← Back
Two stories - detached, small or mid-size
697 EAST 21 STREET
BROOKLYN · Flatbush · BIN 3120607
💬 Discuss this project
1899Year Built
2.5Stories
A1Building Class
R3XZoning
3,463 sfGross Floor Area
1Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: ACH TOV 21 LLC · 6,300 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Attic2p · 1 filing · 11 docs
Floor 36p · 1 filing · 11 docs
Floor 28p · 1 filing · 11 docs
Floor 18p · 1 filing · 11 docs
Cellar8p · 1 filing · 11 docs
Filed — no permit issued14p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CMRE MANAGEMENT607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/16/2025$2.4M—ACH TOV 21 LLC → Private party$686/sf building
02/01/2024$1.1M—Private party → ACH TOV 21 LLC$308/sf building
07/11/2023$1.1M—— → —$317/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRAME DESIGN CORPS106/22/2026
CHUN ENGINEERING CONSULTANT PLLC305/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRAME DESIGN AND CONSTRUC7971106/22/2026
WORLD DESIGN ARCHITECTURE9323305/10/2025
Building Lifecycle
All (38)Filed (4)Permit Issued (2)Signed Off (2)Violation (11)Inspection (2)Objection (6)Special Inspection (11)
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
07/13/2026
Objection raised — Other
07/13/2026
Objection raised — Other
07/13/2026
Objection raised — Other
06/22/2026
Filed — Alteration
APPLICATION TO LEGALIZE THE EXTENSION WORK ON THE FIRST FLOOR ON EAST 21 AVENUE SIDE TO COMPLY WITH ECBVIOLATION NUMBER #39186591M. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01418569-I1
06/18/2026
Special inspection requirement — Lighting in dwelling units
SURESH WARREN
06/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SURESH WARREN
06/18/2026
Special inspection requirement — Maintenance information
SURESH WARREN
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SURESH WARREN
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SURESH WARREN
06/18/2026
Special inspection requirement — Final
06/18/2026
Special inspection requirement — Insulation placement and R values
SURESH WARREN
06/18/2026
Special inspection requirement — Fenestration air leakage
SURESH WARREN
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SURESH WARREN
04/29/2026
Violation issued (ECB, open)
Construction
11/24/2025
Violation issued (HPD, open)
I
05/29/2025
Signed off — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01182323-I1
B01182323-S1
05/29/2025
Signed off — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01182323-I1
B01182323-I1
05/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/10/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01182323-I1
B01182323-P1
05/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
03/20/2025
Permit issued — Plumbing
B01182323-S1-PL
03/03/2025
Permit issued — General Construction
B01182323-I1-GC
02/28/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01182323-I1
B01182323-S1
02/27/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01182323-I1
B01182323-I1
10/19/2016
Violation issued (HPD, closed)
B
10/19/2016
Violation issued (HPD, closed)
B
10/19/2016
Violation issued (HPD, closed)
B
10/19/2016
Violation issued (HPD, closed)
B
03/11/2005
Violation issued (ECB, closed)
Quality of Life
01/15/2005
Violation issued (HPD, closed)
B
12/13/2004
Violation issued (HPD, closed)
B
12/11/2004
Violation issued (HPD, closed)
B
12/11/2004
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/20/2025
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO03/03/2025
3 projects · most recent 10/26/2025
General Wiring
FiledStatusContractorScope
10/26/2025CompleteCITY GRID ELECTRIC CORP—
04/03/2025CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring
06/25/2024CompleteSAFEWAY CONSTRUCTION, INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/18/2026Lighting in dwelling unitsSURESH WARRENenergy_progress
06/18/2026Fenestration and door U-factor and product ratingsSURESH WARRENenergy_progress
06/18/2026Maintenance informationSURESH WARRENenergy_progress
06/18/2026Fire-Resistant Penetrations and JointsSURESH WARRENspecial
06/18/2026Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
06/18/2026Final—progress
06/18/2026Insulation placement and R valuesSURESH WARRENenergy_progress
06/18/2026Fenestration air leakageSURESH WARRENenergy_progress
06/18/2026HVAC-R and service water piping design and insulationSURESH WARRENenergy_progress
05/13/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/07/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026B01182323-I1Request digital key ↗
08/22/2026B01182323-P1Request digital key ↗
08/22/2026B01182323-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01418569-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026B01182323-P1Open ↗
08/22/2026B01182323-S1Open ↗
08/22/2026B01182323-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/12/2026B01182323-P1Open ↗
08/25/2026B01182323-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026B01182323-S1Open ↗
08/22/2026B01182323-I1Open ↗
08/22/2026B01182323-P1Open ↗
▸Other Documents3
▸DOB NOWPlot Diagram1
08/14/2026B01418569-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01418569-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01418569-I1Open ↗