← Back
Factory, light manufacturing
698 CENTRAL AVENUE
BROOKLYN · BIN 3080146
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M1-1Zoning
15,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: CATTLE AND HAT HOTEL LLC · 15,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 6 docs
Floor 11 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FERHATI1607/08/2026
RELIABLE ENTERPRISES407/08/2026
PJ BIMI, INC903/22/2026
GEZELLE KNITTING MILL LTD203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2022$5.8M—— → —$383/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES105/17/2023
P GEORGOPOULOS ARCHITECT PC112/14/2022
SELF EMPLOYED410/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Younes Abouyaala PE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FERHATI LLCGeneral Contractor407/08/2026
RADB CONTRACTING INCGeneral Contractor303/21/2026
SZLEZAK MAREKElectrical203/21/2026
HERBERT RUDERMANElectrical203/21/2026
MAREK SZLEZAKElectrical203/21/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNA BUILDERS AND CONSULTA2898112/14/2022
AA BUILDING & INSPECTION1519410/04/2022
Building Lifecycle
All (50)Filed (6)Permit Issued (6)Signed Off (3)Violation (19)Inspection (7)Special Inspection (9)
10/04/2023
Signed off — Alteration
B00875660-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2023
Permit issued — Sidewalk Shed
B00875660-I1-SH
05/17/2023
Filed — Alteration
B00875660-I1
05/08/2023
Permit issued — Structural
B08051302-I1-GC-CX
12/14/2022
Filed — Alteration
Proposed repair of facade as per plans herewith filed. Work includes removing and replacing parapet walls, stabilizing facade wall and repairing cracks as required. No change to use, egress or occupancy proposed under this application.
B08051302-I1
12/09/2022
Signed off — Alteration
B00656773-I1
12/09/2022
Permit issued — General Construction
B00656773-I1-ST
12/07/2022
Special inspection requirement — Masonry
Choudhry Yusaf
12/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Choudhry Yusaf
12/07/2022
Special inspection requirement — Final
Choudhry Yusaf
10/12/2022
Signed off — Alteration
REPAIR EXISTING SPRINKLER SYSTEM DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART. TOTAL 3 BRANCHES WITH 21 SP HEADS. AND REPAIR ROOF DRAIN DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART.
B00656795-I1
10/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2022
Filed — Alteration
REPAIR EXISTING SPRINKLER SYSTEM DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART. TOTAL 3 BRANCHES WITH 21 SP HEADS. AND REPAIR ROOF DRAIN DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART.
B00656795-P2
10/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/04/2022
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
10/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/04/2022
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
10/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/29/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/27/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/23/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/21/2022
Permit issued — Plumbing
B00656795-I1-EW-SP
09/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2022
Violation issued (ECB, closed)
Construction
09/09/2022
Filed — Alteration
REPAIR EXISTING SPRINKLER SYSTEM DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART. TOTAL 3 BRANCHES WITH 21 SP HEADS. AND REPAIR ROOF DRAIN DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART.
B00656795-P1
07/29/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/07/2022
Permit issued — Plumbing
B00656795-I1-PL
02/03/2022
Filed — Alteration
REPAIR EXISTING SPRINKLER SYSTEM DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART. TOTAL 3 BRANCHES WITH 21 SP HEADS. AND REPAIR ROOF DRAIN DAMAGED BY PARTIAL ROOF COLLAPSE AT REAR PART.
B00656795-I1
02/01/2022
Permit issued — General Construction
B00656773-I1-GC
01/11/2022
Filed — Alteration
B00656773-I1
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2021
Violation issued (ECB, closed)
Construction
09/02/2021
Violation issued (ECB, closed)
Construction
12/31/2019
Violation issued (ECB, closed)
Construction
11/15/2019
Violation issued (ECB, closed)
Construction
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2019
Violation issued (ECB, closed)
Construction
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2019
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (ECB, closed)
Zoning
05/03/2019
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (ECB, closed)
Construction
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC05/18/2023
DOB NOWStructuralPermit IssuedRADB CONTRACTING INC05/08/2023
DOB NOWGeneral ConstructionSigned-offFERHATI LLC12/09/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC09/21/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/07/2022
DOB NOWGeneral ConstructionSigned-offFERHATI LLC02/01/2022
BISBLISSUEDUNFLAT & PEROTTO ASSOCIATES INC.09/23/1999
BISPLISSUEDUNFLAT & PEROTTO ASSOCIATES INC.09/23/1999
1 job · most recent 05/18/2023
FiledStatusContractorScope
05/18/2023CompleteRICHARD NEU—
1 job · most recent 12/14/2022
Masonry
FiledStatusContractorScope
12/14/2022Permit IssuedRADB CONTRACTING INCMasonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/07/2022MasonryChoudhry Yusafspecial
12/07/2022Structural Stability – Alterations of existing buildingsChoudhry Yusafspecial
12/07/2022FinalChoudhry Yusafprogress
10/04/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/04/2022Sprinkler SystemsYounes Abouyaalaspecial
10/04/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/04/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/04/2022Sprinkler SystemsYounes Abouyaalaspecial
10/04/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00656773-I1Request digital key ↗
08/31/2026B00656795-P1Request digital key ↗
08/31/2026B00656795-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/24/2020321979276Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00656773-I1Open ↗
08/31/2026B00656795-P1Open ↗
08/31/2026B00656795-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00656795-P2Open ↗
08/28/2026B00656795-I1Open ↗
08/24/2026B08051302-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B00656795-P2Open ↗
08/28/2026B00656795-I1Open ↗
08/24/2026B08051302-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/24/2020321979276Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/24/2020321979276Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/24/2020321979276Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00656773-I1Open ↗
08/31/2026B00656795-I1Open ↗
08/31/2026B00656795-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/24/2020321979276Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/24/2020321979276Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/21/2020321979276Open ↗