← Back
BuildNYC
Television studio
7 WEST 66TH STREET
MANHATTAN · BIN 1081014
💬 Discuss this project
1985Year Built
14Stories
J6Building Class
C4-7Zoning
347,053 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Television studio · Owner of record: SC Campus Owner · 47,698 sf lot · 7.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 7Brick replacementUnder Construction1p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Hudson Square Realty, LLC13p · 3 filings · 17 docs
CellarHudson Square Realty, LLC2p · 2 filings · 14 docs
Site & exteriorProposed heavy duty sidewalk shedUnder Construction11p · 2 filings · 8 docs
Filed — no permit issuedSc Campus Owner LLC17p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Disney Core Services4503/21/2026
ABC2603/21/2026
American Broadcasting Cos2303/21/2026
The Walt Disney Company1603/21/2026
Hudson Square Realty1107/08/2026
Extell Development610/13/2026
Associates203/21/2026
SC Campus Owner103/22/2026
ABS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services109/12/2026
Ancora Engineering108/03/2026
Stephen B Jacobs Group112/05/2024
Syska Hennessy Group308/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Shalat Architects P C603/21/2026
Milrose Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GrinnellPlumbing603/22/2026
Metropolitan Building ServicesGeneral Contractor303/21/2026
H. & L. ElectricElectrical203/21/2026
Peaq Restorationspecialty_contractor108/30/2026
Platinum Services NYScaffold109/15/2026
Pace PlumbingPlumbing107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Advanced Engineering &1224109/11/2026
Ancora Engineering6818108/03/2026
Socotec Engineering4983108/18/2020
Shalat Architects2036308/12/2020
Building Lifecycle
All (63)Filed (7)Permit Issued (6)Signed Off (3)Facade (FISP) (15)Violation (11)Objection (2)Special Inspection (19)
10/08/2026
Permit issued — Suspended Scaffold
M01458532-I1-SC
09/14/2026
Permit issued — Sidewalk Shed
M01455903-I1-SH
09/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01455903-I1
09/11/2026
Filed — Alteration
Suspended Scaffold Installation for Facade Restoration and Inspection
M01458532-I1
09/10/2026
Special inspection requirement — Post-installed Anchors
Jerry Pitera
09/10/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Jerry Pitera
08/28/2026
Permit issued — Structural
M01412837-I1-ST
08/03/2026
Filed — Alteration
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED LOCALIZED FACADE REPAIRS OF THE 7-STORY BUILDING LOCATED AT 7 W 66TH STREET, BOROUGH OF MANHATTAN, NY 10023
M01412837-I1
06/05/2026
Special inspection requirement — Masonry
Gregory Moormann
06/05/2026
Special inspection requirement — Final
Gregory Moormann
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gregory Moormann
06/05/2026
Special inspection requirement — Post-installed Anchors
Gregory Moormann
05/28/2025
Objection resolved — Resolved
04/11/2025
Cycle 9 facade inspection completed
04/11/2025
Cycle 9 facade report signed — SWARMP
02/20/2025
Cycle 9 facade report submitted
02/19/2025
Signed off — Alteration
Modifications of ductwork on first floor. No change to egress use or occupancy.
M00369711-I1
12/27/2024
Objection raised — Other
12/05/2024
Filed — Alteration CO
M01151076-I1
12/05/2024
Special inspection requirement — Preliminary
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/05/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
05/10/2022
Cycle 9 facade report signed — SWARMP
05/02/2022
Cycle 9 facade inspection completed
01/27/2022
Cycle 9 facade report submitted
03/11/2021
Signed off — Alteration
Removal and installation of new plumbing fixtures on first floor. No change to egress use or occupancy.
M00369787-I1
01/25/2021
Signed off — Alteration
M00369804-I1
09/11/2020
Permit issued — Sprinklers
M00369804-I1-EW-SP
08/24/2020
Permit issued — Plumbing
M00369787-I1-PL
08/18/2020
Filed — Alteration
M00369804-I1
08/17/2020
Permit issued — Mechanical Systems
M00369711-I1-MS
08/12/2020
Filed — Alteration
Removal and installation of new plumbing fixtures on first floor. No change to egress use or occupancy.
M00369787-I1
08/10/2020
Filed — Alteration
Modifications of ductwork on first floor. No change to egress use or occupancy.
M00369711-I1
07/13/2020
Special inspection requirement — Fire-Resistance Rated Construction
Edward Shalat
07/13/2020
Special inspection requirement — Final
Edward Shalat
07/13/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Shalat
07/13/2020
Special inspection requirement — Mechanical Systems
Edward Shalat
07/13/2020
Special inspection requirement — HVAC insulation and sealing
Edward Shalat
07/13/2020
Special inspection requirement — HVAC and service water heating system controls
Edward Shalat
07/13/2020
Special inspection requirement — HVAC and service water heating equipment
Edward Shalat
07/13/2020
Special inspection requirement — Energy Code Compliance Inspections
Edward Shalat
04/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/21/2017
Cycle 8 facade report signed — SAFE
02/21/2017
Cycle 8 facade report submitted
12/26/2016
Cycle 8 facade inspection completed
08/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2012
Violation issued (ECB, closed)
Construction
10/24/2011
Cycle 7 facade report submitted
10/19/2011
Cycle 7 facade report signed — SWARMP
08/04/2011
Cycle 7 facade inspection completed
03/31/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2007
Cycle 6 facade report submitted
02/16/2007
Cycle 6 facade report signed — SAFE
12/14/2006
Cycle 6 facade inspection completed
01/06/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/1990
Violation issued (ECB, closed)
Public Assembly
07/01/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedPeaq Restoration10/08/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/14/2026
DOB NOWStructuralPermit IssuedPeaq Restoration08/28/2026
DOB NOWSprinklersSigned-offSirina Fire Protection09/11/2020
DOB NOWPlumbingSigned-offPace Plumbing08/24/2020
DOB NOWMechanical SystemsSigned-offMetropolitan Building Services08/17/2020
BISSDISSUEDEvergreen Mechanical03/07/2025
BISOTISSUEDMetropolitan Building Services08/04/2020
BISSDISSUEDGrinnell06/26/2020
BISSPISSUEDGrinnell06/26/2020
BISSPISSUEDGrinnell07/19/2018
BISSDISSUEDGrinnell10/26/2017
BISEQISSUEDRock Group NY04/05/2017
BISOTISSUEDTribute Restoration02/14/2017
BISOTISSUEDSato Construction Co04/20/2016
BISEQISSUEDRock Group NY04/04/2016
BISSPISSUEDNYC Fire Sprinkler03/24/2016
BISOTISSUEDIdeal Interiors Group01/15/2016
BISOTISSUEDSato Construction Co10/05/2015
BISSPISSUEDAbco-Peerless Sprinkler09/03/2014
BISPLISSUEDDanton Plumbing & Heating08/21/2014
BISMHISSUEDJames E Fitzgerald08/08/2014
BISOTISSUEDJames E Fitzgerald08/08/2014
BISEQISSUEDEverest Scaffolding04/01/2013
BISSPISSUEDFull Capacity Fire08/10/2012
BISMHISSUEDIdeal Interiors Group07/25/2012
BISOTISSUEDIdeal Interiors Group07/25/2012
BISSPISSUEDGrinnell07/24/2012
BISPLISSUEDLab Plumbing & Heating Co06/15/2012
BISOTISSUEDIdeal Interiors Group06/14/2012
BISMHISSUEDIdeal Interiors Group06/14/2012
BISPLISSUEDPar Plumbing Co04/28/2011
BISEQISSUEDEverest Scaffolding03/24/2011
BISEQISSUEDEverest Scaffolding03/15/2011
BISEQISSUEDEverest Scaffolding10/27/2010
BISEQISSUEDEverest Scaffolding03/26/2010
BISSPISSUEDCode Fire Protection03/01/2010
BISEQISSUEDEverest Scaffolding02/12/2010
BISMHISSUEDJames G Kennedy & Co04/15/2009
BISOTISSUEDJames G Kennedy & Co04/15/2009
+ 16 more permits on file
5 projects · most recent 09/12/2026
General Wiring
FiledStatusContractorScope
09/12/2026Permit IssuedRichard Neu—
08/05/2026Permit IssuedCentrifugal Electric—
12/27/2024CompleteH. & L. Electric—
12/27/2024CompleteH. & L. ElectricGeneral Wiring
08/10/2021CompleteH. & L. ElectricGeneral Wiring
1 project · most recent 08/03/2026
Masonry
FiledStatusContractorScope
08/03/2026Permit IssuedPeaq RestorationMasonry
1 project · most recent 09/12/2026
Sidewalk Shed
FiledStatusContractorScope
09/12/2026Permit IssuedPlatinum Services NYSidewalk Shed
1 project · most recent 09/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/11/2026Permit IssuedPeaq RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/10/2026Post-installed AnchorsJerry Piteraspecial
09/10/2026Alternative Materials - OTCR Buildings Bulletin NumberJerry Piteraspecial
06/05/2026MasonryGregory Moormannspecial
06/05/2026FinalGregory Moormannprogress
06/05/2026Structural Stability – Alterations of existing buildingsGregory Moormannspecial
06/05/2026Post-installed AnchorsGregory Moormannspecial
12/05/2024Preliminary—progress
12/05/2024Fire-Resistant Penetrations and Joints—special
12/05/2024Wall Panels, Curtain Walls, and Veneers—special
12/05/2024Energy Code Compliance Inspections—progress
12/05/2024Fire-Resistance Rated Construction—progress
07/13/2020Fire-Resistance Rated ConstructionEdward Shalatprogress
07/13/2020FinalEdward Shalatprogress
07/13/2020Fire-Resistant Penetrations and JointsEdward Shalatspecial
07/13/2020Mechanical SystemsEdward Shalatspecial
07/13/2020HVAC insulation and sealing Edward Shalatenergy_progress
07/13/2020HVAC and service water heating system controls Edward Shalatenergy_progress
07/13/2020HVAC and service water heating equipment Edward Shalatenergy_progress
07/13/2020Energy Code Compliance InspectionsEdward Shalatprogress
▾Documents — 539 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
09/15/2026M01455903-I1Request digital key ↗
09/15/2026M01458532-I1Request digital key ↗
08/25/2026M01151076-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00369804-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00369711-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00369787-I1Request digital key ↗
▸Applications & Permits119
▸BISPLAN / WORK APPROVAL APPLICATION86
09/02/2025124055832Open ↗
04/01/2025101019915Open ↗
04/01/2025100975027Open ↗
Showing 3 of 86 on file for this type
▸BISWORK PERMIT APPLICATION30
03/07/2025123179103Open ↗
08/04/2020140928646Open ↗
06/26/2020123475211Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit3
09/04/2026M00369711-I1Open ↗
08/16/2026M01412837-I1Open ↗
08/13/2026M00369787-I1Open ↗
▸Seals & Professional Certifications114
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
07/11/2018123475211Open ↗
07/11/2018123475211Open ↗
09/27/2017123179103Open ↗
Showing 3 of 51 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
07/11/2018123475211Open ↗
09/19/2017123179103Open ↗
09/13/2016122879420Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
07/31/2020140928646Open ↗
07/11/2018123475211Open ↗
09/19/2017123179103Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/15/2026M01455903-I1Open ↗
09/04/2026M00369711-I1Open ↗
09/04/2026M00369804-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026M00369711-I1Open ↗
08/23/2026M00369711-I1Open ↗
08/23/2026M00369711-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M01458532-I1Open ↗
09/23/2026M01458532-I1Open ↗
08/23/2026M00369711-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/31/2020140928646Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/31/2020140928646Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment43
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
08/13/2025123321477Open ↗
Showing 1 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/11/2018123475211Open ↗
09/19/2017123179103Open ↗
Showing 2 of 5 on file for this type
▸BISSPRINKLER SYSTEMS2
03/04/2022123475211Open ↗
03/04/2022123475211Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
10/16/2024123475211Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/23/2016122879420Open ↗
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
07/31/2020140928646Open ↗
07/11/2018123475211Open ↗
09/19/2017123179103Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/04/2026M00369711-I1Open ↗
09/04/2026M00369804-I1Open ↗
08/16/2026M01412837-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
09/19/2017123179103Open ↗
03/20/2017122879420Open ↗
09/13/2016122879420Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/15/2021140928646Open ↗
03/20/2017122879420Open ↗
Showing 2 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/15/2021140928646Open ↗
07/31/2020140928646Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/31/2020140928646Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/04/2020140928646Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY20
02/27/2025101980288Open ↗
02/19/2025100975027Open ↗
02/07/2025100944221Open ↗
Showing 3 of 20 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
01/30/2025101954878Open ↗
01/30/2025102788333Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/15/2017122530181Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/04/2020140928646Open ↗
▸Approvals, Objections & Sign-offs91
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST39
08/14/2025123321477Open ↗
05/05/2025123179103Open ↗
02/26/2025102788333Open ↗
Showing 3 of 39 on file for this type
▸BISLANDMARKS SIGNOFF17
01/30/2025101814271Open ↗
01/30/2025102788333Open ↗
01/28/2025103408108Open ↗
Showing 3 of 17 on file for this type
▸BISLANDMARKS APPROVAL16
07/31/2020140928646Open ↗
11/23/2016122879420Open ↗
Showing 2 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSUPERSEDING LETTER3
03/07/2025123179103Open ↗
06/26/2020123475211Open ↗
06/26/2020123179103Open ↗
▸BISFINAL1
01/29/2025123179103Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/19/2017123179103Open ↗
▸BISSHED LETTER1
04/13/2017140476152Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT39
01/15/2021140928646Open ↗
07/31/2020140928646Open ↗
12/06/2018123321477Open ↗
Showing 3 of 39 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/05/2025123321477Open ↗
01/23/2025123179103Open ↗
10/15/2024123475211Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET21
09/02/2025124055832Open ↗
12/06/2018123321477Open ↗
07/11/2018123475211Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION8
02/26/2025102788333Open ↗
02/11/2025123179103Open ↗
09/26/2017123179103Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/31/2020140928646Open ↗
Showing 1 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
06/26/2020123475211Open ↗
06/26/2020123179103Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
01/30/2025103167092Open ↗
01/30/2025101954878Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FIRE STOPS 27-3451
01/30/2025102788333Open ↗
▸DOB NOWManufacturer's Specifications1
09/15/2026M01458532-I1Open ↗
▸DOB NOWCalculations1
09/15/2026M01458532-I1Open ↗