← Back
Two stories - detached, small or mid-size
7 GRIDLEY AVENUE
STATEN ISLAND · BIN 5175255
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R3AZoning
1,435 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,482 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 23p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Basement5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEVELOPMENT CORP.607/08/2026
BEYER CONSTRUCTION407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1203/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor1507/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
DESIGN PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738309/26/2023
Building Lifecycle
All (68)Filed (9)Permit Issued (11)Signed Off (4)Inspection (12)Objection (2)Special Inspection (30)
10/02/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
10/02/2023
Special inspection requirement — Mechanical Systems
anthony santoro
10/02/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
10/02/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/02/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/02/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/02/2023
Special inspection requirement — Footing and Foundation
anthony santoro
10/02/2023
Special inspection requirement — Final
anthony santoro
10/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
10/02/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
10/02/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/02/2023
Special inspection requirement — Permanent certificate
anthony santoro
10/02/2023
Special inspection requirement — Maintenance information
anthony santoro
10/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
10/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
10/02/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
10/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
10/02/2023
Special inspection requirement — Metering
anthony santoro
10/02/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
10/02/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
10/02/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
10/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/02/2023
Special inspection requirement — Interior lighting power
anthony santoro
10/02/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
10/02/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
10/02/2023
Special inspection requirement — Fenestration areas
anthony santoro
10/02/2023
Special inspection requirement — Air barrier — testing
anthony santoro
09/26/2023
Filed — New Building
PROPOSED 3 STORY 1 FAMILY DWELLING WITH ACCESSORY BUILT-IN TWO CAR GARAGE.
S00634533-P3
09/26/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/06/2023
Signed off — Alteration
Proposed 8' high temporary plywood/OSB Construction Fence with access gate
S00497891-I1
07/05/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00705976-I1
05/15/2023
Filed — New Building
PROPOSED 3 STORY 1 FAMILY DWELLING WITH ACCESSORY BUILT-IN TWO CAR GARAGE.
S00634533-P2
05/10/2023
Signed off — Alteration
INSTALLATION OF NEW 9' WIDE CURB CUT.
S00617418-I1
05/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/03/2023
Signed off — New Building
PROPOSED 3 STORY 1 FAMILY DWELLING WITH ACCESSORY BUILT-IN TWO CAR GARAGE.
S00634533-S1
04/28/2023
Permit issued — Earth Work
S00634533-I1-EA
04/28/2023
Permit issued — Foundation
S00634533-I1-FO
04/28/2023
Permit issued — Structural
S00634533-I1-MS
04/28/2023
Permit issued — Earth Work
S00634533-I1-ST
04/24/2023
Permit issued — Curb Cut
S00617418-I1-CC
04/19/2023
Filed — Alteration
INSTALLATION OF NEW 9' WIDE CURB CUT.
S00617418-I1
12/21/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
12/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2022
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00705976-P1
11/28/2022
Filed — New Building
PROPOSED 3 STORY 1 FAMILY DWELLING WITH ACCESSORY BUILT-IN TWO CAR GARAGE.
S00634533-P1
11/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/31/2022
Permit issued — Plumbing
S00705976-I1-PL
08/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/10/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/21/2022
Permit issued — Plumbing
S55933673-S1-PL
06/17/2022
Permit issued — Construction Fence
S00497891-I1-FN
05/26/2022
Permit issued — Foundation
S00634533-I1-GC
05/17/2022
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00705976-I1
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offBEYER CONSTRUCTION04/28/2023
DOB NOWFoundationSigned-offBEYER CONSTRUCTION04/28/2023
DOB NOWStructuralSigned-offBEYER CONSTRUCTION04/28/2023
DOB NOWEarth WorkSigned-offBEYER CONSTRUCTION04/28/2023
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION04/24/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/31/2022
DOB NOWPlumbingSigned-offDESIGN PLBG & HTG SVC IN06/21/2022
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION06/17/2022
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION05/26/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.03/23/2022
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION02/08/2022
1 project · most recent 09/26/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/26/2023Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 07/11/2022
General Wiring
FiledStatusContractorScope
07/11/2022CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 09/26/2023
Concrete Wood
FiledStatusContractorScope
09/26/2023Signed-offBEYER CONSTRUCTION CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/21/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/02/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/10/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
10/02/2023Ventilation and air distribution systemanthony santoroenergy_progress
10/02/2023Mechanical Systemsanthony santorospecial
10/02/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
10/02/2023Concrete - Cast-In-Placeanthony santorospecial
10/02/2023Subgrade Inspectionsanthony santorospecial
10/02/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
10/02/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
10/02/2023Footing and Foundationanthony santoroprogress
10/02/2023Finalanthony santoroprogress
10/02/2023Fire-Resistance Rated Constructionanthony santoroprogress
10/02/2023Structural Wood Frameanthony santoroprogress
10/02/2023Energy Code Compliance Inspectionsanthony santoroprogress
10/02/2023Permanent certificateanthony santoroenergy_progress
10/02/2023Maintenance informationanthony santoroenergy_progress
10/02/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
10/02/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
10/02/2023Insulation placement and R valuesanthony santoroenergy_progress
10/02/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/02/2023Meteringanthony santoroenergy_progress
10/02/2023Fenestration air leakageanthony santoroenergy_progress
10/02/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
10/02/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
10/02/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/02/2023Interior lighting poweranthony santoroenergy_progress
10/02/2023Protection of exposed foundation insulationanthony santoroenergy_progress
Latest 25 of 56.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00497891-I1Request digital key ↗
08/24/2026S00705976-I1Request digital key ↗
08/24/2026S00705976-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00634533-P2Open ↗
08/13/2026S00634533-P3Open ↗
08/13/2026S00634533-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00634533-I1Open ↗
08/13/2026S00634533-P3Open ↗
08/13/2026S00634533-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00634533-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026S00497891-I1Open ↗
08/24/2026S00705976-I1Open ↗
08/24/2026S00705976-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S00634533-I1Open ↗
09/01/2026S00634533-I1Open ↗
09/01/2026S00634533-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00634533-I1Open ↗
09/01/2026S00634533-I1Open ↗
09/01/2026S00634533-P3Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00634533-P2Open ↗
08/13/2026S00634533-I1Open ↗
08/13/2026S00634533-P3Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00634533-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00634533-P2Open ↗
08/13/2026S00634533-P3Open ↗
08/13/2026S00634533-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00634533-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00634533-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00634533-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00634533-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00634533-P3Open ↗
08/13/2026S00634533-P2Open ↗
08/13/2026S00634533-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00634533-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00634533-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026S00634533-I1Open ↗
08/13/2026S00634533-P2Open ↗
08/13/2026S00634533-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00634533-I1Open ↗
08/13/2026S00634533-P3Open ↗
08/13/2026S00634533-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026S00634533-P2Open ↗
08/22/2026S00634533-P3Open ↗
08/15/2026S00634533-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00634533-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00634533-I1Open ↗