← Back
BuildNYC
Five to six families
695 CONEY ISLAND AVENUE
BROOKLYN · BIN 3118229
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6AZoning
4,320 sfGross Floor Area
6Units
Rent Stabilized5 Active Violations 4 unresolved · 1 paperwork only 3 likely answered ▸FDNY Report ↗
Five to six families · Owner of record: 695 Coney Island Realty · 2,392 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Kitchenette and new gas meter installation11p · 1 filing · 8 docs
Floor 2Kitchenette and new gas meter installation10p · 1 filing · 8 docs
Floor 1Kitchenette and new gas meter installation11p · 1 filing · 8 docs
CellarKitchenette and new gas meter installation12p · 1 filing · 8 docs
Filed — no permit issuedInstallation of construction fence2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dafnonas Estates907/08/2026
NYC Department of Housing Preservation and Development203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Farhad Bassiri-Tehrani210/09/2022
Architectural Concept111/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archvision Design Studio203/21/2026
Architectual Concept203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Horbridge Plumbing & HeatingPlumbing607/08/2026
BDS ElectricElectrical103/22/2026
Deltex Electrical Cont. IElectrical103/22/2026
Adam Electrical ContrngElectrical103/21/2026
Akhtar ConstructionGeneral Contractor103/21/2026
K.M.D. ConstructionGeneral Contractor108/08/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394210/09/2022
Building Lifecycle
07/06/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/04/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/31/2025
Boiler inspection report filed
Initial · no defects · Accepted
08/25/2025
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT…
HPD violation · closed
08/25/2025
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
217 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHorbridge Plumbing & Heating04/07/2021
BISOTISSUEDAkhtar Construction07/15/2021
BISOTISSUEDAkhtar Construction02/18/2021
BISOTISSUEDK.M.D. Construction08/08/2016
4 projects · most recent 03/03/2021
General Wiring Lighting
FiledStatusContractorScope
03/03/2021CompleteAdam Electrical ContrngGeneral Wiring
03/13/2019Permit IssuedDeltex Electrical Cont. IGeneral Wiring
01/16/2019CompleteDeltex Electrical Cont. I—
03/06/2018Permit IssuedBDS ElectricGeneral Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/17/2022Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
11/17/2022HVAC-R and service water piping design and insulationAKM HOQUEenergy_progress
82 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account