← Back
Walk-up apt, over six families with stores
7 GREENE AVENUE
BROOKLYN · BIN 3059374
💬 Discuss this project
1920Year Built
4Stories
C7Building Class
R6BZoning
5,136 sfGross Floor Area
10Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 7 GREENE AVENUE LLC · 1,890 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof21p · 2 filings · 20 docs
Floor 43p · 1 filing · 10 docs
Floor 33p · 1 filing · 10 docs
Floor 23p · 1 filing · 10 docs
Floor 124p · 2 filings · 20 docs
Cellar22p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7 GREENE AVENUE3707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS609/13/2023
HANSEN ENGINEERING, PC309/07/2023
KDV DESIGNS ARCHITECTS LLC111/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS903/21/2026
TBC & ASSOC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JTJ STUDIO CORPGeneral Contractor603/21/2026
MASTER FIRE MECH CORPGeneral Contractor303/21/2026
PARKSET PLBG CO INCFire Protection107/08/2026
EDSON HTNG & COOLING LLCGeneral Contractor107/08/2026
MUHAN SPACE CORPGeneral Contractor107/08/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
DONOHUE, MICHAELElectrical103/21/2026
PARKSET PLMBG CO.,INCPlumbing107/08/2026
MCCLARIN, LEROYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544909/13/2023
NS ENGINEERING & CONSULTI3652111/21/2022
SY ENGINEERING PLLC5149111/21/2022
Building Lifecycle
All (149)Filed (10)Permit Issued (9)Signed Off (1)Violation (54)Inspection (9)Objection (40)Special Inspection (26)
02/19/2026
Violation issued (FDNY_NOV, closed)
11/29/2024
Violation issued (HPD, closed)
I
06/04/2024
Signed off — Alteration
NEW SPRINKLER HEADS AT THE 1ST FLOOR OPEN COMMERCIAL KITCHEN AS PER BC TABLE 5-1 AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00804837-S5
10/23/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/04/2023
Permit issued — Sprinklers
B00804837-S5-EW-SP
09/29/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/26/2023
Objection resolved — Addressed
09/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
09/21/2023
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
09/13/2023
Filed — Alteration
CREATING A NEW 2-HR RATED ENCLOSURE AROUND EXISTING FURNACE & HOT WATER HEATERS INSTALLED UNDER LAA #310256488 IN THE CELLAR ONLY. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B08016191-P2
09/12/2023
Objection raised — Other
09/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2023
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
09/07/2023
Filed — Alteration
NEW SPRINKLER HEADS AT THE 1ST FLOOR OPEN COMMERCIAL KITCHEN AS PER BC TABLE 5-1 AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00804837-S5
09/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/01/2023
Filed — Alteration
NEW SPRINKLER HEADS AT THE 1ST FLOOR OPEN COMMERCIAL KITCHEN AS PER BC TABLE 5-1 AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00804837-P1
08/29/2023
Permit issued — Structural
B00804837-S4-ST
08/09/2023
Permit issued — Plumbing
B00804837-S1-PL
08/03/2023
Objection raised — Other
08/03/2023
Objection resolved — Addressed
07/20/2023
Filed — Alteration
NEW SPRINKLER HEADS AT THE 1ST FLOOR OPEN COMMERCIAL KITCHEN AS PER BC TABLE 5-1 AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00804837-S4
06/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2023
Permit issued — Mechanical Systems
B00804837-S2-MS
03/20/2023
Permit issued — Plumbing
B00804837-S1-PL
03/14/2023
Filed — Alteration
NEW SPRINKLER HEADS AT THE 1ST FLOOR OPEN COMMERCIAL KITCHEN AS PER BC TABLE 5-1 AS INDICATED ON THE DRAWINGS FILED HEREIN.
B00804837-S2
03/03/2023
Permit issued — General Construction
B00804837-I1-GC
03/02/2023
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
02/24/2023
Objection raised — Other
02/24/2023
Objection resolved — Addressed
02/24/2023
Objection raised — Other
02/24/2023
Objection resolved — Addressed
02/21/2023
Permit issued — Plumbing
B08016191-S1-PL
02/17/2023
Objection raised — Other
02/17/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Other
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Other
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Other
02/16/2023
Objection resolved — Addressed
02/11/2023
Permit issued — General Construction
B08016191-I1-GC
02/10/2023
Objection raised — Other
02/10/2023
Objection resolved — Addressed
02/02/2023
Objection raised — Inspections
02/02/2023
Objection resolved — Addressed
02/02/2023
Objection raised — Admin
02/02/2023
Objection resolved — Addressed
02/02/2023
Objection raised — Scope
02/02/2023
Objection resolved — Addressed
02/02/2023
Objection raised — Scope
02/02/2023
Objection resolved — Addressed
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPARKSET PLBG CO INC10/04/2023
DOB NOWStructuralPermit IssuedMUHAN SPACE CORP08/29/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/09/2023
DOB NOWMechanical SystemsPermit IssuedEDSON HTNG & COOLING LLC04/13/2023
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO03/20/2023
DOB NOWGeneral ConstructionPermit IssuedJTJ STUDIO CORP03/03/2023
DOB NOWPlumbingSigned-offPARKSET PLMBG CO.,INC02/21/2023
DOB NOWGeneral ConstructionPermit IssuedJTJ STUDIO CORP02/11/2023
DOB NOWMechanical SystemsPermit IssuedMASTER FIRE MECH CORP01/13/2023
BISPLISSUEDARANDA PLBG & HTG CORP04/22/2016
BISMHISSUEDHECHO INC01/28/2009
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/08/2008
BISPLISSUEDPRIME PIPING & HEATING IN04/17/2008
BISOTISSUEDVICTORY TIMS LLC04/01/2008
2 projects · most recent 09/07/2023
Associated Ducts and Piping Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/07/2023Permit IssuedMUHAN SPACE CORPAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems—
11/21/2022Permit IssuedMASTER FIRE MECH CORPAssociated Ducts and Piping, Ventilation Systems
Ventilation
Captiveaire NCA24FA 4,500 CFM · Kitchen Exhaust ×3
MODEL # A3-D.500-24D 4,921 CFM · Makeup Air ×2
Ducts & Piping
Captiveaire MODEL # USBI24DD-RM 4,033 CFM · Kitchen Exhaust ×3
1 project · most recent 09/07/2023
FiledStatusContractorScope
09/07/2023Signed-offPARKSET PLBG CO INC6 heads
2 projects · most recent 09/13/2023
Water/Sanitary Storm Gas
FiledStatusContractorScope
09/13/2023Signed-offPARKSET PLMBG CO.,INCStorm, Water/Sanitary
09/07/2023Signed-offAP PLUMBING & HVAC LLCGas, Water/Sanitary
1 project · most recent 03/03/2023
General Wiring
FiledStatusContractorScope
03/03/2023CompleteASKO ELEC CONST & MAIN INGeneral Wiring
1 project · most recent 09/07/2023
Steel
FiledStatusContractorScope
09/07/2023Signed-offPARKSET PLBG CO INCSteel
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/23/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/21/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/21/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
09/21/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
09/11/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/11/2023Tenant Protection Plan Compliance—special
09/11/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
09/05/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
09/05/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/02/2023Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
02/02/2023HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
02/02/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
02/02/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
02/02/2023HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
02/02/2023HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
02/02/2023Maintenance informationEUGENE BIFULCOenergy_progress
01/12/2023FinalEUGENE BIFULCOprogress
01/12/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
01/12/2023Mechanical SystemsEUGENE BIFULCOspecial
11/18/2022Maintenance informationNARI MOTWANIenergy_progress
11/18/2022Electrical motors and elevatorsNARI MOTWANIenergy_progress
11/18/2022Duct leakage testing, insulation and designNARI MOTWANIenergy_progress
11/14/2022Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
11/14/2022FinalDAVIDSON CHRISTMASprogress
11/14/2022Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
11/14/2022Tenant Protection Plan ComplianceSUNGBOM YIspecial
Latest 25 of 26.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08039879-I1Request digital key ↗
08/26/2026B00804837-S4Request digital key ↗
08/26/2026B00804837-S5Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
04/14/2022310184421Open ↗
03/25/2022310184421Open ↗
09/27/2021310184421Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
04/22/2016310105837Open ↗
04/11/2016310105837Open ↗
01/28/2009310295944Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00804837-S1Open ↗
08/26/2026B08016191-I1Open ↗
08/26/2026B08016191-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/06/2026B08039879-I1Open ↗
09/06/2026B08039879-I1Open ↗
09/06/2026B08039879-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/06/2026B08039879-I1Open ↗
09/06/2026B08039879-I1Open ↗
09/06/2026B08039879-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/17/2009310295944Open ↗
02/13/2009310295944Open ↗
01/28/2009310295944Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/26/2009310295944Open ↗
01/28/2009310295944Open ↗
03/21/2008310105837Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/28/2009310295944Open ↗
03/21/2008310105837Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING4
10/17/2008310105837Open ↗
08/12/2008310105837Open ↗
08/06/2008310184421Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/23/2009310295944Open ↗
▸BISEQUIPMENT USE PERMITS1
07/23/2009310295944Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B00804837-S1Open ↗
08/26/2026B08016191-S1Open ↗
08/26/2026B08016191-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/28/2009310295944Open ↗
08/06/2008310184421Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/21/2008310105837Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/12/2022310184421Open ↗
07/22/2009310295944Open ↗
02/17/2009310295944Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/28/2009310295944Open ↗
08/06/2008310184421Open ↗
08/06/2008310184421Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/22/2016310105837Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
05/11/2022310184421Open ↗
11/20/2021310184421Open ↗
02/17/2009310295944Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/11/2022310184421Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
01/28/2009310295944Open ↗
▸BISADDITIONAL INFORMATION1
05/09/2022310184421Open ↗