← Back
Multi-story retail building (2+)
698 MADISON AVENUE
MANHATTAN · BIN 1040907
💬 Discuss this project
1879Year Built
5Stories
K2Building Class
C5-1Zoning
19,800 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Multi-story retail building (2+) · Owner of record: NTB 2 LLC · 2,800 sf lot · 7.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof18p · 6 filings · 20 docs
Floor 614p · 4 filings · 20 docs
Floor 523p · 7 filings · 20 docs
Floor 49p · 2 filings · 20 docs
Floor 315p · 6 filings · 20 docs
Floor 210p · 2 filings · 20 docs
Floor 125p · 8 filings · 20 docs
Cellar3p · 1 filing · 20 docs
Basement4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R A COHEN ASSOC5607/08/2026
700 MADISON PARTNERS203/22/2026
NEW 700 MADISON PARTNERS LLC603/21/2026
700 MADISON PARTNERSC OR A COHEN403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/13/2018$10.0M—— → —$505/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS3803/21/2026
SPARC FIRE PROTECTION ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JKT CONSTRUCTION INCGeneral Contractor1207/08/2026
SOURCE ELECTRIC INCElectrical103/22/2026
A + SPRINKLER CORPFire Protection107/08/2026
BRIAN EGANElectrical103/21/2026
A. PILATO PLUMBING LLCPlumbing107/08/2026
A PLUS PLUMBING CORPPlumbing107/08/2026
UNITED FIRE PROT CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC81741607/06/2026
ALAN D MARCUS, PE1761112/11/2023
THE EIPEL ENGINEERING GRO2714104/03/2023
SPARC FIRE PROTECTION ENG6362103/04/2020
Building Lifecycle
All (88)Filed (23)Permit Issued (12)Signed Off (8)Violation (9)Inspection (6)Special Inspection (30)
07/09/2026
Signed off — Alteration
Demolition of non load bearing partitions, removal of convenience stair, removal of dumb waiter and related work on the basement, 1st - 6th floors & roof as indicated on architectural drawings.
M00817997-I1
07/07/2026
Signed off — Alteration
Architectural changes (interior renovation) on the cellar, 1st thru 6th floors & roof as indicated on drawings.
M00879754-I1
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
07/07/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
07/07/2026
Special inspection requirement — Final
Ryan Hansen
07/07/2026
Special inspection requirement — Final
Ryan Hansen
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/07/2026
Special inspection requirement — Sprayed fire-resistant materials
Ryan Hansen
07/06/2026
Filed — Alteration
Architectural changes (interior renovation) on the cellar, 1st thru 6th floors & roof as indicated on drawings.
M00879754-P2
07/06/2026
Filed — Alteration
Demolition of non load bearing partitions, removal of convenience stair, removal of dumb waiter and related work on the basement, 1st - 6th floors & roof as indicated on architectural drawings.
M00817997-P1
07/06/2026
Filed — Alteration
Sprinkler changes (interior renovation, booster pump, sprinkler/siamese connection) on the cellar, 1st thru 6th floors as indicated on drawings.
M00879818-P4
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/22/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
06/22/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
06/17/2026
Special inspection requirement — Final
Ryan Hansen
06/17/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/17/2026
Special inspection requirement — Final
Ryan Hansen
06/17/2026
Special inspection requirement — Sprayed fire-resistant materials
Ryan Hansen
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
03/13/2026
Signed off — Alteration
M00879796-I1
03/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
02/20/2026
Special inspection requirement — Heating Systems
Ryan Hansen
02/20/2026
Special inspection requirement — Mechanical Systems
Ryan Hansen
02/20/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Ryan Hansen
02/20/2026
Special inspection requirement — Final
Ryan Hansen
02/19/2026
Filed — Alteration
Sprinkler changes (interior renovation, booster pump, sprinkler/siamese connection) on the cellar, 1st thru 6th floors as indicated on drawings.
M00879818-P3
02/19/2026
Filed — Alteration
M00879796-P2
01/28/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Ryan Hansen
01/28/2026
Special inspection requirement — Final
Ryan Hansen
01/28/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
01/28/2026
Special inspection requirement — Mechanical Systems
Ryan Hansen
01/28/2026
Special inspection requirement — Heating Systems
Ryan Hansen
06/27/2024
Permit issued — General Construction
M00879754-I1-GC
06/21/2024
Signed off — Alteration
Removal of mechanical units & associated ductwork on the basement, 1st thru 6th floors & roof as indicated on mechanical drawings.
M00820189-I1
05/15/2024
Signed off — Alteration
Storefront modifications (John Lobb) on the 1st floor as indicated on drawings.
M00865472-I1
04/11/2024
Filed — Alteration
Plumbing changes (interior renovation) on the cellar, 1st thru 6th floors as indicated on drawings.
M00879810-P2
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/13/2023
Special inspection requirement — Final
Ryan Hansen
12/11/2023
Filed — Alteration
M00879796-P1
12/11/2023
Filed — Alteration
Plumbing changes (interior renovation) on the cellar, 1st thru 6th floors as indicated on drawings.
M00879810-P1
12/11/2023
Filed — Alteration
Structural changes (interior renovation) on the 1st, 2nd 4th thru 6th floor and roof as indicated on drawings.
M00879764-P1
12/11/2023
Filed — Alteration
Architectural changes (interior renovation) on the cellar, 1st thru 6th floors & roof as indicated on drawings.
M00879754-P1
12/11/2023
Filed — Alteration
Sprinkler changes (interior renovation, booster pump, sprinkler/siamese connection) on the cellar, 1st thru 6th floors as indicated on drawings.
M00879818-P2
10/23/2023
Signed off — Alteration
Removal of plumbing fixtures on the basement, 1st - 6th floors as indicated on plumbing drawings.
M00818002-I1
10/20/2023
Filed — Alteration
Sprinkler changes (interior renovation, booster pump, sprinkler/siamese connection) on the cellar, 1st thru 6th floors as indicated on drawings.
M00879818-P1
10/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2023
Permit issued — General Construction
M00865472-I1-GC
08/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2023
Filed — Alteration
Storefront modifications (John Lobb) on the 1st floor as indicated on drawings.
M00865472-I1
08/28/2023
Signed off — Alteration
Demolition of convenience stair, removal of dumb waiter and slab infill on the basement, 1st thru 3rd floors as indicated on structural drawings.
M00818012-I1
08/11/2023
Permit issued — Structural
M00879764-I1-ST
08/01/2023
Permit issued — Sprinklers
M00879818-I1-EW-SP
08/01/2023
Permit issued — Plumbing
M00879810-I1-PL
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJKT CONSTRUCTION INC06/27/2024
DOB NOWGeneral ConstructionSigned-offJKT CONSTRUCTION INC08/31/2023
DOB NOWStructuralPermit IssuedJKT CONSTRUCTION INC08/11/2023
DOB NOWSprinklersSigned-offA + SPRINKLER CORP08/01/2023
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP08/01/2023
DOB NOWMechanical SystemsSigned-offJKT CONSTRUCTION INC07/27/2023
DOB NOWGeneral ConstructionSigned-offJKT CONSTRUCTION INC07/26/2023
DOB NOWPlumbingSigned-offA. PILATO PLUMBING LLC04/07/2023
DOB NOWGeneral ConstructionSigned-offJKT CONSTRUCTION INC04/06/2023
DOB NOWStructuralSigned-offJKT CONSTRUCTION INC04/05/2023
DOB NOWMechanical SystemsSigned-offJKT CONSTRUCTION INC04/05/2023
DOB NOWSprinklersSigned-offUNITED FIRE PROT CORP06/09/2020
BISOTISSUEDKEVO CONSTRUCTION INC12/03/2020
BISOTISSUEDHANDY MEN OF NYC INC07/25/2017
BISPLISSUEDGW MECHANICAL CORP09/02/2016
BISOTISSUEDCAPITAL IMPROVEMENT SERVICES08/08/2016
BISMHISSUEDCAPITAL IMPROVEMENT SERVICES08/08/2016
BISOTISSUEDPEAK MECHANICAL SOLUTION*07/22/2015
BISOTISSUEDKABACK ENTERPRISES INC07/26/2012
BISMHISSUEDKABACK ENTERPRISES INC07/26/2012
BISOTISSUEDNEW YORK SIGN CONTRACTORS03/31/2009
1 project · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026Signed-offA + SPRINKLER CORP326 heads
1 project · most recent 04/11/2024
Water/Sanitary
FiledStatusContractorScope
04/11/2024Signed-offA PLUS PLUMBING CORPWater/Sanitary
2 projects · most recent 02/08/2024
General Wiring
FiledStatusContractorScope
02/08/2024CompleteSOURCE ELECTRIC INCGeneral Wiring
12/08/2020CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
1 project · most recent 12/11/2023
Steel
FiledStatusContractorScope
12/11/2023Permit IssuedJKT CONSTRUCTION INCSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
07/07/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/07/2026FinalRyan Hansenprogress
07/07/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
07/07/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/07/2026Sprayed fire-resistant materialsRyan Hansenspecial
07/07/2026Post-installed AnchorsRyan Hansenspecial
07/07/2026FinalRyan Hansenprogress
07/07/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
06/22/2026Post-installed AnchorsRyan Hansenspecial
06/22/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/22/2026Sprinkler SystemsRyan Hansenspecial
06/17/2026Sprayed fire-resistant materialsRyan Hansenspecial
06/17/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/17/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
06/17/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
06/17/2026FinalRyan Hansenprogress
06/17/2026FinalRyan Hansenprogress
06/17/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/17/2026Post-installed AnchorsRyan Hansenspecial
02/20/2026Post-installed AnchorsRyan Hansenspecial
02/20/2026FinalRyan Hansenprogress
02/20/2026Mechanical SystemsRyan Hansenspecial
02/20/2026Exhaust and Vent Systems in Plenums and DuctsRyan Hansenspecial
02/20/2026Heating SystemsRyan Hansenspecial
01/28/2026FinalRyan Hansenprogress
Latest 25 of 67.
▾Documents — 273 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch23
08/31/2026M00818002-I1Request digital key ↗
08/31/2026M00817997-I1Request digital key ↗
08/31/2026M00817997-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00277989-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION20
12/29/2020110430926Open ↗
11/16/2020140979458Open ↗
11/02/2020110430926Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit18
08/31/2026M00817997-P1Open ↗
08/28/2026M00879764-P2Open ↗
08/28/2026M00879754-P2Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION9
12/03/2020140979458Open ↗
08/01/2017123075484Open ↗
09/14/2016122840961Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications85
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/31/2026M00817997-P1Open ↗
08/31/2026M00817997-I1Open ↗
08/31/2026M00818012-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/21/2026M00277989-I1Open ↗
09/05/2026M00879754-P2Open ↗
09/02/2026M00820189-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
06/21/2018123551502Open ↗
07/28/2017122840961Open ↗
07/28/2017122840961Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/05/2026M00879754-P2Open ↗
09/02/2026M00820189-I1Open ↗
09/01/2026M00817997-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/16/2020140979458Open ↗
06/27/2017123075484Open ↗
07/29/2016122840961Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/28/2017123075484Open ↗
07/29/2016122840961Open ↗
08/04/2015122472163Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/08/2012121163034Open ↗
07/27/2012121163034Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/16/2020140979458Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/16/2020140979458Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/10/2017122840961Open ↗
04/26/2017122840961Open ↗
07/29/2016122840961Open ↗
▸BISEQUIPMENT USE PERMITS2
08/20/2012121163034Open ↗
08/07/2012121163034Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
08/20/2012121163034Open ↗
08/07/2012121163034Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/08/2019122835138Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
06/21/2018123551502Open ↗
07/29/2016122840961Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
08/31/2026M00817997-I1Open ↗
08/31/2026M00817997-P1Open ↗
08/31/2026M00818012-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
11/16/2020140979458Open ↗
06/21/2018123551502Open ↗
06/27/2017123075484Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/20/2009110430926Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
06/21/2018123551502Open ↗
07/28/2017122840961Open ↗
07/28/2017122840961Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/28/2020123075484Open ↗
07/28/2017122840961Open ↗
06/27/2017122840961Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/04/2021140979458Open ↗
11/16/2020140979458Open ↗
08/28/2020123075484Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2021140979458Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/04/2021140979458Open ↗
11/16/2020140979458Open ↗
08/28/2020123075484Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/04/2021140979458Open ↗
08/28/2020123075484Open ↗
02/08/2019122835138Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL6
11/16/2020140979458Open ↗
06/28/2017123075484Open ↗
07/29/2016122840961Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
11/16/2020140979458Open ↗
08/28/2020123075484Open ↗
02/08/2019122835138Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/04/2021140979458Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET8
06/21/2018123551502Open ↗
06/27/2017123075484Open ↗
07/29/2016122840961Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION1
09/24/2015122472163Open ↗
▸BISBOROUGH INTAKE FORM1
02/08/2019122835138Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/16/2020140979458Open ↗
▸Other Documents13
▸DOB NOWProof of Historic Building10
08/28/2026M00879754-P2Open ↗
08/13/2026M00865472-I1Open ↗
08/13/2026M00879754-P1Open ↗
Showing 3 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/27/2012121163034Open ↗
07/27/2012121163034Open ↗
07/27/2012121163034Open ↗