction
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/1993
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR09/28/2023
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP04/10/2023
DOB NOWGeneral ConstructionSigned-offFREDD & H CONSTRUCION COR03/07/2023
BISPLISSUEDCHINATOWN PLBG & HTG INC09/26/2006
BISMHISSUEDJNL CONSTRUCTION INC.09/18/2006
1 project · most recent 12/27/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/27/2023Signed-offSIGNORE & SONS PLBG CORPGas, Water/Sanitary
3 projects · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CompleteTRINCITY ELECTRIC, INCGeneral Wiring
09/15/2023CancelledTRINCITY ELECTRIC, INCGeneral Wiring
02/17/2023CompleteMARTIN DORKINGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/20/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/14/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/11/2024Fenestration areasJose Santosenergy_progress
01/11/2024Fire-Resistant Penetrations and JointsJose Santosspecial
01/11/2024Energy Code Compliance InspectionsJose Santosprogress
01/11/2024FinalOrli Eshkarprogress
01/11/2024Fenestration air leakageJose Santosenergy_progress
01/11/2024Fenestration and door U-factor and product ratingsJose Santosenergy_progress
01/11/2024Air barrier - visual inspectionJose Santosenergy_progress
12/21/2023Fire-Resistant Penetrations and JointsJose Santosspecial
12/21/2023Energy Code Compliance InspectionsJose Santosprogress
12/21/2023FinalOrli Eshkarprogress
12/21/2023Air barrier - visual inspectionJose Santosenergy_progress
12/21/2023Fenestration and door U-factor and product ratingsJose Santosenergy_progress
12/21/2023Fenestration areasJose Santosenergy_progress
12/21/2023Fenestration air leakageJose Santosenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B08031461-P3Request digital key ↗
08/27/2026B08031461-S1Request digital key ↗
08/27/2026B08031461-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B08031461-S1Open ↗
08/27/2026B08031461-I1Open ↗
08/27/2026B08031461-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B08031461-I1Open ↗
08/31/2026B08031461-I1Open ↗
08/31/2026B08031461-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B08031461-I1Open ↗
08/26/2026B08031461-P5Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B08031461-S1Open ↗
08/27/2026B08031461-I1Open ↗
08/27/2026B08031461-P5Open ↗
Showing 3 of 7 on file for this type