Predominantly retail with other uses
696 3 AVENUE
MANHATTAN · BIN 1036167
💬 Discuss this project
1926Year Built
5Stories
K4Building Class
C5-3Zoning
1,680 sfGross Floor Area
1Units
Rent Stabilized65 Open Violations ▸
Predominantly retail with other uses · Owner of record: 696 THIRD AVENUE REALTY LLC · 1,681 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 11 docs
Floor 51 filing · 7 docs
Floor 41 filing · 7 docs
Floor 31 filing · 7 docs
Floor 21 filing · 7 docs
Floor 11p · 2 filings · 18 docs
Cellar2p · 1 filing · 11 docs
3 jobs · most recent 03/14/2025
General Wiring
FiledStatusContractorScope
03/14/2025CompleteLINTECH ELECTRIC, INCGeneral Wiring
03/07/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
01/17/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
1 job · most recent 09/01/2021
Steel
FiledStatusContractorScope
09/01/2021Permit IssuedALL CITY REMODELING, INCSteel
2 jobs · most recent 02/20/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/20/2024Permit IssuedJERRICK ASSOCIATES INCScaffold
04/28/2020Permit IssuedJERRICK ASSOCIATES INCSidewalk Shed
Building Lifecycle
All (134)Filed (14)Permit Issued (16)Signed Off (5)Violation (60)Inspection (5)Objection (4)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, closed)
A
03/14/2025
Signed off — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-S1
03/14/2025
Signed off — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-I1
03/13/2025
Filed — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-P4
03/13/2025
Special inspection requirement — Mechanical Systems
Yao Guo
03/13/2025
Special inspection requirement — Interior lighting power
billy chen
03/13/2025
Special inspection requirement — Insulation placement and R values
billy chen
03/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
billy chen
03/13/2025
Special inspection requirement — Final
billy chen
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
03/11/2025
Special inspection requirement — Mechanical Systems
Yao Guo
03/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
billy chen
03/11/2025
Special inspection requirement — Interior lighting power
billy chen
03/11/2025
Special inspection requirement — Insulation placement and R values
billy chen
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
03/11/2025
Special inspection requirement — Final
billy chen
03/04/2025
Signed off — Alteration
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
M00514000-I1
02/19/2025
Filed — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-P3
02/13/2025
Special inspection requirement — Mechanical Systems
Yao Guo
02/13/2025
Special inspection requirement — Insulation placement and R values
billy chen
02/13/2025
Special inspection requirement — Interior lighting power
billy chen
02/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
billy chen
02/13/2025
Special inspection requirement — Final
billy chen
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
01/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
billy chen
10/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
10/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
billy chen
10/17/2024
Filed — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-P2
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yao Guo
10/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
billy chen
10/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
billy chen
09/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2024
Filed — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-P1
08/16/2024
Permit issued — Mechanical Systems
M01083592-S1-MS
08/15/2024
Permit issued — General Construction
M01083592-S1-GC
08/11/2024
Filed — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-S1
08/06/2024
Permit issued — Plumbing
M01083592-I1-PL
07/22/2024
Filed — Alteration
INSTALLATION OF NEW COMMERCIAL KITCHEN EQUIPMENT AND RESTROOM FOR NEW BAGLE SHOP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01083592-I1
06/13/2024
Signed off — Alteration
INTERIOR RENOVATION TO COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01001131-S1
06/10/2024
Signed off — Alteration
INTERIOR RENOVATION TO COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01001131-I1
06/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/07/2024
Special inspection requirement — Fenestration areas
Balser Richard
06/07/2024
Special inspection requirement — Air barrier - visual inspection
Balser Richard
06/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Balser Richard
06/07/2024
Special inspection requirement — Final
Balser Richard
06/07/2024
Special inspection requirement — Fenestration air leakage
Balser Richard
06/06/2024
Filed — Alteration
INTERIOR RENOVATION TO COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01001131-P1
04/01/2024
Violation issued (HPD, closed)
A
03/19/2024
Permit issued — General Construction
M00514000-I1-GC-CX
03/14/2024
Violation issued (ECB, closed)
Construction
03/07/2024
Permit issued — Plumbing
M01001131-S1-PL
02/29/2024
Permit issued — General Construction
M01001131-I1-GC
02/27/2024
Filed — Alteration
INTERIOR RENOVATION TO COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01001131-S1
02/27/2024
Filed — Alteration
INTERIOR RENOVATION TO COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01001131-I1
02/21/2024
Permit issued — Supported Scaffold
M00371196-I1-SF
02/20/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00371196-P1
Latest 60 of 134 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JERRICK ASSOCIATES2207/08/2026
THIRD AVE REALTY203/22/2026
696 THIRD AVE REALTY L1703/22/2026
OWNER OF 693 3RD AVE103/22/2026
DELICATESEN103/21/2026
696 DELI203/21/2026
SOLIL MANAGEMENT103/21/2026
85 EAST 158TH STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BCHEN ARCHITECT PLLC603/13/2025
RICHARD H BALSER, P.E.306/06/2024
PAUL PERDEK, PROF. ENG. PLLC202/20/2024
PBA ENGINEERING, PC.109/01/2021
WSP105/05/2021
DOOLING & COMPANY ARCHITECTS104/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
AE DESIGN SOLUTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JERRICK ASSOCIATES INCGeneral Contractor1607/08/2026
ALL CITY REMODELING, INCGeneral Contractor403/21/2026
INSTYLE HOME RENOVATIONSGeneral Contractor303/21/2026
MUSCARELLA, JAMESElectrical103/21/2026
TOG CONSTRUCTION CORPElectrical103/21/2026
AK PREMIER CONTRACTINGGeneral Contractor107/08/2026
GREY STONE RESTORATIONGeneral Contractor107/08/2026
BEST PLUMBING & HVAC INCPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
GO PRO PLUMBING AND HEATINGPlumbing107/08/2026
GIORDANELLA, FRANKElectrical103/21/2026
LINTECH ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAO W GUO ARCHITECT P.C.1754603/13/2025
RICHARD H. BALSER ENGINEE3028209/01/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAK PREMIER CONTRACTORS08/16/2024
DOB NOWGeneral ConstructionSigned-offINSTYLE HOME RENOVATIONS08/15/2024
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC08/06/2024
DOB NOWGeneral ConstructionSigned-offGE 2A CONSTRUCTION03/19/2024
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI03/07/2024
DOB NOWGeneral ConstructionSigned-offALL CITY REMODELING, INC02/29/2024
DOB NOWSupported ScaffoldPermit IssuedGE 2A CONSTRUCTION02/21/2024
DOB NOWSidewalk ShedPermit IssuedGE 2A CONSTRUCTION05/10/2023
DOB NOWSupported ScaffoldPermit IssuedGE 2A CONSTRUCTION08/03/2022
DOB NOWGeneral ConstructionSigned-offGREY STONE RESTORATION05/31/2022
DOB NOWStructuralPermit IssuedALL CITY REMODELING, INC05/31/2022
DOB NOWSidewalk ShedPermit IssuedGE 2A CONSTRUCTION05/10/2022
DOB NOWSupported ScaffoldPermit IssuedGE 2A CONSTRUCTION08/16/2021
DOB NOWSidewalk ShedPermit IssuedGE 2A CONSTRUCTION05/10/2021
DOB NOWSupported ScaffoldPermit IssuedGE 2A CONSTRUCTION07/29/2020
DOB NOWSidewalk ShedPermit IssuedGE 2A CONSTRUCTION04/30/2020
BISEQISSUEDEVEREST SCAFFOLDING INC05/02/2008
BISFPISSUEDACTIVE FIRE CONTROL CO/ ACTIVE F02/04/2000
BISMHISSUEDHALL & DOLPHY IRON WORKS07/24/1998
BISOTISSUEDD I GUIDE INC07/24/1997
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
03/13/2025Mechanical SystemsYao Guospecial
03/13/2025Interior lighting powerbilly chenenergy_progress
03/13/2025Insulation placement and R valuesbilly chenenergy_progress
03/13/2025Fire-Resistance Rated Constructionbilly chenprogress
03/13/2025Finalbilly chenprogress
03/13/2025Fire-Resistant Penetrations and JointsYao Guospecial
03/11/2025Mechanical SystemsYao Guospecial
03/11/2025Fire-Resistance Rated Constructionbilly chenprogress
03/11/2025Interior lighting powerbilly chenenergy_progress
03/11/2025Insulation placement and R valuesbilly chenenergy_progress
03/11/2025Fire-Resistant Penetrations and JointsYao Guospecial
03/11/2025Finalbilly chenprogress
02/13/2025Mechanical SystemsYao Guospecial
02/13/2025Insulation placement and R valuesbilly chenenergy_progress
02/13/2025Interior lighting powerbilly chenenergy_progress
02/13/2025Fire-Resistance Rated Constructionbilly chenprogress
02/13/2025Finalbilly chenprogress
02/13/2025Fire-Resistant Penetrations and JointsYao Guospecial
10/18/2024HVAC-R and service water heating equipmentbilly chenenergy_progress
10/18/2024Fire-Resistant Penetrations and JointsYao Guospecial
10/18/2024HVAC-R and service water piping design and insulationbilly chenenergy_progress
10/17/2024Fire-Resistant Penetrations and JointsYao Guospecial
10/17/2024HVAC-R and service water heating equipmentbilly chenenergy_progress
10/17/2024HVAC-R and service water piping design and insulationbilly chenenergy_progress
06/07/2024Fenestration areasBalser Richardenergy_progress
Latest 25 of 39.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
09/03/2026M00514000-I1Request digital key ↗
08/27/2026M01001131-P1Request digital key ↗
08/27/2026M01001131-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026M00371196-P1Request digital key ↗
08/28/2026M00371196-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00344884-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/01/2008110156651Open ↗
▸BISWORK PERMIT APPLICATION1
05/02/2008110156651Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026M01083592-I1Open ↗
09/01/2026M01083592-I1Open ↗
09/01/2026M01001131-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026M00371196-I1Open ↗
08/26/2026M01083592-P4Open ↗
08/26/2026M01083592-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M01083592-I1Open ↗
08/28/2026M01083592-P3Open ↗
08/27/2026M00517009-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/01/2008110156651Open ↗
05/01/2008110156651Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/01/2008110156651Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/01/2008110156651Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/28/2026M00371196-I1Open ↗
08/13/2026M00371196-P1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026M01083592-P4Open ↗
08/26/2026M01083592-P3Open ↗
08/26/2026M01083592-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00517009-I1Open ↗
08/13/2026M00514000-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/01/2008110156651Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/01/2008110156651Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
05/01/2008110156651Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M01083592-P2Open ↗