One story - permanent living quarter
7-39 ELVIRA AVENUE
QUEENS · BIN 4298556
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2XZoning
2,457 sfGross Floor Area
1Units
One story - permanent living quarter · 5,568 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 2Under Construction8p · 2 filings · 20 docs
Floor 1Under Construction9p · 2 filings · 20 docs
BasementUnder Construction8p · 2 filings · 20 docs
Sub-BasementUnder Construction1 filing · 6 docs
Site & exterior31p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/11/2024$1.3M—Private party → Private party$545/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Engineering Professional Service P208/04/2025
Shmuel D. Flaum, Architect506/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEP Designs403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cima ContractorGeneral Contractor104/09/2026
Cima ContractorScaffold104/09/2026
Five Borough NYCFire Protection107/08/2026
Joseph Moehlenhoff P&HPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shmuel D. Flaum4278306/18/2025
Triangle Inspection & Tes7495206/18/2025
A Tech Engineering NYC, P6738104/08/2025
Building Lifecycle
11/19/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
Q01125395-S2-PL
05/19/2026
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
Q01125395-I1-GC-CX
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/17/2025
Permit issued — Plumbing
Q01185444-I1-EW-SP
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedFive Borough NYC12/17/2025
DOB NOWPlumbingPermit IssuedJoseph Moehlenhoff P&H11/19/2025
DOB NOWFoundationPermit IssuedCima Contractor05/19/2025
DOB NOWConstruction FenceSigned-offCima Contractor01/09/2025
1 project · most recent 06/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
06/18/2025Permit IssuedCima ContractorHeating and Air Conditioning Systems
1 project · most recent 08/04/2025
FiledStatusContractorScope
08/04/2025Permit IssuedFive Borough NYC—
2 projects · most recent 08/04/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/04/2025——Water/Sanitary
06/18/2025Permit IssuedJoseph Moehlenhoff P&HGas, Storm, Water/Sanitary
2 projects · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025Permit IssuedIndy Electric—
04/30/2025Permit IssuedIndy ElectricGeneral Wiring
1 project · most recent 06/18/2025
Concrete Masonry
FiledStatusContractorScope
06/18/2025Permit IssuedJoseph Moehlenhoff P&HConcrete, Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/04/2025Fire-Resistant Penetrations and Joints—special
08/04/2025Sprinkler Systems—special
06/17/2025Air barrier - visual inspectionShmuel Flaumenergy_progress
06/17/2025Concrete - Cast-In-PlaceShmuel Flaumspecial
06/17/2025Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
06/17/2025Fire-Resistant Penetrations and JointsShmuel Flaumspecial
06/17/2025MasonryShmuel Flaumspecial
06/17/2025Mechanical SystemsShmuel Flaumspecial
06/17/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShmuel Flaumspecial
06/17/2025Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
06/17/2025Subgrade InspectionsRajasekhar Sakhamurispecial
06/17/2025Subsurface Conditions – Fill Placement & In-Place DensityRajasekhar Sakhamurispecial
06/17/2025Energy Code Compliance InspectionsShmuel Flaumprogress
06/17/2025FinalRajasekhar Sakhamuriprogress
06/17/2025Fire-Resistance Rated ConstructionShmuel Flaumprogress
06/17/2025Footing and FoundationShmuel Flaumprogress
06/17/2025PreliminaryShmuel Flaumprogress
06/17/2025Structural Wood FrameShmuel Flaumprogress
06/17/2025Air barrier — testing Shmuel Flaumenergy_progress
06/17/2025HVAC-R and service water heating equipmentShmuel Flaumenergy_progress
06/17/2025MeteringShmuel Flaumenergy_progress
06/17/2025HVAC-R and service water piping design and insulationShmuel Flaumenergy_progress
06/17/2025Ventilation and air distribution systemShmuel Flaumenergy_progress
06/17/2025HVAC-R and service water heating system controlsShmuel Flaumenergy_progress
06/17/2025Insulation placement and R valuesShmuel Flaumenergy_progress
Latest 25 of 66.
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account