Elevator cooperative
70-25 YELLOWSTONE BLVD
QUEENS · BIN 4433878
💬 Discuss this project
1965Year Built
24Stories
D4Building Class
C4-5XZoning
575,600 sfGross Floor Area
566Units
LL97 CoveredRent Stabilized34 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: GERARD OWNERS CORP · 102,560 sf lot · 5.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 5 docs
Floor 19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GERARD OWNERS7406/02/2026
GERARD TOWERS CORP103/22/2026
LERARD OWNERS CORP103/22/2026
SYLVAN LERARD GARAGE LLC103/22/2026
INSIGNA RESIDENTIAL GROUP103/22/2026
INSIGNIA REALTY603/22/2026
OWNER OF PREMISES103/22/2026
WPG RESIDENTIAL203/22/2026
GERARD TOWERS OWNERS CP1203/22/2026
CONCEPTUAL CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES1003/21/2026
AE DESIGN SOLUTION603/21/2026
NYC APPROVALS603/21/2026
J A EXPEDITING203/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
HOWARD L ZIMMERMAN ARCHITECTS203/21/2026
KX CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONCEPTUAL CONSTRUCTIONGeneral Contractor1107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor603/21/2026
PRECISE RENOVATION INCGeneral Contractor507/08/2026
POWER COOLING INCGeneral Contractor104/09/2026
ROCKO'S CONSTRUCTION INCGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
NEW AMSTERDAM PLBG & HTGPlumbing107/08/2026
EVS ELECTRIC CORPElectrical103/22/2026
NELSON & TOM MAINT INC DBElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOWARD L ZIMMERMAN ARCHIT1712110/29/2025
AK ENGINEERING PC678508/15/2024
WAVIC ENGINEERING PLLC1733307/20/2024
Building Lifecycle
All (180)Filed (16)Permit Issued (15)Signed Off (9)Facade (FISP) (15)Violation (60)Inspection (7)Objection (28)Special Inspection (30)
06/26/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Q01240462-I1
03/31/2026
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
Q01277617-S1
03/30/2026
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
Q01277617-I1
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
C
03/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Violation issued (HPD, closed)
A
02/25/2026
Violation issued (FDNY_NOV, closed)
02/19/2026
Permit issued — Mechanical Systems
Q01268757-I1-MS
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, closed)
B
01/04/2026
Violation issued (HPD, closed)
C
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, closed)
C
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, closed)
C
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, closed)
A
01/04/2026
Violation issued (HPD, open)
B
12/31/2025
Permit issued — General Construction
Q01277617-I1-GC
11/03/2025
Permit issued — Plumbing
Q01277617-S1-PL
10/29/2025
Filed — Alteration
Q01268757-I1
10/06/2025
Cycle 10 facade report signed — SWARMP
09/09/2025
Cycle 10 facade report submitted
08/28/2025
Filed — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
Q01277617-S1
08/28/2025
Filed — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
Q01277617-I1
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Maja Paklar
08/26/2025
Special inspection requirement — Lighting in dwelling units
Maja Paklar
08/26/2025
Special inspection requirement — Final
Maja Paklar
07/29/2025
Cycle 10 facade inspection completed
07/09/2025
Signed off — Alteration
PROPOSED VRF HEAT PUMP SPLIT SYSTEM TO SERVE FOYER, LOBBY AND MAIL ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00752477-S1
07/02/2025
Signed off — Alteration
PROPOSED VRF HEAT PUMP SPLIT SYSTEM TO SERVE FOYER, LOBBY AND MAIL ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00752477-S2
07/01/2025
Permit issued — Suspended Scaffold
Q01240462-I1-SC
06/17/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Q01240462-I1
06/09/2025
Signed off — Alteration
PROPOSED VRF HEAT PUMP SPLIT SYSTEM TO SERVE FOYER, LOBBY AND MAIL ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00752477-I1
06/02/2025
Permit issued — Structural
Q00752477-S2-ST
04/10/2025
Permit issued — General Construction
Q01184645-I1-GC
02/25/2025
Signed off — Alteration
Residential plumbing fixture work at apartment 9V. No change to use, egress or occupancy.
Q01040268-I1
02/25/2025
Signed off — Alteration
Residential plumbing fixture work at apartment 9V. No change to use, egress or occupancy.
Q01040268-S1
02/24/2025
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 1D ON THE FIRST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01184645-I1
02/21/2025
Special inspection requirement — Insulation placement and R values
Miriam Hubbard
02/21/2025
Special inspection requirement — Lighting controls
Miriam Hubbard
02/21/2025
Special inspection requirement — Final
Miriam Hubbard
02/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Miriam Hubbard
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPOWER COOLING INC02/19/2026
DOB NOWGeneral ConstructionSigned-offROCKO'S CONSTRUCTION INC12/31/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR11/03/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/01/2025
DOB NOWStructuralSigned-offCONCEPTUAL CONSTRUCTION06/02/2025
DOB NOWGeneral ConstructionPermit IssuedPRECISE RENOVATION INC04/10/2025
DOB NOWGeneral ConstructionSigned-offPRECISE RENOVATION INC08/05/2024
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS07/30/2024
DOB NOWGeneral ConstructionSigned-offPRECISE RENOVATION INC06/27/2024
DOB NOWMechanical SystemsSigned-offCONCEPTUAL CONSTRUCTION01/18/2024
DOB NOWGeneral ConstructionSigned-offCONCEPTUAL CONSTRUCTION01/18/2024
DOB NOWGeneral ConstructionSigned-offCONCEPTUAL CONSTRUCTION05/15/2023
DOB NOWMechanical SystemsSigned-offCONCEPTUAL CONSTRUCTION05/15/2023
DOB NOWSidewalk ShedSigned-offT.B.C. GROUP LTD03/08/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/05/2020
BISOTISSUEDSKYLINE RESTORATION INC02/22/2022
BISOTISSUEDSKYLINE RESTORATION INC03/30/2021
BISPLISSUEDVSP MECHANICAL INC10/18/2017
BISOTISSUEDEMPIRE A&A CONSTRUCTION I09/06/2017
BISOTISSUEDSKYLINE RESTORATION INC03/07/2017
BISOTISSUEDSKYLINE RESTORATION INC01/31/2017
BISMHISSUEDHERITAGE CHIMNEY SERVICE10/27/2016
BISOTISSUEDSKYLINE RESTORATION INC10/12/2016
BISEQISSUEDHERITAGE CHIMNEY SERVICE10/11/2016
BISOTISSUEDMELI CONTRACTING CO INC07/01/2016
BISOTISSUEDQUALITY BUILDING CONSTRUTION05/21/2015
BISEQISSUEDSTEEL SYSTEMS LLC05/14/2015
BISOTISSUEDCGI NORTHEAST INC04/30/2015
BISOTISSUEDQUALITY BUILDING CONSTRUTION04/15/2015
BISOTISSUEDQUALITY BUILDING CONSTRUTION12/24/2014
BISOTISSUEDCGI NORTHEAST INC07/28/2014
BISOTISSUEDQUALITY BUILDING CONSTRUTION05/28/2014
BISEQISSUEDSTEEL SYSTEMS LLC05/08/2014
BISOTISSUEDQUALITY BUILDING CONSTRUTION04/29/2014
BISEQISSUEDSTEEL SYSTEMS LLC03/20/2014
BISOTISSUEDCGI NORTHEAST INC03/12/2014
BISPLISSUEDVINNY BELLS PLUMBING CORP06/25/2012
BISOTISSUEDBNY CONSTRUCTION INC04/30/2012
BISEQISSUEDSTEEL INSUSTRIES, INC11/22/2010
BISOTISSUEDQUALITY BUILDING CONSTRUTION10/26/2010
+ 25 more permits on file
9 projects · most recent 01/20/2026
General Wiring
FiledStatusContractorScope
01/20/2026Permit IssuedBRANDL ELECTRIC INC.General Wiring
10/24/2025CompleteBRANDL ELECTRIC INC.—
05/09/2025CompleteS.A.L. ELECTRIC CO INC.—
06/09/2024CompleteALL POWER ELECL INSTLRSGeneral Wiring
06/01/2023CompleteEVS ELECTRIC CORPGeneral Wiring
06/02/2022CompleteCROSS BROTHERS ELECTRICGeneral Wiring
09/01/2021CompleteNELSON & TOM MAINT INC DB—
10/20/2020CompleteTOP SHELF ELECTRIC CORP—
09/29/2019CompleteJAM ELECTRICAL CORP—
1 project · most recent 06/17/2025
FiledStatusContractorScope
06/17/2025Signed-offSTRUCTUAL PRESV SYSTEM—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/26/2025Energy Code Compliance InspectionsMaja Paklarprogress
08/26/2025Lighting in dwelling unitsMaja Paklarenergy_progress
08/26/2025FinalMaja Paklarprogress
02/21/2025Insulation placement and R valuesMiriam Hubbardenergy_progress
02/21/2025Lighting controlsMiriam Hubbardenergy_progress
02/21/2025FinalMiriam Hubbardprogress
02/21/2025Energy Code Compliance InspectionsMiriam Hubbardprogress
02/21/2025Lighting in dwelling unitsMiriam Hubbardenergy_progress
08/23/2024Structural Stability – Alterations of existing buildingsAri Kamospecial
08/23/2024Concrete - Cast-In-PlaceAri Kamospecial
08/23/2024Structural Steel - DetailsAri Kamospecial
08/23/2024Structural Steel - WeldingAri Kamospecial
08/23/2024Post-installed AnchorsAri Kamospecial
08/23/2024Structural Steel - High Strength BoltingAri Kamospecial
08/23/2024FinalAri Kamoprogress
08/01/2024Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
07/30/2024Structural Steel - Details—special
07/30/2024Structural Steel - Welding—special
07/30/2024Structural Steel - High Strength Bolting—special
07/18/2024Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
04/23/2024Post-installed AnchorsDARIUSZ LUCZAKspecial
04/23/2024Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
04/23/2024Energy Code Compliance InspectionsDARIUSZ LUCZAKprogress
04/23/2024Lighting in dwelling unitsDARIUSZ LUCZAKenergy_progress
04/23/2024Finalisadora acostaprogress
Latest 25 of 36.
▾Documents — 280 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
08/26/2026Q00752477-P1Request digital key ↗
08/26/2026Q00752477-P2Request digital key ↗
08/21/2026Q01040268-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/27/2026Q00415132-I1Request digital key ↗
08/15/2026Q00415132-P2Request digital key ↗
08/15/2026Q00415132-P1Request digital key ↗
▸Applications & Permits47
▸BISWORK PERMIT APPLICATION26
03/30/2021440626654Open ↗
10/20/2017421011265Open ↗
09/18/2017421011265Open ↗
Showing 3 of 26 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
10/09/2020440626654Open ↗
09/18/2020440626654Open ↗
11/15/2017421011265Open ↗
Showing 3 of 19 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
03/10/2021440626654Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
03/10/2021440626654Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
12/12/2018421011265Open ↗
11/27/2017420944526Open ↗
04/13/2017421365748Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026Q00415132-P2Open ↗
08/27/2026Q00415132-P1Open ↗
08/27/2026Q00415132-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q01184645-I1Open ↗
09/01/2026Q01184645-I1Open ↗
08/31/2026Q01277617-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q01040268-S1Open ↗
09/01/2026Q01040268-P1Open ↗
08/28/2026Q00752477-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/18/2020440626654Open ↗
10/07/2016440351441Open ↗
06/30/2016440320207Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/07/2016440351441Open ↗
06/30/2016440320207Open ↗
03/19/2014440133801Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/07/2016440351441Open ↗
06/30/2016440320207Open ↗
03/19/2014440133801Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/26/2010420279683Open ↗
09/28/2010420257028Open ↗
05/09/2008410109822Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/28/2010420257028Open ↗
05/09/2008410109822Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/18/2020440626654Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/15/2017421011265Open ↗
04/18/2016421011265Open ↗
▸BISSCHEDULE B - PLUMBING2
03/14/2012420534096Open ↗
03/14/2012420534096Open ↗
▸Safety & Tenant Protection9
▸BISTENANT PROTECTION PLAN AND NOTES4
09/18/2020440626654Open ↗
10/07/2016440351441Open ↗
10/08/2016421365748Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026Q00415132-I1Open ↗
08/13/2026Q00415132-P2Open ↗
08/13/2026Q00415132-P1Open ↗
▸BISSTREET TREE CHECKLIST1
04/18/2016421011265Open ↗
▸BISST-1 Street Tree Checklist1
03/14/2012420534096Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026Q01277617-I1Open ↗
08/19/2026Q01277617-S1Open ↗
08/15/2026Q00752477-S1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/18/2020440626654Open ↗
10/08/2016421365748Open ↗
06/30/2016440320207Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/14/2012420534096Open ↗
10/26/2010420279683Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/18/2026Q01268757-I1Open ↗
08/13/2026Q01040268-S1Open ↗
08/13/2026Q01040268-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/28/2010420257028Open ↗
05/09/2008410109822Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/12/2015421096717Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
12/12/2018421011265Open ↗
11/27/2017420944526Open ↗
04/13/2017421365748Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
02/17/2022440626654Open ↗
12/12/2018421011265Open ↗
11/27/2017420944526Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/17/2022440626654Open ↗
03/30/2021440626654Open ↗
03/30/2021440626654Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00752477-S1Open ↗
08/13/2026Q00752477-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/19/2014440133801Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/14/2012420534096Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/18/2020440626654Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/17/2022440626654Open ↗
03/05/2021440626654Open ↗
02/18/2021440626654Open ↗
Showing 3 of 7 on file for this type
▸BISSOIL REPORT1
06/30/2016440320207Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
10/23/2025440626654Open ↗
12/12/2018421011265Open ↗
11/27/2017420944526Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
04/08/2015421096717Open ↗
03/10/2014420944606Open ↗
02/07/2014420944526Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/26/2020440626654Open ↗
01/12/2017421011265Open ↗
01/05/2015420944606Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER1
05/28/2015420944606Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
02/17/2022440626654Open ↗
09/18/2020440626654Open ↗
12/12/2018421011265Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET11
10/08/2016421365748Open ↗
04/18/2016421011265Open ↗
04/08/2015421096717Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
02/18/2021440626654Open ↗
10/05/2020440626654Open ↗
01/12/2017421011265Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/18/2020440626654Open ↗
10/07/2016440351441Open ↗
06/30/2016440320207Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
12/12/2018421011265Open ↗
11/27/2017420944526Open ↗
▸Other Documents4
▸DOB NOWWaiver Document2
08/20/2026Q01184645-I1Open ↗
08/13/2026Q00752477-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/22/2015440133801Open ↗
▸DOB NOWIRA Certification1
08/13/2026Q01240462-I1Open ↗