Elevator apt, fireproof with stores
Smith (NYCHA)
7 ST JAMES PLACE · BIN 1077414
💬 Discuss this project
1950Year Built
17Stories
D6Building Class
R7-2Zoning
1,264,820 sfGross Floor Area
1,947Units
LL97 Covered10 Active Violations 5 unresolved · 5 paperwork only ▸FISP: No Report Filed
Elevator apt, fireproof with stores · Owner of record: NYC Housing Authority · 781,000 sf lot · 1.62 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Temporary protection and dust controlUnder Construction1p · 1 filing · 3 docs
Floor 1NYC Housing AuthorityUnder Construction159p · 1 filing · 20 docs
MezzanineNYC Housing AuthorityUnder Construction173p · 1 filing · 20 docs
CellarNYC Housing AuthorityUnder Construction186p · 3 filings · 20 docs
Site & exteriorSmith HousingUnder Construction21p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority9510/14/2026
NYC Department of Housing Preservation and Development303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV1410/13/2026
A. Danza Consulting208/28/2025
RLM Engineering506/07/2024
Joel Phagoo P.E111/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Richards Plum & Heating CoGeneral Contractor2509/03/2026
Richards Plum & Heating CoScaffold1008/30/2026
Richards P and H CoPlumbing807/08/2026
Navillus TileScaffold307/08/2026
Anthony G FerryElectrical103/21/2026
N.Y.C. Housing AuthorityElectrical103/21/2026
Elizabeth A MahoneyElectrical103/21/2026
Caruso VincentElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4231909/11/2026
RLM Engineering6913406/07/2024
Building Lifecycle
All (139)Filed (22)Permit Issued (31)Signed Off (1)Facade (FISP) (12)Violation (16)Inspection (4)Objection (23)Special Inspection (30)
10/13/2026
Filed — Alteration
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
M00516712-A3
09/11/2026
Filed — Alteration
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
M00516712-A2
09/09/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
09/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
09/04/2026
Special inspection requirement — Mechanical Systems
Young Suh
09/04/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/04/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Young Suh
09/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
09/04/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
09/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
09/04/2026
Special inspection requirement — Maintenance information
Young Suh
09/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
09/04/2026
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
09/04/2026
Special inspection requirement — High-Pressure Steam Piping (Welding)
Young Suh
09/04/2026
Special inspection requirement — Heating Systems
Young Suh
09/04/2026
Special inspection requirement — Interior lighting power
Young Suh
09/04/2026
Special inspection requirement — Post-installed Anchors
Young Suh
09/04/2026
Special inspection requirement — Structural Steel - Details
Young Suh
09/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
09/04/2026
Special inspection requirement — Final
Young Suh
09/04/2026
Special inspection requirement — Ventilation and air distribution system
Young Suh
09/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
09/04/2026
Special inspection requirement — Masonry
Young Suh
09/04/2026
Special inspection requirement — Lighting controls
Young Suh
09/02/2026
Permit issued — Mechanical Systems
M00516712-I1-MS
09/02/2026
Permit issued — Mechanical Systems
M00516712-I1-ST
09/02/2026
Permit issued — Structural
M00516712-I1-GC
08/27/2026
Permit issued — Protection and Mechanical Methods
M01264500-I1-PMM
08/27/2026
Permit issued — General Construction
M01245132-I1-GC
08/17/2026
Objection raised — Scope
07/20/2026
Filed — Alteration
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
M00516712-A1
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/10/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
07/10/2026
Special inspection requirement — Ventilation and air distribution system
Young Suh
07/10/2026
Special inspection requirement — Lighting controls
Young Suh
07/10/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Young Suh
07/10/2026
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
07/02/2026
Permit issued — Plumbing
M00516712-S1-PL
05/26/2026
Filed — Alteration
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
M00516712-P9
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2026
Permit issued — Construction Fence
M00842315-I1-FN
03/26/2026
Permit issued — Mechanical Systems
M00897560-I1-MS
10/27/2025
Permit issued — Plumbing
M00897560-S2-PL
10/03/2025
Filed — Alteration
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
M00516712-P8
09/18/2025
Permit issued — Mechanical Systems
M00516712-I1-ST
09/17/2025
Permit issued — Mechanical Systems
M00516712-I1-GC
09/02/2025
Permit issued — Structural
M00516712-I1-MS
08/29/2025
Permit issued — Protection and Mechanical Methods
M01264500-I1-PMM
08/28/2025
Filed — Alteration
Temporary protection and dust control related to utility work osp as per plans filed herewith.
M01264500-I1
08/21/2025
Permit issued — General Construction
M01245132-I1-GC
07/21/2025
Filed — Alteration
Temporary support for concrete repairs on overhead beam and slab in cellar as per plans filed herewith.
M01245132-I1
07/09/2025
Objection resolved — Addressed
07/08/2025
Objection raised — Scope
06/24/2025
Filed — Alteration
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
M00516712-P6
04/22/2025
Permit issued — Plumbing
M00516712-S1-PL
03/21/2025
Permit issued — Mechanical Systems
M00897560-I1-MS
03/21/2025
Permit issued — Construction Fence
M00842315-I1-FN
03/18/2025
Objection resolved — Addressed
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co09/02/2026
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co09/02/2026
DOB NOWStructuralPermit IssuedRichards Plum & Heating Co09/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedRichards Plum & Heating Co08/27/2026
DOB NOWGeneral ConstructionPermit IssuedRichards Plum & Heating Co08/27/2026
DOB NOWPlumbingPermit IssuedRichards P and H Co07/02/2026
DOB NOWConstruction FencePermit IssuedRichards Plum & Heating Co03/26/2026
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co03/26/2026
DOB NOWPlumbingPermit IssuedRichards P and H Co10/27/2025
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co09/18/2025
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co09/17/2025
DOB NOWStructuralPermit IssuedRichards Plum & Heating Co09/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedRichards Plum & Heating Co08/29/2025
DOB NOWGeneral ConstructionPermit IssuedRichards Plum & Heating Co08/21/2025
DOB NOWPlumbingPermit IssuedRichards P and H Co04/22/2025
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co03/21/2025
DOB NOWConstruction FencePermit IssuedRichards Plum & Heating Co03/21/2025
DOB NOWPlumbingPermit IssuedRichards P and H Co10/31/2024
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co09/19/2024
DOB NOWStructuralPermit IssuedRichards Plum & Heating Co09/18/2024
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co08/27/2024
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co07/09/2024
DOB NOWConstruction FencePermit IssuedRichards Plum & Heating Co05/23/2024
DOB NOWPlumbingPermit IssuedRichards P and H Co04/22/2024
DOB NOWPlumbingPermit IssuedRichards P and H Co09/18/2023
DOB NOWBoiler EquipmentSigned-offJack Piccini08/14/2023
DOB NOWMechanical SystemsPermit IssuedRichards Plum & Heating Co08/01/2023
DOB NOWConstruction FencePermit IssuedRichards Plum & Heating Co05/31/2023
DOB NOWConstruction FenceSigned-offNavillus Tile05/13/2021
DOB NOWConstruction FenceSigned-offNavillus Tile12/24/2020
DOB NOWConstruction FenceSigned-offNavillus Tile11/12/2020
BISMHISSUEDACS System Associates04/28/2025
BISMHISSUEDACS System Associates04/25/2024
BISMHISSUEDACS System Associates04/24/2023
BISOTISSUEDNavillus Tile05/17/2022
BISOTISSUEDNavillus Tile05/17/2022
BISMHISSUEDACS System Associates05/03/2022
BISOTISSUEDNavillus Tile11/18/2020
BISOTISSUEDNavillus Tile11/11/2020
BISPLISSUEDVarsity Plumbing and Heating05/07/2020
+ 41 more permits on file
1 project · most recent 10/13/2026
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/13/2026Permit IssuedRichards Plum & Heating CoAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Trane UHEC-102AACA 10 kW · Unit Heater ×8
166-P 2,620 CFM · Electric Heater ×20
Ventilation
Greenheck BSQ-140-7 2,000 CFM · Exhaust Fan ×4
QEI-44 26,000 CFM · Exhaust Fan ×7
Vent-Rite CRVD 830-2E 1 CFM · Pump ×4
DVD-5-30-35 3 CFM · Pump ×10
Experflow Measurements WBF-200 3 CFM ×7
Quincy QC02012D 5,089 BTU · Condensing Unit ×7
Ducts & Piping
Fisher 667 40I 6 CFM ×1
667 45I 6 CFM ×1
667 76I 17 CFM ×1
667-4 70I 17 CFM ×1
V300 SER B 17 CFM ×1
Experflow Measurements WBF-200 7 CFM ×21
Itt Domestic Pump 20VLR2-30-35 7 CFM · Pump ×14
Vent-Rite VDR-30-30-30-E3 15 CFM · Pump ×4
DVD-30-30-35 15 CFM · Pump ×10
Bell & Gossett BFDW422-82 1,227,590 BTU · Heat Exchanger ×7
Bfs Industries B1.2561D4CX-1.5D 8 CFM · Condensing Unit ×7
Circor PV6411 17 CFM ×25
2 projects · most recent 10/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/13/2026Permit IssuedRichards P and H CoGas, Water/Sanitary
06/07/2024Permit IssuedRichards P and H CoGas, Water/Sanitary
9 projects · most recent 03/12/2026
General Wiring
FiledStatusContractorScope
03/12/2026Permit IssuedMac Fhionnghaile & SonsGeneral Wiring
11/01/2024Permit IssuedN.Y.C. Housing Authority1 meters
08/15/2023Permit IssuedMeco Electric CoGeneral Wiring
10/23/2021CompleteCsi Sec & Electric—
05/15/2021Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
10/02/2020Permit IssuedHertz ElectricGeneral Wiring
06/19/2020CompleteMac Fhionnghaile & SonsGeneral Wiring
08/19/2019CompleteTri-State Electrical & Mechanical IGeneral Wiring
08/22/2018Permit IssuedEia ElectricGeneral Wiring
1 project · most recent 10/13/2026
Steel Concrete
FiledStatusContractorScope
10/13/2026Permit IssuedRichards Plum & Heating CoSteel, Concrete
1 project · most recent 05/26/2023
Fence
FiledStatusContractorScope
05/26/2023Permit IssuedRichards Plum & Heating CoFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
09/09/2026Sprayed fire-resistant materialsYoung Suhspecial
09/04/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
09/04/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
09/04/2026Lighting controlsYoung Suhenergy_progress
09/04/2026Interior lighting powerYoung Suhenergy_progress
09/04/2026Electrical motors and elevatorsYoung Suhenergy_progress
09/04/2026Maintenance informationYoung Suhenergy_progress
09/04/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
09/04/2026Ventilation and air distribution systemYoung Suhenergy_progress
09/04/2026Fire-Resistance Rated ConstructionYoung Suhprogress
09/04/2026FinalYoung Suhprogress
09/04/2026Energy Code Compliance InspectionsYoung Suhprogress
09/04/2026Structural Steel - WeldingYoung Suhspecial
09/04/2026Structural Steel - High Strength BoltingYoung Suhspecial
09/04/2026Structural Steel - DetailsYoung Suhspecial
09/04/2026Structural Stability – Alterations of existing buildingsYoung Suhspecial
09/04/2026Post-installed AnchorsYoung Suhspecial
09/04/2026Mechanical SystemsYoung Suhspecial
09/04/2026MasonryYoung Suhspecial
09/04/2026High-Pressure Steam Piping (Welding)Young Suhspecial
09/04/2026Heating SystemsYoung Suhspecial
09/04/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Young Suhspecial
09/04/2026Concrete - Cast-In-PlaceYoung Suhspecial
09/04/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
07/10/2026Interior lighting powerYoung Suhenergy_progress
Latest 25 of 112.
▾Documents — 490 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
09/03/2026M00516712-I1Request digital key ↗
08/31/2026M00842315-I1Request digital key ↗
08/27/2026M00897560-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00417989-I1Request digital key ↗
▸Applications & Permits86
▸BISPLAN / WORK APPROVAL APPLICATION44
05/23/2023140928067Open ↗
11/16/2021140928067Open ↗
11/16/2021140928049Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION41
11/18/2020140928067Open ↗
11/11/2020140928049Open ↗
05/29/2019122128072Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/14/2020122128072Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISFLOOD ZONE DESIGN CERTIFICATION7
08/21/2020140928067Open ↗
03/17/2017140618099Open ↗
02/15/2017140606841Open ↗
Showing 3 of 7 on file for this type
▸BISFLOOD ZONE COMPLIANCE1
01/18/2023140928067Open ↗
▸Seals & Professional Certifications143
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
05/13/2020122128072Open ↗
12/20/2018140606841Open ↗
12/20/2018140618099Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
10/15/2026M00516712-A3Open ↗
10/05/2026M00516712-A2Open ↗
08/21/2026M01264500-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
10/05/2026M00516712-A2Open ↗
10/05/2026M00516712-A2Open ↗
10/05/2026M00516712-A2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/05/2026M00516712-A2Open ↗
10/05/2026M00516712-A2Open ↗
10/05/2026M00516712-A2Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
04/20/2017140344562Open ↗
03/17/2017140618099Open ↗
02/15/2017140606841Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY11
03/17/2017140618099Open ↗
02/15/2017140606841Open ↗
02/15/2017140606798Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION11
03/17/2017140618099Open ↗
02/15/2017140606841Open ↗
02/15/2017140606798Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/21/2020140928067Open ↗
08/19/2020140928049Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISTENANT PROTECTION PLAN AND NOTES6
08/21/2020140928067Open ↗
03/17/2017140618099Open ↗
02/15/2017140606841Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00417989-I1Open ↗
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/17/2017140618099Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
11/18/2020140928067Open ↗
11/11/2020140928049Open ↗
04/26/2017140344562Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00897560-I1Open ↗
08/13/2026M00897560-P1Open ↗
08/13/2026M00897560-S2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M00516712-S1Open ↗
08/13/2026M00516712-I1Open ↗
08/13/2026M00516712-S2Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/10/2018140344562Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
03/07/2017122128072Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/13/2020122128072Open ↗
01/10/2018140344562Open ↗
04/20/2017140344562Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/19/2020140928049Open ↗
Showing 1 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/12/2022140928049Open ↗
05/13/2020122128072Open ↗
01/10/2018140344562Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
02/15/2017140606798Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY20
02/08/2023140928067Open ↗
06/09/2022140928067Open ↗
06/09/2022140928049Open ↗
Showing 3 of 20 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/05/2017122128072Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/05/2017122128072Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
05/13/2020122128072Open ↗
▸Approvals, Objections & Sign-offs51
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
10/15/2026M00516712-A3Open ↗
10/05/2026M00516712-A2Open ↗
08/17/2026M00516712-I1Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
07/11/2023140928067Open ↗
12/13/2022140928049Open ↗
12/20/2018140606841Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/19/2018122128072Open ↗
03/19/2018122128072Open ↗
03/19/2018122128072Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
10/17/2017122128072Open ↗
10/17/2017122128072Open ↗
10/17/2017122128072Open ↗
▸BISSHED LETTER3
01/26/2018140606798Open ↗
06/13/2017140340129Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL2
06/09/2022140928067Open ↗
06/09/2022140928049Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT18
06/03/2024122128072Open ↗
05/22/2023140928067Open ↗
02/14/2023140928067Open ↗
Showing 3 of 18 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
05/29/2019122128072Open ↗
06/30/2017122128072Open ↗
02/10/2017122128072Open ↗
▸Filing & Intake Forms63
▸BISADDITIONAL INFORMATION28
02/14/2023140928067Open ↗
12/13/2022140928049Open ↗
12/13/2022140928049Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET13
08/21/2020140928067Open ↗
08/19/2020140928049Open ↗
03/17/2017140618099Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM11
01/21/2020122128072Open ↗
01/21/2020122128072Open ↗
01/14/2020122128072Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWAI1 Form7
10/15/2026M00516712-A3Open ↗
10/05/2026M00516712-A2Open ↗
08/17/2026M00516712-S2Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents12
▸BISFEE EXEMPTION DOCUMENTATION10
03/17/2017140618099Open ↗
02/15/2017140606841Open ↗
02/15/2017140606798Open ↗
Showing 3 of 10 on file for this type
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
06/09/2022140928067Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
08/21/2020140928067Open ↗