ECB10/20/2005WORK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTION OF THE SECOND FLOOR ISON GOING ILLEGALLY, APPROXIMATELY: 20FT X 45FT. REMEDY: STOP ALL WORK,EXCEPT TO MAKE THE SITE SAFE, OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.