0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction78p · 1 filing · 20 docs
Floor 10Under Construction65p · 1 filing · 20 docs
Floor 9Under Construction76p · 1 filing · 20 docs
Floor 8Under Construction72p · 1 filing · 20 docs
Floor 7Under Construction71p · 1 filing · 20 docs
Floor 6Under Construction71p · 1 filing · 20 docs
Floor 5Under Construction71p · 1 filing · 20 docs
Floor 4Under Construction89p · 1 filing · 20 docs
Floor 3Under Construction92p · 1 filing · 20 docs
Floor 2Under Construction95p · 1 filing · 20 docs
Floor 1Under Construction98p · 1 filing · 20 docs
CellarUnder Construction95p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLASTON DEVELOPMENT3309/13/2026
COSAN CONSTRUCTION209/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREA HERRERA108/18/2026
JRS ENGINEERING SERVICES108/10/2026
TOHFAZ UDDIN PE PC306/05/2026
DAGHER ENGINEERING PLLC606/02/2026
GGA STUDIOS, DPC105/06/2026
LANGAN ENGINEERING204/08/2026
VHB202/25/2026
MCNAMARA SALVIA OF NEW YORK, PC204/24/2024
HILL WEST ARCHITECTS106/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2003/21/2026
SPRING SCAFFOLDING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.E. LEVINE BUILDER INCGeneral Contractor1009/12/2026
COSAN CONSTRUCTION CORPGeneral Contractor209/02/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
FLINT MECHANICAL CORPPlumbing107/08/2026
G.N.T. MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LANGAN ENG, ENV, SURVEYIN1265304/08/2026
AMARACON TESTING & INSPEC5842502/04/2026
MCNAMARA/SALVIA OF NEW YO4970204/24/2024
Building Lifecycle
All (125)Filed (18)Permit Issued (15)Violation (2)Inspection (6)Objection (54)Special Inspection (30)
09/10/2026
Permit issued — General Construction
B00848051-I1-GC
09/01/2026
Permit issued — Supported Scaffold
B01441779-I1-SF
08/21/2026
Objection resolved — Addressed
08/19/2026
Permit issued — Protection and Mechanical Methods
B01444757-I1-PMM
08/18/2026
Filed — Alteration
B01444757-I1
08/18/2026
Objection raised — Other
08/10/2026
Filed — Alteration
supported pipe scaffolding
B01441779-I1
08/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2026
Permit issued — Structural
B00848051-S4-ST
07/22/2026
Special inspection requirement — Maintenance information
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/13/2026
Permit issued — Foundation
B00848051-S3-FO
07/08/2026
Permit issued — General Construction
B00848051-I1-GC
07/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2026
Filed — Alteration
THE SIDEWALK SHED AT THE FRONT OF THE BUILDING, BEHIND T HE BUILDING, AND CLARKSON STREET ELEVATIONS.
B01323698-P3
06/02/2026
Filed — New Building
Foundation work as per plans filed, in conjunction with NB # B00848051-I1
B00848051-S9
05/27/2026
Permit issued — General Construction
B01363363-I1-GC
05/18/2026
Permit issued — General Construction
B01398299-I1-GC
05/15/2026
Permit issued — Support of Excavation
B00848051-S5-SE
05/06/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO ADDRESS VIOLATION #'s: 039553460Y AND 039553464L. SCOPE OF WORK INCLUDES REMOVAL OF REMNANTS FROM PRIOR DEMOLITION ACTIVITIES 20 YEARS AGO AT VARIOUS LOCATIONS AS INDICATED ONPLANS.
B01398299-I1
05/06/2026
Special inspection requirement — Final
LESLEY SCHMERZLER
05/04/2026
Objection resolved — Addressed
04/24/2026
Violation issued (ECB, closed)
Construction
04/24/2026
Violation issued (ECB, closed)
Construction
04/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Saul Shapiro
04/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Saul Shapiro
04/20/2026
Special inspection requirement — Subgrade Inspections
Saul Shapiro
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2026
Filed — New Building
Foundation work as per plans filed, in conjunction with NB # B00848051-I1
B00848051-P1
03/30/2026
Special inspection requirement — Subgrade Inspections
Saul Shapiro
03/30/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Saul Shapiro
03/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Saul Shapiro
03/19/2026
Permit issued — Standpipe
B00848051-S7-EW-SD
03/19/2026
Permit issued — Plumbing
B01363363-S1-PL
03/19/2026
Permit issued — General Construction
B01363363-I1-GC
02/25/2026
Filed — Alteration
SHL1 - FILING FOR CIVIL SITE WORK PLUMBING COMPONENT IN CONJUCTION WITH NEW BUILDING B00848051-I1
B01363363-I1
02/25/2026
Filed — Alteration
SHL1 - FILING FOR CIVIL SITE WORK PLUMBING COMPONENT IN CONJUCTION WITH NEW BUILDING B00848051-I1
B01363363-S1
02/23/2026
Special inspection requirement — Final
CONNIE PISANI
02/19/2026
Permit issued — Support of Excavation
B00848051-S5-SE
02/12/2026
Filed — Alteration
THE SIDEWALK SHED AT THE FRONT OF THE BUILDING, BEHIND T HE BUILDING, AND CLARKSON STREET ELEVATIONS.
B01323698-P2
02/09/2026
Permit issued — Foundation
B00848051-S3-FO
02/04/2026
Filed — New Building
Foundation work as per plans filed, in conjunction with NB # B00848051-I1
B00848051-S7
01/13/2026
Objection raised — Other
12/30/2025
Objection resolved — Addressed
12/29/2025
Filed — Alteration
THE SIDEWALK SHED AT THE FRONT OF THE BUILDING, BEHIND T HE BUILDING, AND CLARKSON STREET ELEVATIONS.
B01323698-I1
12/29/2025
Permit issued — Sidewalk Shed
B01323698-I1-SH
11/13/2025
Objection resolved — Addressed
11/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
11/13/2025
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
07/08/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Saul Shapiro
11/08/2024
Objection raised — Other
10/31/2024
Filed — New Building
Foundation work as per plans filed, in conjunction with NB # B00848051-I1
B00848051-S2
10/29/2024
Objection raised — Other
10/24/2024
Filed — New Building
Foundation work as per plans filed, in conjunction with NB # B00848051-I1
B00848051-S6
10/22/2024
Objection raised — Other
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC09/10/2026
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION CORP09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOSAN CONSTRUCTION CORP08/19/2026
DOB NOWStructuralPermit IssuedJ.E. LEVINE BUILDER INC07/30/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC07/08/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC05/27/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC05/18/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC05/15/2026
DOB NOWStandpipePermit IssuedG.N.T. MECHANICAL LLC03/19/2026
DOB NOWPlumbingPermit IssuedFLINT MECHANICAL CORP03/19/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC03/19/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC02/19/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC02/09/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC12/29/2025
1 project · most recent 06/02/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedJ.E. LEVINE BUILDER INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-A36NKA7 36,000 BTU · Vrf Outdoor ×4
PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×3
PUHY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×2
PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×1
PURY-EP72TNU-A1 72,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric MXZ-SM36NAM2-U1 41,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE-1XJINH-S15EE-GNT-L 275 CFM · Erv ×2
Swegon RX-012 1,391 CFM · Erv ×1
RX-050 3,805 CFM · Erv ×1
Rennaire HE-3XJINH-S35VV-ANT-L 934 CFM · Erv ×1
2 projects · most recent 06/02/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/02/2026Permit IssuedG.N.T. MECHANICAL LLCStorm, Water/Sanitary
02/25/2026Permit IssuedBLETSAS P&H CORPStorm
4 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedEMPIRE STATE ELECTL CORP—
06/23/2026Permit IssuedEMPIRE STATE ELECTL CORP1 meters, 1 new_meters
06/18/2026Permit IssuedEMPIRE STATE ELECTL CORPGeneral Wiring
11/24/2025Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 06/02/2026
Concrete Masonry
FiledStatusContractorScope
06/02/2026Permit IssuedJ.E. LEVINE BUILDER INCConcrete, Masonry
2 projects · most recent 08/10/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/10/2026Permit IssuedCOSAN CONSTRUCTION CORPScaffold
06/05/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/06/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
07/22/2026Maintenance information—energy_progress
07/22/2026HVAC-R and service water heating equipment—energy_progress
07/22/2026HVAC-R and service water piping design and insulation—energy_progress
07/22/2026HVAC-R and service water heating system controls—energy_progress
05/06/2026FinalLESLEY SCHMERZLERprogress
04/20/2026Excavations - Sheeting, Shoring, and BracingSaul Shapirospecial
04/20/2026Subsurface Conditions – Fill Placement & In-Place DensitySaul Shapirospecial
04/20/2026Subgrade InspectionsSaul Shapirospecial
03/30/2026Subgrade InspectionsSaul Shapirospecial
03/30/2026Subsurface Conditions – Fill Placement & In-Place DensitySaul Shapirospecial
03/30/2026Excavations - Sheeting, Shoring, and BracingSaul Shapirospecial
02/23/2026FinalCONNIE PISANIprogress
11/13/2025Fire-Resistance Rated ConstructionCONNIE PISANIprogress
11/13/2025Insulation placement and R valuesCONNIE PISANIenergy_progress
07/08/2025Excavations - Sheeting, Shoring, and BracingSaul Shapirospecial
06/20/2024Standpipe SystemsCONNIE PISANIspecial
04/04/2024Concrete - PrecastCONNIE PISANIspecial
03/20/2024Subgrade InspectionsSaul Shapirospecial
03/20/2024Subsurface Investigations (Borings/Test Pits)Saul Shapirospecial
03/20/2024Concrete - Cast-In-PlaceVLADIMIR SEIJASspecial
03/20/2024Post-installed AnchorsCONNIE PISANIspecial
03/20/2024Subsurface Conditions – Fill Placement & In-Place DensitySaul Shapirospecial
03/20/2024Concrete - Cast-In-PlaceVLADIMIR SEIJASspecial
03/20/2024MasonryVLADIMIR SEIJASspecial
03/20/2024Post-installed AnchorsCONNIE PISANIspecial
Latest 25 of 45.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/19/2026B01444757-I1Request digital key ↗
08/18/2026B01363363-S1Request digital key ↗
08/18/2026B01363363-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00848051-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/28/2026B01441779-I1Open ↗
08/19/2026B01444757-I1Open ↗
08/18/2026B01363363-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026B00848051-P1Open ↗
09/02/2026B00848051-P1Open ↗
09/02/2026B00848051-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01363363-I1Open ↗
08/29/2026B01398299-I1Open ↗
08/29/2026B00848051-S3Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00848051-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00848051-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00848051-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00848051-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026B00848051-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00848051-S3Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00848051-S3Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/19/2026B01444757-I1Open ↗
08/18/2026B01363363-S1Open ↗
08/18/2026B01363363-I1Open ↗
Showing 3 of 17 on file for this type
▸Other Documents3
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00848051-S5Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00848051-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00848051-I1Open ↗