← Back
Walk-up cooperative
Glen Oaks Village
70-07 261 STREET · BIN 4456578
💬 Discuss this project
1948Year Built
2Stories
C6Building Class
R3-2Zoning
84,976 sfGross Floor Area
120Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 263,750 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
CellarUnder Construction1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLEN OAKS VILLAGE OWNERS, INC.707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREYSTONE ENGINEERING CONSULTING,PC209/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADRIAN WYSOCKI203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPASS CONSTRUCTION OF NGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREYSTONE ENGINEERING CON2973106/21/2024
Building Lifecycle
All (10)Filed (2)Permit Issued (2)Special Inspection (6)
02/12/2026
Permit issued — General Construction
Q01046919-I1-ST
09/09/2025
Filed — Alteration
1ST FLOOR APARTMENT OF 2 STORY BLDG. WORK TO REMOVE FINISHES & REPLACEMENT OF SAME. REMOVE & REPLACE KITCHEN SINK, & GAS RANGE IN EXACT SAME LOCATIONS. REMOVE & REPLACE 3-PC BATH FIXTURES IN EXACT SAME LOCATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q01265119-I1
07/31/2025
Permit issued — General Construction
Q01046919-I1-ST
06/21/2024
Filed — Alteration
EMERGENCY SHORING OF CRAWL SPACE CEILING DUE TO TERMITE DAMAGED STRUCTURAL TIMBER BEAM & SOME JOISTS. PERFORMED UNDER DIRECT SUPERVISION OF PE, THEN, REMOVAL & REPLACEMENT WITH ST OF DAMAGED STRUCTURE TIMBER UNDER PERMIT. NO CHANGE TO OCCUPANCY OR EGRESS
Q01046919-I1
06/19/2024
Special inspection requirement — Structural Steel - Details
TIMOTHY TWEEDY
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIMOTHY TWEEDY
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
TIMOTHY TWEEDY
06/04/2024
Special inspection requirement — Structural Wood Frame
TIMOTHY TWEEDY
05/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
05/06/2024
Special inspection requirement — Final
TIMOTHY TWEEDY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCOMPASS CONSTRUCTION OF N02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCOMPASS CONSTRUCTION OF N07/31/2025
1 project · most recent 06/21/2024
Steel Wood
FiledStatusContractorScope
06/21/2024Permit IssuedCOMPASS CONSTRUCTION OF NSteel, Wood
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/19/2024Structural Steel - DetailsTIMOTHY TWEEDYspecial
06/04/2024Fire-Resistant Penetrations and JointsTIMOTHY TWEEDYspecial
06/04/2024Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
06/04/2024Structural Wood FrameTIMOTHY TWEEDYprogress
05/06/2024Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
05/06/2024FinalTIMOTHY TWEEDYprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01046919-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01046919-I1Open ↗
08/23/2026Q01046919-I1Open ↗
08/23/2026Q01046919-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026Q01046919-I1Open ↗
08/23/2026Q01046919-I1Open ↗
08/23/2026Q01046919-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01265119-I1Open ↗
08/13/2026Q01046919-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01046919-I1Open ↗
08/13/2026Q01265119-I1Open ↗