← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
City Point Condominium
7 DEKALB AVENUE · BIN 3397861
💬 Discuss this project
2011Year Built
50Stories
RMBuilding Class
C6-4.5Zoning
1,137,013 sfGross Floor Area
696Units
LL97 CoveredRent Stabilized71 Open Violations 67 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 113,202 sf lot · 10.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 55p · 1 filing · 20 docs
Floor 445p · 5 filings · 20 docs
Floor 3Under Construction39p · 6 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 1Under Construction106p · 18 filings · 20 docs
Mezzanine3p · 3 filings · 20 docs
CellarUnder Construction68p · 14 filings · 20 docs
Sub-Cellar6p · 4 filings · 20 docs
Sub-BasementUnder Construction4p · 1 filing · 6 docs
6 jobs · most recent 06/23/2026
Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems Associated Ducts and Piping Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026——Ventilation Systems
Ventilation
Parker SMOG-HOG PSG-23-2 8,000 CFM ×1
Pennbarry MXI245 12,570 CFM · Kitchen Exhaust ×1
06/26/2025Permit IssuedALL AMERICAN CONSTRUCTIONHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane GEHK072 79,100 BTU · Furnace ×1
Ventilation
Greenheck SP-B150 125 CFM · Exhaust Fan ×1
06/09/2025Permit IssuedARTESA LLCHeating and Air Conditioning Systems
Heat / Cool
Florida Heat Pump CL024 800 CFM · Wshp ×1
06/05/2024Signed-offGALCON ENTERPRISES INCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Florida Heat Pump LV036-4HZ 3 tons · Wshp ×4
LV060-4HZ 5 tons · Wshp ×2
LV048-4HZ 4 tons · Wshp ×1
Trane EXHG03647A4KB0BLH0J11925100000000000012A 3 tons · Wshp ×6
GEHG06047A4KB0BLH0J11025100000000000011A 5 tons · Wshp ×4
EXHG03647A4KB0BRH0J11925100000000000012A 3 tons · Wshp ×2
GEHG04847A4KB0BRH0J11025100000000000011A 4 tons · Wshp ×2
Ventilation
Greenheck AX-103-275-0917-A250 27,300 CFM · Exhaust Fan ×1
BSQ-360 14,000 CFM · Exhaust Fan ×1
CSP-A200 150 CFM · Exhaust Fan ×1
SQ-100-VG 1,050 CFM · Exhaust Fan ×1
BSQ-360-100-X 14,000 CFM · Exhaust Fan ×2
CSP-A200-QD 150 CFM · Exhaust Fan ×2
QEI-36-200-250-HTUL 27,300 CFM · Exhaust Fan ×2
SQ-100-VG-X 1,050 CFM · Exhaust Fan ×2
Ducts & Piping
N/A n/a 1 BTU · Ductwork ×3
04/06/2024Signed-offARTESA LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin W.GC.H .060.K.1.LS.G.B.C. 5 tons · Heat Pump Outdoor ×1
07/19/2022Permit IssuedSTEADFAST DEVELOPMENT ANDRefrigeration Systems
Refrigeration
Weather-Pak LEL0155AS6AEAB0200 15,400 BTU · Refrigeration Unit ×1
8 jobs · most recent 07/10/2026
Sprinkler System
FiledStatusContractorScope
07/10/2026Permit IssuedMETRO FIRE PROTECTION INCSprinkler System
05/27/2026Signed-offFIVE BOROUGH NYC LLCSprinkler System
06/26/2025Signed-offCAPITOL FIRE SPRINKLER COSprinkler System
06/09/2025Signed-offFIVE BOROUGH NYC LLCSprinkler System
06/05/2024Signed-offCAPITOL FIRE SPRINKLER COSprinkler System
05/13/2024Signed-offADVANCED PLBG, MECH & SPRSprinkler System
07/03/2023Permit IssuedNEW YORK STANDARD MECH COSprinkler System
11/18/2020Signed-offFLYTIGER PLB & HTG LTD9 heads
8 jobs · most recent 07/10/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/10/2026Permit IssuedA & E MECHANICAL CORPGas, Water/Sanitary
05/27/2026Signed-offSHAW MECHANICAL INCWater/Sanitary
06/26/2025Signed-offSAFEPIPE PLUMBING INCWater/Sanitary
06/05/2024Signed-offBEDROCK PLBG. & HTG., INCWater/Sanitary
09/27/2022Signed-offSKINNER PLUMBING & HEATINGas
04/29/2022——Water/Sanitary
10/07/2021Permit IssuedPINNACLE PLBG & HTG CORPGas
11/18/2020Signed-offFLYTIGER P & H LTDGas
25 jobs · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026CompleteSIGNS CAD CORP—
06/22/2026Permit IssuedAXON ELEC'L CONTRG CORPGeneral Wiring
03/30/2026Permit IssuedPRECISION ELECL CONT CORPGeneral Wiring
01/09/2026CompleteREDGRAVE ELECTL MAINTNCEGeneral Wiring
01/02/2026CompleteSIGNS CAD CORP—
01/02/2026CompleteSIGNS CAD CORP—
09/17/2025Permit IssuedAXON ELEC'L CONTRG CORPGeneral Wiring
06/13/2025Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
05/29/2025CompletePRECISION ELECL CONT CORPGeneral Wiring
04/01/2025CompleteREAL POWER ELECTRIC INCGeneral Wiring
03/19/2025Permit IssuedAXON ELEC'L CONTRG CORP1 meters, 1 new_meters
10/03/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
08/23/2024CompleteAXON ELEC'L CONTRG CORPGeneral Wiring
08/09/2024CompleteSIGNS CAD CORP—
05/14/2024Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
3 jobs · most recent 06/26/2025
Steel Concrete
FiledStatusContractorScope
06/26/2025Signed-offCAPITOL FIRE SPRINKLER CO2 scope_items
06/05/2024Signed-offGALCON ENTERPRISES INCSteel
05/13/2024Signed-offSWEET GROUP OF NY LLCConcrete
Building Lifecycle
All (300)Filed (63)Permit Issued (59)Signed Off (48)Violation (28)Inspection (60)Objection (12)Special Inspection (30)
07/10/2026
Filed — Alteration
Mechanical demolition and new sub-branch ductwork is proposed for existing restaurant space.
B01345697-P1
07/10/2026
Special inspection requirement — Sprinkler Systems
MARYAM RAKSHAN
07/09/2026
Filed — Alteration
Mechanical demolition and new sub-branch ductwork is proposed for existing restaurant space.
B01345697-P2
06/29/2026
Special inspection requirement — Sprinkler Systems
MARYAM RAKSHAN
06/29/2026
Special inspection requirement — Post-installed Anchors
MARYAM RAKSHAN
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
06/23/2026
Filed — Alteration
PROPOSED TO INSTALL NEW KITCHEN EXHAUST HOODS AND PRECIPITATOR AND EXHAUST DUCT AT CELLAR AND FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01416332-I1
06/12/2026
Special inspection requirement — Final
Tianchen Hu
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
06/12/2026
Special inspection requirement — Mechanical Systems
Tianchen Hu
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
06/10/2026
Signed off — Alteration
Plumbing work filed herewith as indicated on drawings.
B01307038-I1
06/10/2026
Signed off — Alteration
Plumbing work filed herewith as indicated on drawings.
B01307038-S1
05/27/2026
Filed — Alteration
Plumbing work filed herewith as indicated on drawings.
B01307038-P2
05/27/2026
Special inspection requirement — Maintenance information
GEORGE ANDERSEN
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
05/27/2026
Special inspection requirement — Mechanical Systems
GEORGE ANDERSEN
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
05/27/2026
Special inspection requirement — Final
GEORGE ANDERSEN
05/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE ANDERSEN
05/21/2026
Violation issued (HPD, open)
B
05/21/2026
Violation issued (HPD, open)
B
05/21/2026
Violation issued (HPD, open)
C
05/21/2026
Violation issued (HPD, open)
B
05/21/2026
Violation issued (HPD, open)
A
05/20/2026
Signed off — Alteration
Plumbing work filed herewith as indicated on drawings.
B01307038-S2
05/19/2026
Signed off — Alteration
Mechanical work for tenant space as shown on plans
B01016826-S2
05/11/2026
Signed off — Alteration
Mechanical work for tenant space as shown on plans
B01016826-I1
05/08/2026
Violation issued (HPD, closed)
A
05/07/2026
Signed off — Alteration
ALTERATION OF EXISTING STOREFRONT, AND PARTITIONS. INSTALLATION OF NEW STORE FRONT DOOR, RAMP AND STAIRS.. NO CHANGE TO EGRESS, USE OR OCCUPANCY
B01190632-I1
05/07/2026
Filed — Alteration
Plumbing work filed herewith as indicated on drawings.
B01307038-P1
04/27/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
04/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2026
Permit issued — Mechanical Systems
B01345697-S2-MS
03/11/2026
Permit issued — Plumbing
B01345697-S1-PL
03/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/09/2026
Permit issued — Sprinklers
B01345697-S3-EW-SP
03/03/2026
Permit issued — General Construction
B01345697-I1-GC
02/23/2026
Signed off — Alteration
Modification of plumbing system for tenant space
B01262462-S2
02/23/2026
Signed off — Alteration
Modification of plumbing system for tenant space
B01262462-S1
02/10/2026
Signed off — Alteration
Application filed for partial interior demolition of existing restaurant space. Removal of non-bearing partitions and ceiling finishes. No change to use, egress or occupancy.
B01308278-I1
02/06/2026
Filed — Alteration
Mechanical demolition and new sub-branch ductwork is proposed for existing restaurant space.
B01345697-S1
02/06/2026
Filed — Alteration
Mechanical demolition and new sub-branch ductwork is proposed for existing restaurant space.
B01345697-S2
02/06/2026
Filed — Alteration
Mechanical demolition and new sub-branch ductwork is proposed for existing restaurant space.
B01345697-S3
02/05/2026
Signed off — Alteration
Modification of plumbing system for tenant space
B01262462-I1
02/05/2026
Signed off — Alteration
Application filed for partial interior demolition of existing restaurant space. Removal of non-bearing partitions and ceiling finishes. No change to use, egress or occupancy.
B01308278-S1
02/02/2026
Filed — Alteration
Mechanical demolition and new sub-branch ductwork is proposed for existing restaurant space.
B01345697-I1
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
MARYAM RAKSHAN
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
01/20/2026
Permit issued — Plumbing
B01307038-S2-PL
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACADIA REALTY TRUST25408/29/2026
SIGNEXPO507/08/2026
J L SERVICE NYC407/08/2026
TARGET1004/09/2026
ACRS 11 LLC603/22/2026
HOUSING PRESERVATION & DE203/22/2026
MARCH ASSOC CONSTR IN103/22/2026
MEMCO LLC403/22/2026
HPD 806403/22/2026
ADVANCED CONTRACTING SOLU503/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES9803/21/2026
JRK CREATIVE1003/21/2026
NEXUS CONSULTING NYC, INC203/21/2026
PAUL FUSCO CONSULTING603/21/2026
A1 EXPEDITING SERVICE CORP.603/21/2026
DVA Advisors3003/21/2026
NATIONAL MAINTENANCE403/21/2026
VAN LEEUWEN ICE CREAM403/21/2026
DOMINION EXPEDITING803/21/2026
ABCO-PEERLESS SPRINKLER603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHIMENTI CONSTRUCTION COGeneral Contractor1207/08/2026
LORICH CONSTRUCTION MANAGEMENTGeneral Contractor807/08/2026
PLAZA CONSTRUCTION LLCGeneral Contractor807/08/2026
ARTESA LLCGeneral Contractor707/08/2026
STEADFAST DEVELOPMENT ANDGeneral Contractor607/08/2026
CAPITOL FIRE SPRINKLER COFire Protection507/08/2026
A. BONADUCE, INCGeneral Contractor504/09/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor407/08/2026
FIVE BOROUGH NYCPlumbing403/22/2026
SWEET GROUP OF NY LLCGeneral Contractor407/08/2026
SPIRELLI ELECTRIC INCElectrical303/22/2026
BEDROCK PLBG. & HTG., INCPlumbing307/08/2026
MAUCERI SIGNScaffold307/08/2026
GALCON ENTERPRISES INCGeneral Contractor304/09/2026
FLYTIGER P & H LTDPlumbing307/08/2026
ALL AMERICAN CONSTRUCTIONGeneral Contractor307/08/2026
ACM CONSULTING CORPGeneral Contractor303/21/2026
BUCH CONSTRUCTION, INCGeneral Contractor307/08/2026
KEDC CORPGeneral Contractor307/08/2026
LW INTERIOR REMODELING INGeneral Contractor204/09/2026
HORIZON RETAIL CONSTRUCTIGeneral Contractor204/09/2026
KING, ARTHURElectrical203/21/2026
IDDC LLCGeneral Contractor207/08/2026
FIVE BOROUGH NYC LLCFire Protection207/08/2026
PIMPINELLA, FRANKElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAKSHAN MALEK ASSOCIATES3352507/10/2026
BRIAN ILL DEVELOPMENT LLC1402607/10/2026
NEW AIR SOLUTION INC8418206/23/2026
COLE TECHNOLOGIES/CONTROL12902305/27/2026
GREGORY V. PEROTTO, P.E.947301/13/2026
SPECIAL TESTING & CONSULT1688406/26/2025
CATALPA SPECIAL INSPECTIO2004604/18/2025
MEP INSPECTIONS, INC1102304/18/2025
ALAN MARGOLIN & ASSOC423906/05/2024
JACK GREEN ASSOCIATES422304/19/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedIDDC LLC03/19/2026
DOB NOWPlumbingPermit IssuedA & E MECHANICAL CORP03/11/2026
DOB NOWSprinklersPermit IssuedMETRO FIRE PROTECTION INC03/09/2026
DOB NOWGeneral ConstructionPermit IssuedIDDC LLC03/03/2026
DOB NOWPlumbingSigned-offJAMES CRUZ01/20/2026
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC01/09/2026
DOB NOWGeneral ConstructionSigned-offARTESA LLC01/06/2026
DOB NOWMechanical SystemsSigned-offARTESA LLC01/05/2026
DOB NOWGeneral ConstructionSigned-offA. BONADUCE, INC11/21/2025
DOB NOWPlumbingSigned-offGO GREENER PLUMBING LLC11/20/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC10/23/2025
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT10/09/2025
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT10/09/2025
DOB NOWGeneral ConstructionSigned-offHORIZON RETAIL CONSTRUCTI10/08/2025
DOB NOWMechanical SystemsSigned-offHORIZON RETAIL CONSTRUCTI10/08/2025
DOB NOWGeneral ConstructionSigned-offACM CONSULTING CORP09/17/2025
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO09/17/2025
DOB NOWMechanical SystemsPermit IssuedARTESA LLC09/10/2025
DOB NOWGeneral ConstructionPermit IssuedARTESA LLC09/10/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG08/25/2025
DOB NOWMechanical SystemsPermit IssuedALL AMERICAN CONSTRUCTION08/25/2025
DOB NOWStructuralPermit IssuedALL AMERICAN CONSTRUCTION08/25/2025
DOB NOWGeneral ConstructionPermit IssuedALL AMERICAN CONSTRUCTION08/25/2025
DOB NOWGeneral ConstructionPermit IssuedVANGUARD CONSTRUCTION AND08/15/2025
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC07/31/2025
DOB NOWGeneral ConstructionSigned-offA. BONADUCE, INC05/08/2025
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO05/07/2025
DOB NOWPlumbingSigned-offGO GREENER PLUMBING LLC05/06/2025
DOB NOWMechanical SystemsSigned-offA. BONADUCE, INC05/05/2025
DOB NOWGeneral ConstructionSigned-offARTESA LLC04/23/2025
DOB NOWGeneral ConstructionSigned-offARTESA LLC11/06/2024
DOB NOWMechanical SystemsPermit IssuedARTESA LLC11/06/2024
DOB NOWMechanical SystemsSigned-offJ & L SERVICE NYC INC09/27/2024
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC08/20/2024
DOB NOWSignSigned-offSIGNS CAD CORP07/31/2024
DOB NOWStructuralSigned-offSWEET GROUP OF NY LLC06/11/2024
DOB NOWGeneral ConstructionSigned-offSWEET GROUP OF NY LLC06/10/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND04/26/2024
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND04/25/2024
DOB NOWStructuralSigned-offVANGUARD CONSTRUCTION AND04/25/2024
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 90
DateTypeResultReport
04/27/2026Fail-Final Construction Permit WithdrawalFailView ↗
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2026Fail-Final Construction Permit WithdrawalFailView ↗
04/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 90.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/10/2026Sprinkler SystemsMARYAM RAKSHANspecial
06/29/2026Sprinkler SystemsMARYAM RAKSHANspecial
06/29/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
06/29/2026Post-installed AnchorsMARYAM RAKSHANspecial
06/12/2026HVAC-R and service water piping design and insulationTianchen Huenergy_progress
06/12/2026FinalTianchen Huprogress
06/12/2026Mechanical SystemsTianchen Huspecial
06/12/2026Energy Code Compliance InspectionsTianchen Huprogress
06/12/2026Fire-Resistant Penetrations and JointsTianchen Huspecial
06/12/2026HVAC-R and service water heating equipmentTianchen Huenergy_progress
06/12/2026HVAC-R and service water heating system controlsTianchen Huenergy_progress
05/27/2026FinalGEORGE ANDERSENprogress
05/27/2026Energy Code Compliance InspectionsGEORGE ANDERSENprogress
05/27/2026Duct leakage testing, insulation and designGEORGE ANDERSENenergy_progress
05/27/2026Maintenance informationGEORGE ANDERSENenergy_progress
05/27/2026Mechanical SystemsGEORGE ANDERSENspecial
05/27/2026Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
01/26/2026Energy Code Compliance InspectionsBRIAN ILLprogress
01/26/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
01/26/2026Duct leakage testing, insulation and designMARYAM RAKSHANenergy_progress
01/16/2026Smoke Control Systems TestingMARYAM RAKSHANspecial
01/16/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
01/14/2026Interior lighting powerGregory Perottoenergy_progress
01/14/2026Mechanical SystemsGregory Perottospecial
01/14/2026FinalGregory Perottoprogress
Latest 25 of 150.
▾Documents — 4,794 on file (BIS + DOB NOW)
▸Plans & Drawings168
▸DOB NOWPlans/Sketch141
09/03/2026B00028769-I1Request digital key ↗
09/01/2026B00578159-P1Request digital key ↗
09/01/2026B00578159-I1Request digital key ↗
Showing 3 of 141 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly9
09/02/2026B00117665-I1Request digital key ↗
09/02/2026B00154436-I1Request digital key ↗
09/02/2026B00163863-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/02/2026B00237405-I1Request digital key ↗
09/02/2026B00277966-I1Request digital key ↗
09/02/2026B00319476-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00278009-I1Request digital key ↗
09/02/2026B00299609-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/02/2026B00240636-I1Request digital key ↗
09/02/2026B00274533-I1Request digital key ↗
09/02/2026B00253014-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00452178-P1Request digital key ↗
09/01/2026B00452178-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00300298-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits996
▸BISPLAN / WORK APPROVAL APPLICATION471
07/03/2025320373001Open ↗
07/01/2025320373001Open ↗
06/16/2025320373001Open ↗
Showing 3 of 471 on file for this type
▸BISWORK PERMIT APPLICATION332
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 332 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION126
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 126 on file for this type
▸BISPLACE OF ASSEMBLY64
05/29/2024321232974Open ↗
05/23/2024321232974Open ↗
05/23/2024321232046Open ↗
Showing 3 of 64 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications1,173
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION527
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 527 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature166
09/03/2026B00028769-I1Open ↗
09/02/2026B00117665-I1Open ↗
09/02/2026B00154436-I1Open ↗
Showing 3 of 166 on file for this type
▸DOB NOWProgress Inspector Seal & Signature121
09/27/2026B01262462-P1Open ↗
09/27/2026B00753402-I1Open ↗
09/27/2026B01262462-P1Open ↗
Showing 3 of 121 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT109
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 109 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST92
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 92 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature92
09/27/2026B01262462-P1Open ↗
09/27/2026B00753402-I1Open ↗
09/23/2026B01262462-S1Open ↗
Showing 3 of 92 on file for this type
▸BISProfessional and Owner Certification (POC3)17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Trade Schedules & Equipment257
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISSCHEDULE B - PLUMBING57
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 57 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA55
03/14/2022321706953Open ↗
03/11/2021321937491Open ↗
10/08/2020320373001Open ↗
Showing 3 of 55 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT28
02/16/2022321924940Open ↗
02/24/2021340681738Open ↗
02/24/2021340681738Open ↗
Showing 3 of 28 on file for this type
▸BISEQUIPMENT USE PERMITS19
02/16/2022321924940Open ↗
02/24/2021340681738Open ↗
02/24/2021340681738Open ↗
Showing 3 of 19 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection16
▸BISTENANT PROTECTION PLAN AND NOTES6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWTenant Protection Plan6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISST-1 Street Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos201
▸DOB NOWOER: Notice to Proceed96
08/31/2026B00595278-I1Open ↗
08/31/2026B00600844-I1Open ↗
08/31/2026B00600817-I1Open ↗
Showing 3 of 96 on file for this type
▸DOB NOWOER: Notice of Satisfaction75
08/31/2026B00595278-I1Open ↗
08/31/2026B00600844-I1Open ↗
08/31/2026B00600817-I1Open ↗
Showing 3 of 75 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION11
09/30/2025321848051Open ↗
05/29/2025321843797Open ↗
05/28/2025321924940Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance218
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS135
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 135 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS48
08/16/2021321950956Open ↗
06/23/2021320373001Open ↗
11/06/2020340681738Open ↗
Showing 3 of 48 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
08/16/2022321638714Open ↗
02/16/2022321924940Open ↗
02/16/2022321924940Open ↗
Showing 3 of 25 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/31/2026B00600844-I1Open ↗
08/31/2026B00600817-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports140
▸BISTECHNICAL REPORT: RESPONSIBILITY72
11/17/2022321372803Open ↗
09/28/2022321372803Open ↗
09/15/2022321372803Open ↗
Showing 3 of 72 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs496
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST224
07/16/2024321363528Open ↗
01/09/2023321937491Open ↗
03/30/2022340339805Open ↗
Showing 3 of 224 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION83
08/16/2022321638714Open ↗
08/16/2021321950956Open ↗
Showing 2 of 83 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE61
06/16/2025320373001Open ↗
01/17/2025320373001Open ↗
01/13/2025320373001Open ↗
Showing 3 of 61 on file for this type
▸BISADMINISTRATIVE OBJECTIONS52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISCCD1-Construction Code Determination11
03/07/2023320373001Open ↗
Showing 1 of 11 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL4
05/31/2025321485095Open ↗
05/31/2025320428710Open ↗
03/21/2024321638714Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership271
▸BISCOST AFFIDAVIT250
08/16/2022321638714Open ↗
03/14/2022321706953Open ↗
11/06/2020340681738Open ↗
Showing 3 of 250 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
06/26/2024321363528Open ↗
03/21/2024321638714Open ↗
03/21/2024321649196Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Filing & Intake Forms594
▸BISADDITIONAL INFORMATION243
10/22/2025320373001Open ↗
07/24/2024320373001Open ↗
09/11/2023320373001Open ↗
Showing 3 of 243 on file for this type
▸BISEFILING COVER SHEET197
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 197 on file for this type
▸BISBOROUGH INTAKE FORM121
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 121 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸Other Documents165
▸DOB NOWDHCR Document108
08/31/2026B00595278-P1Open ↗
08/31/2026B00595278-I1Open ↗
08/31/2026B00600844-P1Open ↗
Showing 3 of 108 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION52
10/08/2020320373001Open ↗
Showing 1 of 52 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type