5 Open Violations 0 unresolved · 5 paperwork only▸
ECB03/23/2012SEC. 28-116.4. COMPLETED/PERMITTED WORK IS NOT SIGNED-OFF. NOTED: THE APPLICATION #402089422 IS NOT SIGNED-OFF. THE PERMITS. EXPIRED 8.1.09.REMEDY: SIGN-OFF THE JOB.Nothing owed — awaiting certificate of correction
ECB05/28/2005RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES.DEPT.OF BUILDING RECORD CO#10082 INDICATES PREMISES TO BE LEGALLY APPROVED FOR A 2 FAMILY.NOW PREMISES CONVERTNothing owed — awaiting certificate of correction
ECB11/18/2004WORK WITHOUT A PERMIT. WORK NOTED: AT RIGHT SIDE 1ST FLOOR PREMISES CLOSED OFF WINDOW WITH FRAMING DRYWALL AND INSTALLED STOVE WITH GAS LINE IN FRONT. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB11/06/2004RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED # OF FAMILIES.DOB RECORD CO#10082 INDICATES PREMISES TO BE LEGALLY APPROVED FOR A 2 FAMILY.NOW PREMISES CONVERTED TO BE 3 FAMILY.Nothing owed — awaiting certificate of correction
ECB11/06/2004WORK W/O A PERMIT.WORK NOTED:AT CELLAR LEVEL PREMISES CREATED A CLASS "A" APT WITH 3 ROOMS.INSTALLED WATER AND WASTE LINES FOR A 3 PIECE BATHROOM(TOILET,SINK,SHOWER)RESIDENTIAL SINK AND INSTALLED GAS LINE FORNothing owed — awaiting certificate of correction
Two family frame · 1.15 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.