One story - permanent living quarter
7-17 LEGGETT PLACE
QUEENS · Whitestone-Beechhurst · BIN 4102775
💬 Discuss this project
1950Year Built
1.67Stories
A2Building Class
R2AZoning
1,078 sfGross Floor Area
1Units
One story - permanent living quarter · 4,180 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
StructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
AtticUnder Construction1 filing · 20 docs
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
Site & exteriorUnder Construction1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2017$640K—— → —$594/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C304/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNO EQUIPMENT AND DEVELOPGeneral Contractor204/09/2026
APOLLO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN E. FLYNN, PE, PC2837104/01/2025
FRANK J. QUATELA, ARCHITE1632204/01/2025
Building Lifecycle
All (43)Filed (3)Permit Issued (3)Inspection (3)Objection (6)Special Inspection (28)
06/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2026
Permit issued — Plumbing
Q01187309-S1-PL
03/25/2026
Permit issued — Structural
Q01187309-I1-GC-CX
03/20/2026
Permit issued — Construction Fence
Q01189972-I1-FN
08/13/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/28/2025
Objection resolved — Addressed
05/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FRANK QUATELA
04/22/2025
Objection raised — Plumbing
04/22/2025
Objection raised — Cost
04/22/2025
Objection raised — Plumbing
04/01/2025
Filed — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL TO EXISTING TWO STORY AND CELLAR, ONE-FAMILY DWELLING. INTERIOR RENOVATION. NEW PARTITIONS, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, AND NEW HVAC AS PER PLAN
Q01187309-I1
04/01/2025
Filed — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL TO EXISTING TWO STORY AND CELLAR, ONE-FAMILY DWELLING. INTERIOR RENOVATION. NEW PARTITIONS, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, AND NEW HVAC AS PER PLAN
Q01187309-S1
03/25/2025
Filed — Alteration
Q01189972-I1
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
03/21/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
03/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
02/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
02/26/2025
Special inspection requirement — Structural Wood Frame
FRANK QUATELA
02/26/2025
Special inspection requirement — Final
FRANK QUATELA
02/26/2025
Special inspection requirement — Footing and Foundation
FRANK QUATELA
02/26/2025
Special inspection requirement — Fenestration areas
FRANK QUATELA
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
02/26/2025
Special inspection requirement — Metering
FRANK QUATELA
02/26/2025
Special inspection requirement — Concrete - Cast-In-Place
FRANK QUATELA
02/26/2025
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
02/26/2025
Special inspection requirement — Permanent certificate
FRANK QUATELA
02/26/2025
Special inspection requirement — Maintenance information
FRANK QUATELA
02/26/2025
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
02/26/2025
Special inspection requirement — Protection of exposed foundation insulation
FRANK QUATELA
02/26/2025
Special inspection requirement — Ventilation and air distribution system
FRANK QUATELA
02/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
02/26/2025
Special inspection requirement — Insulation placement and R values
FRANK QUATELA
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
02/26/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
02/26/2025
Special inspection requirement — Mechanical Systems
FRANK QUATELA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAPOLLO PLBG & HTG INC03/27/2026
DOB NOWStructuralPermit IssuedDNO EQUIPMENT AND DEVELOP03/25/2026
DOB NOWConstruction FencePermit IssuedDNO EQUIPMENT AND DEVELOP03/20/2026
1 project · most recent 04/01/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/01/2025Permit IssuedDNO EQUIPMENT AND DEVELOPHeating and Air Conditioning Systems
Heat / Cool
__Junk__ AOU36RLXFZH 3 tons · Condensing Unit ×1
1 project · most recent 04/01/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/01/2025Permit IssuedAPOLLO PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Permit IssuedJRS ELECTRIC INCGeneral Wiring
1 project · most recent 04/01/2025
Wood
FiledStatusContractorScope
04/01/2025Permit IssuedAPOLLO PLBG & HTG INCWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFRANK QUATELAspecial
03/21/2025Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
03/21/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
03/21/2025Energy Code Compliance InspectionsFRANK QUATELAprogress
03/21/2025HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
02/26/2025Energy Code Compliance InspectionsFRANK QUATELAprogress
02/26/2025Fire-Resistance Rated ConstructionFRANK QUATELAprogress
02/26/2025Structural Wood FrameFRANK QUATELAprogress
02/26/2025FinalFRANK QUATELAprogress
02/26/2025Footing and FoundationFRANK QUATELAprogress
02/26/2025Fenestration areasFRANK QUATELAenergy_progress
02/26/2025HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
02/26/2025HVAC-R and service water heating equipmentFRANK QUATELAenergy_progress
02/26/2025MeteringFRANK QUATELAenergy_progress
02/26/2025Concrete - Cast-In-PlaceFRANK QUATELAspecial
02/26/2025Air barrier - visual inspectionFRANK QUATELAenergy_progress
02/26/2025HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
02/26/2025Permanent certificateFRANK QUATELAenergy_progress
02/26/2025Maintenance informationFRANK QUATELAenergy_progress
02/26/2025Fenestration air leakageFRANK QUATELAenergy_progress
02/26/2025Protection of exposed foundation insulationFRANK QUATELAenergy_progress
02/26/2025Ventilation and air distribution systemFRANK QUATELAenergy_progress
02/26/2025Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
02/26/2025Insulation placement and R valuesFRANK QUATELAenergy_progress
02/26/2025Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
Latest 25 of 28.
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01189972-I1Request digital key ↗
08/20/2026Q01187309-I1Request digital key ↗
08/20/2026Q01187309-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01187309-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01187309-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026Q01187309-S1Open ↗
08/30/2026Q01187309-S1Open ↗
08/23/2026Q01187309-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026Q01187309-S1Open ↗
08/30/2026Q01187309-S1Open ↗
08/23/2026Q01187309-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01189972-I1Open ↗
08/20/2026Q01187309-I1Open ↗
08/20/2026Q01187309-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01187309-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01187309-I1Open ↗
08/20/2026Q01187309-S1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01187309-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01187309-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026Q01187309-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01187309-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01187309-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026Q01187309-I1Open ↗