1938Year Built
1Stories
M1Building Class
R2Zoning
37,387 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · 47,500 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Siri + Marsik Architects108/08/2025
Ashraf207/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alpha ScaffoldingScaffold207/08/2026
Century Rest and FashionGeneral Contractor107/08/2026
Building Lifecycle
All (28)Filed (3)Permit Issued (3)Signed Off (1)Violation (6)Special Inspection (1)
07/14/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
Q01254057-I1-SH
07/14/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
Q01254064-I1-SF
05/22/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/14/2026
Signed off — Alteration
Facade repairs as indicated on drawings.
Q01250237-I1
08/11/2025
Permit issued — General Construction
Q01250237-I1-GC
08/08/2025
Filed — Alteration
Facade repairs as indicated on drawings.
Q01250237-I1
07/14/2025
Permit issued — Sidewalk Shed
Q01254057-I1-SH
07/14/2025
Permit issued — Supported Scaffold
Q01254064-I1-SF
07/13/2025
Filed — Alteration
Q01254057-I1
07/13/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01254064-I1
07/02/2025
Special inspection requirement — Final
JIRI MARSIK
03/19/2025
Boiler inspection report filed
Initial · no defects · Accepted
05/14/2024
Boiler inspection report filed
Initial · no defects · Accepted
07/18/2023
Boiler inspection report filed
Initial · no defects · Accepted
04/27/2022
Boiler inspection report filed
Initial · no defects · Accepted
04/21/2021
Exp.wire by blr on right,wiska switch missing on comb.air louver,remove wood in boiler room,cover plate missing on outlet,missing spill switch on…
ECB violation · closed
03/05/2021
Boiler inspection report filed
Initial · no defects · Accepted
03/05/2021
Boiler inspection report filed
Subsequent · no defects · Accepted – Civil Penalties Due
08/31/2020
Boiler inspection report filed
Initial · defects found · Accepted
07/03/2019
Boiler inspection report filed
Initial · no defects · Accepted
05/02/2019
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
06/08/2018
Boiler inspection report filed
Initial · no defects · Accepted
09/13/2017
Boiler inspection report filed
Subsequent · no defects · Accepted
06/28/2017
Boiler inspection report filed
Initial · defects found · Accepted
08/29/1995
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 1995; DOB's record still lists it as active
05/15/1992
Closed: Mm
DOB violation · closed on the city's record
09/23/1991
Failure to provide emergency power exit light throughout hallways and stairs.failure to provide ememergency power to exit signs thruout…
ECB violation · closed
08/25/1988
Mm
DOB violation · closed · Issued 1988; DOB's record still lists it as active
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Century Rest and Fashion—
DOB NOW—Alpha Scaffolding—
DOB NOW—Alpha Scaffolding—
BIS—Woodhaven Plumbing & Heating—
BIS—The Baranello Organization—
BIS—Sea Air Cooling—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q01254064-I1Request the plans ↗
08/19/2026Q01254057-I1Request the plans ↗
08/19/2026Q01250237-I1Request the plans ↗
▸Applications & Permits3
▸BISPLACE OF ASSEMBLY2
02/16/2017420939694Open ↗
02/16/2017420939694Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/10/2017420939694Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026Q01254064-I1Open ↗
08/19/2026Q01254057-I1Open ↗
08/19/2026Q01250237-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/16/2017420939694Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q01250237-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026Q01250237-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/16/2017420939694Open ↗
02/16/2017420939694Open ↗
02/16/2017420939694Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/19/2026Q01254057-I1Open ↗
08/13/2026Q01254064-I1Open ↗
08/13/2026Q01250237-I1Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
12/01/2016420939694Open ↗