← Back
Factory, industrial, semi-fireproof
7 ST NICHOLAS AVENUE
BROOKLYN · Bushwick (West) · BIN 3072424
💬 Discuss this project
1950Year Built
4Stories
F4Building Class
M1-1Zoning
22,800 sfGross Floor Area
1Units
8 Open Violations ▸FDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: GMDC ST NICHOLAS AVENUE LLC · 5,700 sf lot · 4 FAR built · Flood zone X
Locations of Work
StructuralEquipment
Roof2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLOSSAL MEDIA507/08/2026
GMDC1707/08/2026
CEPRINE CONSTRUCTION903/22/2026
ERUKA WAREHOUSE CORP.103/22/2026
Z & M ADLER REALTY103/22/2026
REGAL KNITWEAR INC103/22/2026
ADLER103/21/2026
GREENPOINT MANUFACT DESIGN203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OLD STRUCTURES ENGINEERING308/12/2022
KZ ENGINEERING, P.C206/02/2022
SKYE BEACH RA203/19/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS203/21/2026
JM ZONING, LLC.203/21/2026
RIGGING CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor603/21/2026
APPLE RESTORATION & WATERPROOFGeneral Contractor407/08/2026
ROOPCHAND SINGHElectrical203/21/2026
INTERBORO SIGN ELECL MAIScaffold207/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
SKYHIGH MURALS-COLOSSALScaffold107/08/2026
WRIGHT MATTHEWScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745210/07/2024
PHILIBERT ENGINEERING, PC223208/12/2022
Building Lifecycle
All (104)Filed (12)Permit Issued (15)Signed Off (7)Violation (46)Objection (4)Special Inspection (20)
01/27/2026
Permit issued — Suspended Scaffold
B01345403-I1-SC
01/27/2026
Permit issued — Suspended Scaffold
B01345404-I1-SC
01/21/2026
Filed — Alteration
Facade Painting via Suspended Scaffolding
B01345403-I1
01/21/2026
Filed — Alteration
Suspended Scaffold for Painting Sign as Shown on Plans
B01345404-I1
01/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
01/14/2026
Signed off — Alteration
Facade Work
B00990507-I1
01/14/2026
Signed off — Alteration
B01115405-I1
01/14/2026
Permit issued — Suspended Scaffold
B01115405-I1-SC
01/14/2026
Permit issued — Suspended Scaffold
B00990507-I1-SC
01/12/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
10/21/2024
Permit issued — Suspended Scaffold
B01115405-I1-SC
10/16/2024
Objection raised — Other
10/16/2024
Objection resolved — Addressed
10/07/2024
Filed — Alteration
B01115405-I1
04/09/2024
Permit issued — Suspended Scaffold
B01021361-I1-SC
03/20/2024
Filed — Alteration
B01021361-I1
03/20/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
03/20/2024
Special inspection requirement — Post-installed Anchors
Michael Walsh
01/25/2024
Permit issued — Suspended Scaffold
B00990507-I1-SC
01/16/2024
Filed — Alteration
Facade Work
B00990507-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2023
Signed off — Alteration
FACADE REPAIRS INCLUDING CRACK REPAIR, REPLACEMENT OF DAMAGED ELEMENTS, STEEL REPAIR AND LOOSE ANGLE REPLACEMENT AS SHOWN ON PLANS HEREWITH.
B00582977-I1
01/04/2023
Signed off — Alteration
B00698040-I1
01/04/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00702112-I1
11/01/2022
Permit issued — Structural
B00582977-I1-ST
08/18/2022
Special inspection requirement — Final
Jacky Philibert
08/18/2022
Special inspection requirement — Masonry
Jacky Philibert
08/18/2022
Special inspection requirement — Structural Steel - Details
Jacky Philibert
08/18/2022
Special inspection requirement — Post-installed Anchors
Jacky Philibert
08/18/2022
Special inspection requirement — Structural Steel - Welding
Jacky Philibert
08/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jacky Philibert
08/12/2022
Filed — Alteration
FACADE REPAIRS INCLUDING CRACK REPAIR, REPLACEMENT OF DAMAGED ELEMENTS, STEEL REPAIR AND LOOSE ANGLE REPLACEMENT AS SHOWN ON PLANS HEREWITH.
B00582977-P2
08/11/2022
Special inspection requirement — Structural Steel - Welding
08/11/2022
Special inspection requirement — Post-installed Anchors
08/11/2022
Special inspection requirement — Masonry
Jacky Philibert
08/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jacky Philibert
08/11/2022
Special inspection requirement — Structural Steel - Details
Jacky Philibert
08/11/2022
Special inspection requirement — Final
Jacky Philibert
06/07/2022
Permit issued — Structural
B00582977-I1-ST
06/02/2022
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00702112-I1
06/02/2022
Permit issued — Supported Scaffold
B00702112-I1-SF
03/16/2022
Permit issued — Sidewalk Shed
B00698040-I1-SH
03/15/2022
Filed — Alteration
B00698040-I1
02/21/2022
Permit issued — Structural
B00582977-I1-ST
02/08/2022
Permit issued — Structural
B00582977-I1-ST
10/13/2021
Objection resolved — Addressed
10/06/2021
Objection raised — Other
10/04/2021
Filed — Alteration
FACADE REPAIRS INCLUDING CRACK REPAIR, REPLACEMENT OF DAMAGED ELEMENTS, STEEL REPAIR AND LOOSE ANGLE REPLACEMENT AS SHOWN ON PLANS HEREWITH.
B00582977-P1
09/30/2021
Special inspection requirement — Masonry
09/30/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/30/2021
Special inspection requirement — Structural Steel - Details
09/30/2021
Special inspection requirement — Final
09/27/2021
Filed — Alteration
FACADE REPAIRS INCLUDING CRACK REPAIR, REPLACEMENT OF DAMAGED ELEMENTS, STEEL REPAIR AND LOOSE ANGLE REPLACEMENT AS SHOWN ON PLANS HEREWITH.
B00582977-I1
08/25/2020
Signed off — Alteration
B00334903-I1
08/25/2020
Signed off — Alteration
B00334905-I1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSKYHIGH MURALS - COLOSSAL01/27/2026
DOB NOWSuspended ScaffoldPermit IssuedLONG SHOT CRANE LLC01/27/2026
DOB NOWSuspended ScaffoldSigned-offSKYHIGH MURALS-COLOSSAL M01/14/2026
DOB NOWSuspended ScaffoldSigned-offSKYHIGH MURALS-COLOSSAL M01/14/2026
DOB NOWSuspended ScaffoldSigned-offSKYHIGH MURALS-COLOSSAL M10/21/2024
DOB NOWSuspended ScaffoldPermit IssuedLONG SHOT CRANE LLC04/09/2024
DOB NOWSuspended ScaffoldSigned-offSKYHIGH MURALS-COLOSSAL M01/25/2024
DOB NOWStructuralSigned-offAPPLE RESTORATION & WATER11/01/2022
DOB NOWStructuralSigned-offAPPLE RESTORATION & WATER06/07/2022
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC06/02/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC03/16/2022
DOB NOWStructuralSigned-offAPPLE RESTORATION & WATER02/21/2022
DOB NOWStructuralSigned-offAPPLE RESTORATION & WATER02/08/2022
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/23/2020
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI03/23/2020
BISBLISSUEDFULTON PLBG & HTG CORP10/26/2006
BISPLISSUEDKAMAR MECHANICAL PLBG & HTG INC02/15/2002
BISBLISSUEDKAMAR MECHANICAL PLBG & HTG INC02/15/2002
BISOTISSUEDPACIFIC BOILER05/31/2001
BISOTISSUEDSEICKEL & SONS PLUMBING INC.03/27/2001
BISPLISSUEDSEICKEL & SONS PLUMBING INC.03/27/2001
BISOTISSUEDCHARLES RAMDASS CONSTRUCTION01/22/2001
BISPLISSUEDUNLIMITED MECHANICAL PLUMBING &10/15/1999
BISOTISSUEDPACIFIC BOILER10/15/1999
BISBLISSUEDUNFLAT PEROTTO ASSOC.05/14/1996
BISPLISSUEDUNFLAT PEROTTO ASSOC05/14/1996
2 projects · most recent 03/18/2022
FiledStatusContractorScope
03/18/2022CompleteBOROWIDE ELECT'L CONTR'S—
12/15/2017CompleteELECTROTEC OF NY ELECL IN—
1 project · most recent 01/21/2026
Suspended Scaffold
FiledStatusContractorScope
01/21/2026Permit IssuedSKYHIGH MURALS - COLOSSALSuspended Scaffold
2 projects · most recent 01/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/21/2026Permit IssuedSKYHIGH MURALS-COLOSSALSuspended Scaffold (SC)
01/21/2026Permit IssuedSKYHIGH MURALS - COLOSSALSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/20/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
01/12/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
03/20/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
03/20/2024Post-installed AnchorsMichael Walshspecial
08/18/2022FinalJacky Philibertprogress
08/18/2022MasonryJacky Philibertspecial
08/18/2022Structural Steel - DetailsJacky Philibertspecial
08/18/2022Post-installed AnchorsJacky Philibertspecial
08/18/2022Structural Steel - WeldingJacky Philibertspecial
08/18/2022Structural Stability – Alterations of existing buildingsJacky Philibertspecial
08/11/2022Structural Steel - Welding—special
08/11/2022Post-installed Anchors—special
08/11/2022MasonryJacky Philibertspecial
08/11/2022Structural Stability – Alterations of existing buildingsJacky Philibertspecial
08/11/2022Structural Steel - DetailsJacky Philibertspecial
08/11/2022FinalJacky Philibertprogress
09/30/2021Masonry—special
09/30/2021Structural Stability – Alterations of existing buildings—special
09/30/2021Structural Steel - Details—special
09/30/2021Final—progress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/01/2026B00582977-P2Request digital key ↗
09/01/2026B00582977-I1Request digital key ↗
08/30/2026B00698040-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00334905-I1Request digital key ↗
09/02/2026B00334903-I1Request digital key ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B00582977-P2Open ↗
09/02/2026B00582977-P2Open ↗
09/02/2026B00582977-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00582977-P2Open ↗
09/01/2026B00582977-P1Open ↗
09/01/2026B00582977-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B00582977-P2Open ↗
09/01/2026B00582977-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00582977-P2Open ↗
09/01/2026B00582977-I1Open ↗
08/14/2026B00582977-P1Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications5
08/13/2026B01021361-I1Open ↗
08/13/2026B01345403-I1Open ↗
08/13/2026B01115405-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations5
08/13/2026B01021361-I1Open ↗
08/13/2026B00990507-I1Open ↗
08/13/2026B01115405-I1Open ↗
Showing 3 of 5 on file for this type