← Back
Two stories - detached, small or mid-size
7 CRESTON STREET
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5083093
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3XZoning
1,192 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC409/28/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KCM PLUMBING & HEATING COPlumbing107/08/2026
Building Lifecycle
All (20)Filed (4)Permit Issued (1)Signed Off (1)Inspection (2)Special Inspection (12)
10/10/2023
Signed off — Alteration
OIL TO GAS CONVERSION WITH THE INSTALLATION OF NEW GAS FIXTURES IN THE CELLAR AND FIRST FLOOR.
S00841183-I1
10/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
10/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
10/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
10/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
09/28/2023
Filed — Alteration
OIL TO GAS CONVERSION WITH THE INSTALLATION OF NEW GAS FIXTURES IN THE CELLAR AND FIRST FLOOR.
S00841183-P3
08/30/2023
Filed — Alteration
OIL TO GAS CONVERSION WITH THE INSTALLATION OF NEW GAS FIXTURES IN THE CELLAR AND FIRST FLOOR.
S00841183-P2
08/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
08/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
08/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
08/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
08/24/2023
Filed — Alteration
OIL TO GAS CONVERSION WITH THE INSTALLATION OF NEW GAS FIXTURES IN THE CELLAR AND FIRST FLOOR.
S00841183-P1
08/11/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
08/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
08/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
08/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
07/19/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
06/22/2023
Permit issued — Plumbing
S00841183-I1-PL
03/17/2023
Filed — Alteration
OIL TO GAS CONVERSION WITH THE INSTALLATION OF NEW GAS FIXTURES IN THE CELLAR AND FIRST FLOOR.
S00841183-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO06/22/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/11/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/19/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/02/2023Energy Code Compliance InspectionsSteven Savinoprogress
10/02/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
10/02/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
10/02/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/28/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
08/28/2023Energy Code Compliance InspectionsSteven Savinoprogress
08/28/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/28/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
08/10/2023Energy Code Compliance InspectionsSteven Savinoprogress
08/10/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
08/10/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/10/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00841183-I1Request digital key ↗
08/23/2026S00841183-P1Request digital key ↗
08/23/2026S00841183-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S00841183-I1Open ↗
09/01/2026S00841183-I1Open ↗
08/31/2026S00841183-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00841183-I1Open ↗
08/23/2026S00841183-P2Open ↗
08/23/2026S00841183-P1Open ↗
Showing 3 of 4 on file for this type