← Back
Elevator apt, fireproof without stores
697 WEST END AVENUE
MANHATTAN · BIN 1034136
💬 Discuss this project
1929Year Built
16Stories
D3Building Class
R10AZoning
148,873 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized18 Open Violations 17 unresolved · 1 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: WESTMAN REALTY CO · 11,073 sf lot · 13.44 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELBE CONSTRUCTION807/08/2026
ARGO REAL ESTATE2207/08/2026
APEX GROUP NY704/09/2026
WESTMAN REALTY CO1203/22/2026
TEH ARGO CORP103/22/2026
THE OWNER OF103/22/2026
THE AREO CORP.103/22/2026
WESTMAN PLET-1 CP103/22/2026
RCN103/21/2026
ARGO GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SRL ASSOCIATES105/19/2025
AP PROFESSIONAL ENGINEERING PLLC102/21/2024
DEMO ARCHITECTURE, PLLC2203/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APEX GROUP NY CORPGeneral Contractor404/09/2026
TECHCREW INCGeneral Contractor303/21/2026
JMK PAINTING LLCGeneral Contractor307/08/2026
CAMENZULI, CARMINEElectrical203/21/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor203/21/2026
NYC DISTRICT COUNCIL OF CElectrical203/21/2026
ELBE CONSTRUCTION LLCGeneral Contractor207/08/2026
METROPOLITAN OPERA ASSOCIElectrical203/21/2026
ALTAIR PLUMBING AND HEATPlumbing207/08/2026
JEFFREY SOLOMONElectrical203/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
JOHN FRANCICAElectrical103/21/2026
ARIANA CONTRACTING INCPlumbing107/08/2026
AURA PLUMBING INCPlumbing107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181207/12/2025
AA BUILDING & INSPECTION1519105/19/2025
FRAME DESIGN AND CONSTRUC7971105/19/2025
FENAGH, INC6942401/31/2023
Building Lifecycle
All (161)Filed (26)Permit Issued (17)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (12)Objection (6)Special Inspection (19)
05/13/2026
Signed off — Alteration
installation of outrigger for facade repair.
M01254811-I1
04/23/2026
Permit issued — Suspended Scaffold
M01254811-I1-SC
04/20/2026
Violation issued (ECB, open)
Local Law
03/17/2026
Violation issued (HPD, closed)
C
01/23/2026
Permit issued — Sidewalk Shed
M01008462-I1-SH
12/01/2025
Violation issued (ECB, closed)
Elevators
10/14/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Permit issued — General Construction
M01147820-I1-GC
08/28/2025
Permit issued — Suspended Scaffold
M01254811-I1-SC
08/05/2025
Permit issued — Suspended Scaffold
M01254811-I1-SC
07/22/2025
Permit issued — Suspended Scaffold
M01254811-I1-SC
07/12/2025
Filed — Alteration
installation of outrigger for facade repair.
M01254811-I1
07/12/2025
Special inspection requirement — Post-installed Anchors
TREVOR O. FLOWERS
07/07/2025
Filed — Alteration
M01251428-I1
05/19/2025
Filed — Alteration
Exterior facade repairs and waterproofing, brick replacement, facade patching, pointing. No change in use egress or occupancy
M01147820-I1
05/02/2025
Violation issued (HPD, open)
B
05/02/2025
Violation issued (HPD, closed)
A
04/25/2025
Violation issued (HPD, open)
B
04/25/2025
Violation issued (HPD, open)
C
02/26/2025
Violation issued (HPD, closed)
C
01/30/2025
Permit issued — Sidewalk Shed
M01008462-I1-SH
11/26/2024
Special inspection requirement — Masonry
SURESH WARREN
11/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SURESH WARREN
11/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
11/26/2024
Special inspection requirement — Final
Sean Lenahan
02/22/2024
Permit issued — Sidewalk Shed
M01008462-I1-SH
02/21/2024
Filed — Alteration
M01008462-I1
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/20/2024
Cycle 9 facade inspection completed
02/08/2024
Cycle 9 facade report signed — UNSAFE
01/24/2024
Violation issued (HPD, closed)
C
01/24/2024
Violation issued (HPD, closed)
C
01/24/2024
Violation issued (HPD, closed)
C
01/24/2024
Violation issued (HPD, open)
B
04/07/2023
Signed off — Alteration
PROPOSED RENOVATION OF (2) EXISTING APARTMENT UNITS #8G & 8H (FORMERLY 8A & 8B) ON THE 8TH FLOOR. RENOVATION CONSISTS OF REPLACED AND NEW PLUMBING FIXTURES AS PER PLAN, GENERAL CONSTRUCTION WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE
M00677200-I1
03/06/2023
Filed — Alteration
PROPOSED RENOVATION OF (2) EXISTING APARTMENT UNITS #8G & 8H (FORMERLY 8A & 8B) ON THE 8TH FLOOR. RENOVATION CONSISTS OF REPLACED AND NEW PLUMBING FIXTURES AS PER PLAN, GENERAL CONSTRUCTION WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE
M00677200-P8
02/15/2023
Filed — Alteration
PROPOSED RENOVATION OF (2) EXISTING APARTMENT UNITS #8G & 8H (FORMERLY 8A & 8B) ON THE 8TH FLOOR. RENOVATION CONSISTS OF REPLACED AND NEW PLUMBING FIXTURES AS PER PLAN, GENERAL CONSTRUCTION WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE
M00677200-P7
02/07/2023
Signed off — Alteration
M00677178-I1
02/04/2023
Permit issued — General Construction
M00677178-I1-GC
02/02/2023
Signed off — Alteration
M00768355-I1
02/01/2023
Special inspection requirement — Final
Daniel Kidd
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
02/01/2023
Special inspection requirement — Final
Daniel Kidd
02/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Daniel Kidd
01/31/2023
Filed — Alteration
PROPOSED RENOVATION OF EXISTING APARTMENT UNIT 1B ON THE 1ST FLOOR. RENOVATION CONSISTS OF MINOR PARTITIONS, AND AND INTERIOR FINISH WORK AS PER PLAN. PLUMBING WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M00794209-P1
01/31/2023
Filed — Alteration
M00677178-P3
01/31/2023
Special inspection requirement — Final
01/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
01/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Daniel Kidd
01/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/24/2023
Filed — Alteration
PROPOSED RENOVATION OF (2) EXISTING APARTMENT UNITS #8G & 8H (FORMERLY 8A & 8B) ON THE 8TH FLOOR. RENOVATION CONSISTS OF REPLACED AND NEW PLUMBING FIXTURES AS PER PLAN, GENERAL CONSTRUCTION WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE
M00677200-P6
01/24/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/04/2023
Filed — Alteration
PROPOSED RENOVATION OF (2) EXISTING APARTMENT UNITS #8G & 8H (FORMERLY 8A & 8B) ON THE 8TH FLOOR. RENOVATION CONSISTS OF REPLACED AND NEW PLUMBING FIXTURES AS PER PLAN, GENERAL CONSTRUCTION WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE
M00677200-P5
12/20/2022
Signed off — Alteration
M00768344-I1
12/13/2022
Objection resolved — Addressed
12/03/2022
Objection raised — Scope
11/29/2022
Filed — Alteration
PROPOSED RENOVATION OF (2) EXISTING APARTMENT UNITS #8G & 8H (FORMERLY 8A & 8B) ON THE 8TH FLOOR. RENOVATION CONSISTS OF REPLACED AND NEW PLUMBING FIXTURES AS PER PLAN, GENERAL CONSTRUCTION WORK WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE
M00677200-P4
11/15/2022
Signed off — Alteration
DIVIDE EXISTING UNIT INTO TWO SEPARATE APARTMENTS PER APPROVED OT APPLICATION #140972954. PL SCOPE OF WORK TO REMOVE AND REPLACE EXISTING PL FIXTURES IN PLACE. NEW GAS RANGE AND NEW TOILET AS PER PLAN SET. NO CHANGE IN USE, EXITING, OR OCCUPANCY.
M00456891-I1
10/28/2022
Permit issued — Plumbing
M00677200-I1-PL
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offNY WONDER CONSTRUCTION CO04/23/2026
DOB NOWSidewalk ShedPermit IssuedAPEX GROUP NY CORP01/23/2026
DOB NOWGeneral ConstructionPermit IssuedELBE CONSTRUCTION LLC09/04/2025
DOB NOWSuspended ScaffoldSigned-offELBE GROUP 1313 INC08/28/2025
DOB NOWSuspended ScaffoldSigned-offELBE GROUP 1313 INC08/05/2025
DOB NOWSuspended ScaffoldSigned-offELBE CONSTRUCTION LLC07/22/2025
DOB NOWSidewalk ShedPermit IssuedAPEX GROUP NY CORP01/30/2025
DOB NOWSidewalk ShedPermit IssuedAPEX GROUP NY CORP02/22/2024
DOB NOWGeneral ConstructionSigned-offJMK PAINTING02/04/2023
DOB NOWPlumbingSigned-offAURA PLUMBING INC10/28/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/23/2022
DOB NOWGeneral ConstructionSigned-offTECHCREW INC08/23/2022
DOB NOWGeneral ConstructionSigned-offJMK PAINTING06/14/2022
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC05/27/2022
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP04/06/2022
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT12/07/2021
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT09/07/2021
BISOTISSUEDTECHCREW INC09/22/2021
BISOTISSUEDTECHCREW INC08/12/2021
BISOTISSUEDACCURA REST.& WATERPROOF04/05/2018
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/20/2017
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/29/2017
BISOTISSUEDACCURA RESTORATION INC03/23/2017
BISOTISSUEDACCURA RESTORATION INC10/21/2016
BISOTISSUEDACCURA RESTORATION INC10/21/2016
BISOTISSUEDACCURA RESTORATION INC08/30/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/17/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/20/2016
BISEQISSUEDSPRING SCAFFOLDING LLC06/02/2016
BISOTISSUEDACCURA REST.& WATERPROOF04/28/2016
BISOTISSUEDACCURA RESTORATION INC01/27/2016
BISOTISSUEDACCURA RESTORATION INC09/22/2015
BISOTISSUEDACCURA RESTORATION INC09/11/2015
BISOTISSUEDACCURA RESTORATION INC09/10/2015
BISOTISSUEDACCURA RESTORATION INC06/12/2015
BISEQISSUEDROCKLEDGE SCAFFOLD CORP05/29/2015
BISOTISSUEDACCURA RESTORATION INC04/03/2015
BISOTISSUEDACCURA RESTORATION INC02/10/2015
BISOTISSUEDACCURA RESTORATION INC08/21/2014
BISOTISSUEDACCURA RESTORATION INC07/11/2014
+ 13 more permits on file
4 projects · most recent 02/21/2024
General Wiring
FiledStatusContractorScope
02/21/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
08/03/2022Permit IssuedMLS ELECTRIC LLCGeneral Wiring
08/17/2021CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
02/15/2021Permit IssuedALL WAYS ELECTRIC CORP.W—
1 project · most recent 07/12/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/12/2025Signed-offNY WONDER CONSTRUCTION COSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/15/2022Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
09/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/07/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/12/2025Post-installed AnchorsTREVOR O. FLOWERSspecial
11/26/2024MasonrySURESH WARRENspecial
11/26/2024Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
11/26/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
11/26/2024FinalSean Lenahanprogress
02/01/2023FinalDaniel Kiddprogress
02/01/2023Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
02/01/2023FinalDaniel Kiddprogress
02/01/2023Energy Code Compliance InspectionsDaniel Kiddprogress
01/31/2023Final—progress
01/31/2023Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
01/31/2023Energy Code Compliance InspectionsDaniel Kiddprogress
07/14/2022Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
07/14/2022Energy Code Compliance InspectionsDaniel Kiddprogress
07/13/2022Interior lighting powerDaniel Kiddenergy_progress
07/01/2022FinalDaniel Kiddprogress
05/25/2022Energy Code Compliance InspectionsDaniel Kiddprogress
05/20/2022Energy Code Compliance InspectionsDaniel Kiddprogress
05/20/2022Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch20
09/02/2026M00677178-I1Request digital key ↗
09/02/2026M00677178-P1Request digital key ↗
09/02/2026M00677178-P3Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/03/2026M00456891-I1Request digital key ↗
09/03/2026M00456891-P2Request digital key ↗
09/03/2026M00456891-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits59
▸DOB NOWLPC Approval/Permit23
09/03/2026M00456891-I1Open ↗
09/03/2026M00456891-P2Open ↗
09/03/2026M00456891-P3Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION20
08/12/2021140972954Open ↗
04/09/2018121568981Open ↗
08/01/2017140536098Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
07/28/2021121568981Open ↗
11/18/2020140972954Open ↗
10/09/2020121568981Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026M00456891-P4Open ↗
09/03/2026M00456891-I1Open ↗
09/03/2026M00456891-P5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00677178-P1Open ↗
09/01/2026M00794209-I1Open ↗
09/01/2026M00768344-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/27/2017140536098Open ↗
11/27/2017121149881Open ↗
06/06/2016122789349Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M00677178-P1Open ↗
08/28/2026M00677178-P3Open ↗
08/26/2026M00677178-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/06/2016122789349Open ↗
07/13/2012121149881Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/16/2016140536098Open ↗
06/06/2016122789349Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/18/2020140972954Open ↗
08/16/2016140536098Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/13/2012121149881Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/16/2016140536098Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/18/2020140972954Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES3
01/11/2021140972954Open ↗
08/16/2016140536098Open ↗
06/06/2016122789349Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/02/2015121568981Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/02/2026M00677178-P1Open ↗
09/02/2026M00677178-I1Open ↗
09/02/2026M00677178-P3Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/16/2016140536098Open ↗
06/06/2016122789349Open ↗
07/13/2012121149881Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00456891-I1Open ↗
08/23/2026M01147820-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/14/2007110012094Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/11/2021140972954Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00768344-I1Open ↗
08/13/2026M00768355-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/23/2025121568981Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/02/2013121568981Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/07/2022140972954Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2020140972954Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
06/23/2025121568981Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/27/2022121568981Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/27/2022121568981Open ↗
08/16/2016140536098Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
06/23/2025121568981Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
06/23/2025121568981Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
06/23/2025121568981Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/23/2025121568981Open ↗
▸BISMASONRY1
06/23/2025121568981Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/28/2015121568981Open ↗
06/09/2015121149881Open ↗
02/23/2015121568981Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/27/2017140536098Open ↗
11/27/2017121149881Open ↗
10/21/2016122789349Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/02/2013121568981Open ↗
07/13/2012121149881Open ↗
▸BISLANDMARKS APPROVAL2
08/16/2016140536098Open ↗
07/06/2015121568981Open ↗
▸BISCCD1-Construction Code Determination2
07/16/2014121568981Open ↗
07/16/2014121568981Open ↗
▸BISFINAL1
06/23/2025121568981Open ↗
▸BISSHED LETTER1
07/24/2013121149881Open ↗
▸BISSUPERSEDING LETTER1
04/11/2017121568981Open ↗
▸BISLANDMARKS SIGNOFF1
10/13/2022140972954Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
11/18/2020140972954Open ↗
08/31/2020121568981Open ↗
09/10/2018121568981Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/07/2022140972954Open ↗
10/07/2022140972954Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION7
10/27/2022121568981Open ↗
01/11/2021140972954Open ↗
09/28/2016122507402Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
06/06/2016122789349Open ↗
03/28/2016122507402Open ↗
04/02/2013121568981Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
09/10/2018121568981Open ↗
11/27/2017140536098Open ↗
11/27/2017121149881Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/18/2020140972954Open ↗
08/16/2016140536098Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
08/13/2026M01254811-I1Open ↗
08/13/2026M01251428-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01251428-I1Open ↗
08/13/2026M01254811-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/09/2015121149881Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
11/18/2020140972954Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
06/23/2025121568981Open ↗