7 WEST 46TH STREET
MANHATTAN · BIN 1814508
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsUnder Construction1 filing
CellarSupported scaffold stair tower1 filing
Sub-CellarUnder Construction1 filing
Site & exteriorTemporary construction fence installation3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Extell Development410/20/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jaros Baum & Bolles308/20/2026
WSP507/22/2026
Mueser Rutledge Consulting Engineering604/27/2026
E&G Development903/20/2026
Bohler Engineering NY604/01/2025
Kohn Pedersen Fox109/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli Construction CoGeneral Contractor210/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Langan Engineering, Env, Surveyin1265507/22/2026
WSP USA1848507/22/2026
Ancora Engineering6818804/27/2026
Delta Testing Labs687103/05/2026
Building Lifecycle
All (120)Filed (30)Permit Issued (22)Signed Off (2)Objection (36)Special Inspection (30)
10/19/2026
Permit issued — Support of Excavation
M01093960-S2-SE
10/08/2026
Signed off — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-S4
09/18/2026
Special inspection requirement — Protection of exposed foundation insulation
09/08/2026
Objection raised — Other
08/27/2026
Permit issued — Support of Excavation
M01093960-S2-SE
08/20/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-S9
08/14/2026
Special inspection requirement — Post-installed Anchors
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Special inspection requirement — Standpipe Systems
08/12/2026
Special inspection requirement — Sprinkler Systems
07/31/2026
Permit issued — Plumbing
M01093960-S8-PL
07/29/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
RONALD BOYER
07/29/2026
Special inspection requirement — Prestressed Rock and Soil Anchors
RONALD BOYER
07/29/2026
Special inspection requirement — Subgrade Inspections
RONALD BOYER
07/29/2026
Special inspection requirement — Footing and Foundation
Ahmad Rahimian
07/29/2026
Special inspection requirement — Final
Ahmad Rahimian
07/29/2026
Special inspection requirement — Concrete - Cast-In-Place
Ahmad Rahimian
07/29/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
RONALD BOYER
07/22/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-A2
07/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
RONALD BOYER
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
Ahmad Rahimian
07/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
RONALD BOYER
07/20/2026
Special inspection requirement — Subgrade Inspections
RONALD BOYER
07/20/2026
Special inspection requirement — Prestressed Rock and Soil Anchors
RONALD BOYER
07/20/2026
Special inspection requirement — Final
Ahmad Rahimian
07/20/2026
Special inspection requirement — Footing and Foundation
Ahmad Rahimian
07/14/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-A1
06/30/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2026
Permit issued — Foundation
M01093960-S3-FO
04/27/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-P9
04/20/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Gregory Moormann
04/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Gregory Moormann
03/20/2026
Filed — Alteration
Installation of Temporary Construction Fence on sidewalk and roadway.
M01201902-P3
03/05/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-S8
03/05/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-P8
03/02/2026
Special inspection requirement — Footing and Foundation
Ahmad Rahimian
03/02/2026
Special inspection requirement — Final
Ahmad Rahimian
03/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
RONALD BOYER
03/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
RONALD BOYER
03/02/2026
Special inspection requirement — Subgrade Inspections
RONALD BOYER
03/02/2026
Special inspection requirement — Prestressed Rock and Soil Anchors
RONALD BOYER
03/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Ahmad Rahimian
02/26/2026
Permit issued — Foundation
M01093960-S1-FO
02/25/2026
Signed off — Alteration
M01168047-I1
02/25/2026
Permit issued — Support of Excavation
M01093960-S2-SE
02/24/2026
Permit issued — Earth Work
M01093960-S4-EA
02/24/2026
Permit issued — Foundation
M01093960-S3-FO
01/20/2026
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-P7
12/30/2025
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-P6
11/20/2025
Permit issued — Supported Scaffold
M01319914-I1-SF
11/17/2025
Filed — Alteration
Installation of Temporary Construction Fence on sidewalk and roadway.
M01201902-P2
11/17/2025
Filed — Alteration
Supported Scaffold Stair Tower
M01319914-I1
11/12/2025
Permit issued — Supported Scaffold
M01158150-I1-SF
10/01/2025
Permit issued — Construction Fence
M01201902-I1-FN
08/27/2025
Filed — Alteration
Installation of Temporary Construction Fence on sidewalk and roadway.
M01201902-P1
04/30/2025
Permit issued — Construction Fence
M01201902-I1-FN
04/03/2025
Permit issued — Construction Fence
M01201902-I1-FN
04/02/2025
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-P5
04/01/2025
Filed — New Building
STRUCTURAL WORK ASSOCIATED WITH THE NB APPLICATION #M01093960-I1
M01093960-P3
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedConsigli Construction Co10/19/2026
DOB NOWSupport of ExcavationPermit IssuedConsigli Construction Co08/27/2026
DOB NOWPlumbingPermit IssuedParkview P&H07/31/2026
DOB NOWFoundationPermit IssuedConsigli Construction Co06/09/2026
DOB NOWFoundationPermit IssuedConsigli Construction Co02/26/2026
DOB NOWSupport of ExcavationPermit IssuedConsigli Construction Co02/25/2026
DOB NOWEarth WorkSigned-offConsigli Construction Co02/24/2026
DOB NOWFoundationPermit IssuedConsigli Construction Co02/24/2026
DOB NOWSupported ScaffoldPermit IssuedKingdom Associates11/20/2025
DOB NOWSupported ScaffoldPermit IssuedKingdom Associates11/12/2025
DOB NOWConstruction FencePermit IssuedKingdom Associates10/01/2025
DOB NOWConstruction FencePermit IssuedKingdom Associates04/30/2025
DOB NOWConstruction FencePermit IssuedKingdom Associates04/03/2025
DOB NOWSupport of ExcavationPermit IssuedConsigli Construction Co02/28/2025
DOB NOWFoundationPermit IssuedConsigli Construction Co02/28/2025
DOB NOWEarth WorkSigned-offConsigli Construction Co02/26/2025
DOB NOWFoundationPermit IssuedConsigli Construction Co02/26/2025
DOB NOWFoundationPermit IssuedConsigli Construction Co02/03/2025
DOB NOWSupport of ExcavationPermit IssuedConsigli Construction Co02/03/2025
DOB NOWEarth WorkSigned-offConsigli Construction Co01/29/2025
DOB NOWEarth WorkSigned-offConsigli Construction Co01/24/2025
DOB NOWConstruction FencePermit IssuedKingdom Associates12/12/2024
3 projects · most recent 07/02/2025
FiledStatusContractorScope
07/02/2025Permit IssuedInter Connection Eletric—
06/10/2025Permit IssuedRedgrave Electl Maintnce1 meters, 1 new_meters
03/17/2025Permit IssuedPrime Electrical1 meters, 1 new_meters
3 projects · most recent 03/20/2026
Fence Scaffold
FiledStatusContractorScope
03/20/2026Permit IssuedKingdom AssociatesFence
11/17/2025Permit IssuedKingdom AssociatesScaffold
02/03/2025Permit IssuedKingdom AssociatesFence
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
09/18/2026Protection of exposed foundation insulation—energy_progress
08/14/2026Fire-Resistant Penetrations and Joints—special
08/14/2026Post-installed Anchors—special
08/12/2026Sprinkler Systems—special
08/12/2026Standpipe Systems—special
07/29/2026Concrete - Cast-In-PlaceAhmad Rahimianspecial
07/29/2026Prestressed Rock and Soil AnchorsRONALD BOYERspecial
07/29/2026Subsurface Conditions – Fill Placement & In-Place DensityRONALD BOYERspecial
07/29/2026FinalAhmad Rahimianprogress
07/29/2026Footing and FoundationAhmad Rahimianprogress
07/29/2026Subgrade InspectionsRONALD BOYERspecial
07/29/2026Subsurface Investigations (Borings/Test Pits)RONALD BOYERspecial
07/20/2026Concrete - Cast-In-PlaceAhmad Rahimianspecial
07/20/2026Footing and FoundationAhmad Rahimianprogress
07/20/2026FinalAhmad Rahimianprogress
07/20/2026Subsurface Investigations (Borings/Test Pits)RONALD BOYERspecial
07/20/2026Subsurface Conditions – Fill Placement & In-Place DensityRONALD BOYERspecial
07/20/2026Subgrade InspectionsRONALD BOYERspecial
07/20/2026Prestressed Rock and Soil AnchorsRONALD BOYERspecial
06/30/2026High-Pressure Fuel-Gas Piping (Welding)—special
06/30/2026Fire-Resistant Penetrations and Joints—special
04/20/2026Construction Operations Influencing Adjacent StructuresGregory Moormannspecial
04/20/2026Excavations - Sheeting, Shoring, and BracingGregory Moormannspecial
03/02/2026Subsurface Investigations (Borings/Test Pits)RONALD BOYERspecial
03/02/2026Subsurface Conditions – Fill Placement & In-Place DensityRONALD BOYERspecial
Latest 25 of 74.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/25/2026M01158150-I1Request digital key ↗
08/25/2026M01153471-I1Request digital key ↗
08/25/2026M01153471-P2Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸DOB NOWDEP Stormwater Construction Permit2
08/17/2026M01093960-P9Open ↗
08/17/2026M01093960-A2Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 13
08/17/2026M01093960-A1Open ↗
08/17/2026M01093960-A2Open ↗
08/17/2026M01093960-P9Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026M01093960-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026M01093960-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/25/2026M01158150-I1Open ↗
08/25/2026M01153471-P2Open ↗
08/25/2026M01153471-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026M01168047-S2Open ↗
08/22/2026M01093960-P6Open ↗
08/22/2026M01093960-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026M01168047-I1Open ↗
08/28/2026M01168047-S2Open ↗
08/26/2026M01168047-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/17/2026M01093960-A2Open ↗
▸Other Documents3
▸DOB NOWAdjoining Owners Notification2
08/13/2026M01168047-I1Open ↗
08/13/2026M01168047-S1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/25/2026M01168047-I1Open ↗